期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Availability-based maintenance optimization under unequal inspection period and imperfect repair 被引量:1
1
作者 Liu Yang Su Chun 《Journal of Southeast University(English Edition)》 EI CAS 2018年第3期303-308,共6页
Taking the multi-component system as research object, a maintenance optimization model based on the unequal inspection period and imperfect repair is established by considering the requirement of expected availability... Taking the multi-component system as research object, a maintenance optimization model based on the unequal inspection period and imperfect repair is established by considering the requirement of expected availability for improving the system's availability. An age reduction factor is used to describe the effect of imperfect repair, and the modelling approach for the unequal inspection period is proposed. Unavailable situations are classified into three kinds of independent cases, and the availability is calculated accordingly. Based on the analysis of the relationship between the unavailable cases and the unequal inspection period, an optimization model under imperfect repair is established to optimize the system's expected availability. A case study of a wind turbine is provided, and three key components, i.e. gearbox, generator and spindle, are considered. The optimization results of the unequal inspection period model and the equal inspection period model are compared. The results show that the unequal inspection period model based on availability can update the maintenance plan so as to optimize maintenance activities and improve the system's availability. 展开更多
关键词 age reduction inspection period unequal periodmaintenance maintenance optimization AVAILABILITY
下载PDF
The Optimization of Preventive Maintenance Scheduling for Production Machine of Production System in Finite Time Horizon
2
作者 韩帮军 潘军 +1 位作者 范秀敏 马登哲 《Journal of Donghua University(English Edition)》 EI CAS 2004年第1期112-116,共5页
The recursion relation of preventive maintenance (PM) cycle is built up concerning the concept of effective age and age setback factor proposed in this paper, which illustrates the dynamic relationship between failure... The recursion relation of preventive maintenance (PM) cycle is built up concerning the concept of effective age and age setback factor proposed in this paper, which illustrates the dynamic relationship between failure rate and preventive maintenance activity. And the nonlinear optimal PM policy model satisfying the reliability constraints in finite time horizon following Weibull distribution is proposed. The model built in this paper avoids the shortcoming of steady analytical PM model in infinite time horizon and can be used to aid scheduling the maintenance plan and providing decision supporting for job shop scheduling. 展开更多
关键词 Preventive maintenance age reduction factor Finite time horizon Failure rate
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部