期刊文献+
共找到162篇文章
< 1 2 9 >
每页显示 20 50 100
Estimation of the Maximum Annual Loads Modeling for Kingdom of Bahrain 被引量:2
1
作者 Isa Salman Qamber 《Journal of Energy and Power Engineering》 2013年第10期2006-2011,共6页
The present paper proposes the impact of the air temperature on electricity demand as expected. It is clear that the annual maximum load is recorded versus the years starting by the year 2009 up to 2012. At present, t... The present paper proposes the impact of the air temperature on electricity demand as expected. It is clear that the annual maximum load is recorded versus the years starting by the year 2009 up to 2012. At present, the graph fitting technique is applied with some mathematical and computational tools based on the actual values of the years 2009 up to 2012 considering the lower values, the higher values and the average values of the annual maximum loads for Kingdom of Bahrain. For the three scenarios, the models are obtained by curve fitting technique. As well, the model of actual loads is obtained finally which has mostly the closest values obtained. 展开更多
关键词 annual maximum load curve fitting load scenarios.
下载PDF
Annual Maximum Loads Estimation Modeling for Kingdom of Bahrain
2
作者 Isa S. Qamber 《Engineering(科研)》 2013年第1期104-107,共4页
The present paper proposes the impact of the air temperature on electricity demand as expected. The annual maximum load is recorded versus the years starting by the year 2009. At present, the graph fitting was applied... The present paper proposes the impact of the air temperature on electricity demand as expected. The annual maximum load is recorded versus the years starting by the year 2009. At present, the graph fitting was applied with some mathematical and computational tools considering the lower values, the higher values and the average values of the annual maximum loads of Kingdom of Bahrain. For the three scenarios, the models are obtained by curve fitting technique. As well, the model of actual loads is obtained finally which has mostly the closest values obtained. 展开更多
关键词 annual MAXIMUM load CURVE FITTING load Scenarios
下载PDF
Analysis on the Pollution Load of Non-point Source Pollution and Surface Runoff of A Typical Village in Baiyangdian Lake Basin 被引量:5
3
作者 孙添伟 陈家军 +1 位作者 史震天 王浩 《Meteorological and Environmental Research》 CAS 2010年第9期97-100,共4页
[Objective] The characteristic of non-point source pollution of a typical village in Baiyangdian Lake basin was studied.[Method] The discharge of domestic sewage and solid wastes of the typical village was investigate... [Objective] The characteristic of non-point source pollution of a typical village in Baiyangdian Lake basin was studied.[Method] The discharge of domestic sewage and solid wastes of the typical village was investigated,and both pollutant and nutrient element content were monitored,as well as the water quality and quantity of rainfall runoff.