Evaluating performance of individual features of WiMAX technology is a topic of widespread discussion. Currently, there is no quantitative way of measuring WiMAX technology so that wireless operators can meet their de...Evaluating performance of individual features of WiMAX technology is a topic of widespread discussion. Currently, there is no quantitative way of measuring WiMAX technology so that wireless operators can meet their design objectives. This paper outlines a set of design criteria for WiMAX and provides a decision-making aid that ranks the importance of criteria using Analytic Hierarchy Process (AHP). This ranking should sufficiently reflect market expectations of the relative importance of various design criteria. A model integrating AHP priorities with enhanced Data Envelopment Analysis (DEA) is the basis for formulating a technological value in simple, comparable format. A case study is provided to show how this technological value is used to evaluate a three year network deployment plan. In the future, this model could be extended to WiMAX equipment suppliers for the purpose of validating performance targets of individual criteria, and enhancing supplier roadmaps for future network development.展开更多
According to the elements of hydrogeological conditions,lithology,stratigraphic thermal physical parameters,construction technology and economic rational elements,the evaluation system of ground source heat pump( GSHP...According to the elements of hydrogeological conditions,lithology,stratigraphic thermal physical parameters,construction technology and economic rational elements,the evaluation system of ground source heat pump( GSHP) were established in Baotou plain. The factor weights were determined by using analytic hierarchy process,and the comprehensive element method was selected to evaluate the region suitability of GSHP system. The results show that the suitable area is 559. 63 km2 for utilizing GSHP in the studied area,accounting for 62. 58% of the total area; while the unsuitable area is 334. 60 km2,accounting for37.42%. The evaluating results can provide not only a scientific basis for development and utilization rationally of shallow geothermal heat in Baotou,but also offer an important reference to the other areas.展开更多
The region of investigation is part of the western desert of Iraq covering an area of about 12,400 km2, this region includes several large wadis discharging to the Euphrates River. Since the Tectonic features in parti...The region of investigation is part of the western desert of Iraq covering an area of about 12,400 km2, this region includes several large wadis discharging to the Euphrates River. Since the Tectonic features in particular fault zones play a significant role with respect to groundwater flow in hard rock terrains. The present research is focus on investigate lineaments that have been classified as suspected faults by means of remote sensing techniques and digital terrain evaluation in combination with interpolating groundwater heads and MLU pumping tests model in a fractured rock aquifer, Lineaments extraction approach is illustrated a fare matching with suspected faults, moreover these lineaments conducted an elevated permeability zone.展开更多
In Ethiopian construction projects, schedule delay risk is a predominant issue because it is not properly addressed. Although several studies have been focused on the various effects of risk in construction projects, ...In Ethiopian construction projects, schedule delay risk is a predominant issue because it is not properly addressed. Although several studies have been focused on the various effects of risk in construction projects, limited efforts have been made to investigate the typical and the overall schedule delay risk. In this study, our aim is to detect the typical and overall schedule delay risk throughout the construction project lifecycle, which consists of the pre-construction, construction, and post-construction stages, and compare the stages with each other. Common criteria, sub-criteria, and attributes were developed for all alternatives for the purpose of making a risk decision. The methodology that was followed integrated the multiplecriteria decision-making(MCDM) model of fuzzy analytic hierarchy process comprehensive evaluation(FAHPCE)and the relative important index(RII). Data were collected from 77 participants, who were selected through purposive sampling from different contracting organizations in Ethiopian construction projects by means of questionnaires that were distributed to experienced experts. The findings showed that there is a typical delay risk either in the type or in the level of the different construction activities.Consequently, the most influenced alternative is the construction stage because of the high-risk responsibility,resource, and contract condition related criteria. The postconstruction stage was the second most influenced stage because of the high-risk responsibility-related criteria. The pre-constructed stage was the least influenced stage that consist high-risk criteria of responsibility, resource, and contract condition related. These differences provided noteworthy information about risk mitigation in construction projects by identifying the exact risk level on specific activity to make appropriate decision.展开更多
Pile-anchor retaining structure is widely used in foundation pit engineering and side slope engineering in many countries. In contrast to strut, pile-anchor retaining structure has its typical features and advantages....Pile-anchor retaining structure is widely used in foundation pit engineering and side slope engineering in many countries. In contrast to strut, pile-anchor retaining structure has its typical features and advantages. It does not occupy the internal space of the foundation pit, and the project cost is much lower. Accurate prediction of the lateral displacement of the retaining structure is very important in the design stage. A simplified analysis method and several calculation assumptions of the lateral deformation of pile-anchor retaining structures are set up according to the engineering features. The expression function of lateral displacement versus depth is solved by means of a fitted function and the quasi-elastic summation method. The parameters are obtained through the stiffness equation of the anchors and the principle of minimum potential energy. The analytical evaluation of the lateral deformation curve is then completed, whose applicability is proved through practical engineering.展开更多
文摘Evaluating performance of individual features of WiMAX technology is a topic of widespread discussion. Currently, there is no quantitative way of measuring WiMAX technology so that wireless operators can meet their design objectives. This paper outlines a set of design criteria for WiMAX and provides a decision-making aid that ranks the importance of criteria using Analytic Hierarchy Process (AHP). This ranking should sufficiently reflect market expectations of the relative importance of various design criteria. A model integrating AHP priorities with enhanced Data Envelopment Analysis (DEA) is the basis for formulating a technological value in simple, comparable format. A case study is provided to show how this technological value is used to evaluate a three year network deployment plan. In the future, this model could be extended to WiMAX equipment suppliers for the purpose of validating performance targets of individual criteria, and enhancing supplier roadmaps for future network development.