[Result] The non-point source pollution of livestock manure was far more serious than the sum of domestic sewage and domestic waste in this village,and the annual emission of total organic carbon(TOC),total nitrogen(TN) and total phosphorus(TP) was 37 794.0,4 102.9 and 1 923.7 kg,respectively.The event mean concentration(EMC)of chemical oxygen demand COD,TN and TP in rainfall runoff was 44.5,78.8,1.3 mg/L,respectively,and annual pollution load was 7.6,13.4 and 0.2 kg/hm2,respectively,while the annual pollution load of COD accounted for 5.1% of standard farmland,and that of TN and TP occupied 4.5% and 0.49% of slope farmland.[Conclusion] Livestock manure was the main source of non-point source pollution in the village and the annual pollution load of non-point source pollution was obtained. 展开更多
关键词 VILLAGE Non-point source pollution EMC annual pollution load China
下载PDF
双馈型风电机组传动链降载控制技术研究与仿真
4
作者 刘河生 雷航 张瑞刚 《热力发电》 CAS CSCD 北大核心 2024年第3期34-41,共8页
为定量研究双馈型风力发电机组传动链的扭振控制,提出了一种基于卡尔曼滤波的反馈控制策略,并通过仿真计算的方式对比了传动链扭振的控制效果。以7.0 MW双馈型风力发电机组传动链为研究对象,采用卡尔曼滤波估计传动链扭振角度,并以低速... 为定量研究双馈型风力发电机组传动链的扭振控制,提出了一种基于卡尔曼滤波的反馈控制策略,并通过仿真计算的方式对比了传动链扭振的控制效果。以7.0 MW双馈型风力发电机组传动链为研究对象,采用卡尔曼滤波估计传动链扭振角度,并以低速轴扭振速度估计值为参考设计了发电机附加电磁转矩作用于风电机组转矩控制,与虚拟阻尼控制、无阻尼控制进行了20年全生命周期内的载荷与发电量计算对比。结果表明:经过卡尔曼滤波估计的低速轴扭角与实际值的相关性可以达到0.99;基于卡尔曼滤波的反馈控制分别与虚拟阻尼控制、无阻尼控制的关键差异为,传动链低速轴等效疲劳载荷分别降低2.11%、4.89%,传动链高速轴等效疲劳载荷分别降低1.99%、4.78%,发电量分别降低200、700 k W·h。卡尔曼滤波对传动链扭角估计较准确,且以卡尔曼滤波估计得到的低速轴扭振速度设计的附加电磁转矩对传动链扭振具有非常好的抑制效果。 展开更多
关键词 双馈型风电机组 传动链扭振 卡尔曼滤波 等效疲劳载荷 年发电量
下载PDF
成都市主城区道路冲洗径流污染研究
5
作者 杨之倩 寻亚非 +3 位作者 蒋宇 康愉晨 蒲梦晗 陈文清 《中国科技论文》 CAS 2024年第1期77-84,130,共9页
为评估城市道路冲洗径流污染程度,于2022年3—8月在成都市主城区内选取交通性路段、商业性路段、生活性路段和餐饮性路段进行冲洗水径流采样,通过对采样结果进行差异显著性分析,探究道路类型、降雨冲刷和较高气温(>30℃)对冲洗径流... 为评估城市道路冲洗径流污染程度,于2022年3—8月在成都市主城区内选取交通性路段、商业性路段、生活性路段和餐饮性路段进行冲洗水径流采样,通过对采样结果进行差异显著性分析,探究道路类型、降雨冲刷和较高气温(>30℃)对冲洗径流污染负荷的影响,综合考虑这3个因素推导道路冲洗径流年污染排放量估算公式。结果表明:不同类型道路冲洗径流污染程度存在差异,其中,餐饮性路段严重,生活性路段和商业性路段次之,交通性路段最轻;通过相关性分析推测,路两侧餐饮经营活动的污染排放是导致不同类型道路冲洗径流污染负荷值存在差异的主要原因;此外,较高气温(>30℃)会导致道路冲洗经流污染负荷升高,而降雨则反之;以成都市为例进行估算,2022年主城区道路冲洗径流中化学需氧量(chemical oxygen demand,COD)、总氮(total nitrogen,TN)、总磷(total phosphorus,TP)、悬浮物(suspended solids,SS)和氨氮(ammonia nitrogen,NH3-N)的排放量分别为3 506、167.56、30.32、1 441、55.687 kg。 展开更多
关键词 城市道路冲洗径流 年污染排放量 污染负荷 影响因素
下载PDF
冷热双向全周期维度蓄能空调系统设计优化
6
作者 周科 李锦堂 +5 位作者 张广秋 谈竹奎 王扬 孙宗宇 李骥 肖小兵 《建筑节能(中英文)》 CAS 2024年第9期42-49,共8页
蓄能空调系统涉及“源”侧电力供应和“荷”侧建筑冷热需求双重动态变化特性,系统的容量配置是一个技术经济寻优问题。受室内外多种因素共同影响,建筑冷热负荷每天的逐时分布规律差别较大,传统上仅基于设计日等典型周期逐时负荷分布规... 蓄能空调系统涉及“源”侧电力供应和“荷”侧建筑冷热需求双重动态变化特性,系统的容量配置是一个技术经济寻优问题。受室内外多种因素共同影响,建筑冷热负荷每天的逐时分布规律差别较大,传统上仅基于设计日等典型周期逐时负荷分布规律的设计方法使得蓄能空调系统容量的配置不合理。突破传统设计方法的不足,提出以空调系统全年运行性能为导向的冷热双向全周期维度蓄能空调系统性能化设计方法,能够考虑到全供暖季、全制冷季每天的逐时动态负荷分布规律,耦合建筑冷热负荷双向需求,获得更加科学合理的蓄能空调系统容量配置方案。用具体案例进行了设计方法展示。 展开更多
关键词 蓄能空调系统 冷热负荷双重需求 全年逐时动态负荷 性能化设计 设计日
下载PDF
Peak Load Modeling for Kingdom of Bahrain
7
作者 Isa S. Qamber 《Journal of Software Engineering and Applications》 2012年第12期46-49,共4页