基金Supported by project of Shallow Geothermal Energy Survey of Inner Mongolia Baotou Plain(No.2010-3-SK35)
文摘According to the elements of hydrogeological conditions,lithology,stratigraphic thermal physical parameters,construction technology and economic rational elements,the evaluation system of ground source heat pump( GSHP) were established in Baotou plain. The factor weights were determined by using analytic hierarchy process,and the comprehensive element method was selected to evaluate the region suitability of GSHP system. The results show that the suitable area is 559. 63 km2 for utilizing GSHP in the studied area,accounting for 62. 58% of the total area; while the unsuitable area is 334. 60 km2,accounting for37.42%. The evaluating results can provide not only a scientific basis for development and utilization rationally of shallow geothermal heat in Baotou,but also offer an important reference to the other areas.
文摘The region of investigation is part of the western desert of Iraq covering an area of about 12,400 km2, this region includes several large wadis discharging to the Euphrates River. Since the Tectonic features in particular fault zones play a significant role with respect to groundwater flow in hard rock terrains. The present research is focus on investigate lineaments that have been classified as suspected faults by means of remote sensing techniques and digital terrain evaluation in combination with interpolating groundwater heads and MLU pumping tests model in a fractured rock aquifer, Lineaments extraction approach is illustrated a fare matching with suspected faults, moreover these lineaments conducted an elevated permeability zone.
文摘In Ethiopian construction projects, schedule delay risk is a predominant issue because it is not properly addressed. Although several studies have been focused on the various effects of risk in construction projects, limited efforts have been made to investigate the typical and the overall schedule delay risk. In this study, our aim is to detect the typical and overall schedule delay risk throughout the construction project lifecycle, which consists of the pre-construction, construction, and post-construction stages, and compare the stages with each other. Common criteria, sub-criteria, and attributes were developed for all alternatives for the purpose of making a risk decision. The methodology that was followed integrated the multiplecriteria decision-making(MCDM) model of fuzzy analytic hierarchy process comprehensive evaluation(FAHPCE)and the relative important index(RII). Data were collected from 77 participants, who were selected through purposive sampling from different contracting organizations in Ethiopian construction projects by means of questionnaires that were distributed to experienced experts. The findings showed that there is a typical delay risk either in the type or in the level of the different construction activities.Consequently, the most influenced alternative is the construction stage because of the high-risk responsibility,resource, and contract condition related criteria. The postconstruction stage was the second most influenced stage because of the high-risk responsibility-related criteria. The pre-constructed stage was the least influenced stage that consist high-risk criteria of responsibility, resource, and contract condition related. These differences provided noteworthy information about risk mitigation in construction projects by identifying the exact risk level on specific activity to make appropriate decision.
基金the National Natural Science Foundation of China (No. 51178267)the Science and Technology Committee of Shanghai (No. 10231200600)
文摘Pile-anchor retaining structure is widely used in foundation pit engineering and side slope engineering in many countries. In contrast to strut, pile-anchor retaining structure has its typical features and advantages. It does not occupy the internal space of the foundation pit, and the project cost is much lower. Accurate prediction of the lateral displacement of the retaining structure is very important in the design stage. A simplified analysis method and several calculation assumptions of the lateral deformation of pile-anchor retaining structures are set up according to the engineering features. The expression function of lateral displacement versus depth is solved by means of a fitted function and the quasi-elastic summation method. The parameters are obtained through the stiffness equation of the anchors and the principle of minimum potential energy. The analytical evaluation of the lateral deformation curve is then completed, whose applicability is proved through practical engineering.