Deriving some models to estimate the electrical demand for future for the Kingdom of Bahrain is carried out in the present study. The ambient temperature is taken into the account as well as the time factor (Year). Th... Deriving some models to estimate the electrical demand for future for the Kingdom of Bahrain is carried out in the present study. The ambient temperature is taken into the account as well as the time factor (Year). The model was developed in away describing the electric power demand during a summer period. The estimated values of the maximum electrical load is obtained and evaluated on actual peak load data of the Kingdom of Bahrain. 展开更多
关键词 PEAK load CURVE FITTING Maximum annual load
下载PDF
Static loading and vertical displacement at southern Siberia
8
作者 Anton V.Timofeev Dmitriy G.Ardyukov Vladimir Yu.Timofeev 《Geodesy and Geodynamics》 2017年第3期160-168,共9页
Seismic method is usually used for elastic parametric estimation. This is why this method presents dynamic parameters of Earth. Frequency seismic range changes greatly from geodynamic modelling time. Now we have oppor... Seismic method is usually used for elastic parametric estimation. This is why this method presents dynamic parameters of Earth. Frequency seismic range changes greatly from geodynamic modelling time. Now we have opportunity to use geodesy result for some years for elastic parameters estimation. Static solution from elastic theory may be used for the interpretation of long term results. It presents static elastic parameter. The inverse problem for different types of vertical surface loading on one year period is calculated. Two cases of loading with maximal and minimal area are presented. Results are determined by space geodesy and leveling methods. Current relation between atmospheric pressure and vertical displacements was estimated at the center of Siberian Anti Cyclone with size varied from 2000 km to 3000 kin. Pressure-displacement coefficients (PDC) can be achieved by three years obser- vation (0.997 mm/mbar for NVSK GPS station). It is used for elastic module study of geology medium with maximum thickness up to 600 km. In the context of elastic model, the modulus of rigidity is estimated to be 113 GPa. Vast expanse of anti-cyclone may relate with rheology of crust and upper mantle. Smaller size of surface loading - local loading is seasonal variation of water reservoir. Annual vertical changes were obtained by leveling near the dam of the reservoir. PDC ratio was 1.15 mm/bar for these places. In elastic theory, the Young modulus E = 80 GPa (Poisson ratio = 0.25, the modulus of rigidity - 32 GPa) was calculated by sixteen years of leveling measurements. This result can effectively be represented for upper crust. Our results were checked by solution for coseismic displacement of Chyia- Altai earthquake (Sep. 27, 2003, M = 7.3). Coseismic results calculated by static modules agree with experimental coseismic GPS data at 10% level. 展开更多
关键词 Static loading Vertical annual subsidence Space geodesy and leveling method Barometry Elastic modules Earthquake
下载PDF
循环水养殖车间全年负荷计算与能耗分析
9
作者 张海琳 吴娟 +3 位作者 许陆顺 张羽 张忠斌 赵娟 《南京师范大学学报(工程技术版)》 CAS 2023年第4期50-56,共7页
循环水养殖车间内部负荷不仅与建筑的冷热负荷相关,还涉及到养殖池的热负荷.针对养殖车间全年负荷以及能耗量设计出了一套计算方案.以福建省南平市某养殖车间为例,在车间内部的水池温度和空气温湿度一定的情况下,对全年负荷进行了计算.... 循环水养殖车间内部负荷不仅与建筑的冷热负荷相关,还涉及到养殖池的热负荷.针对养殖车间全年负荷以及能耗量设计出了一套计算方案.以福建省南平市某养殖车间为例,在车间内部的水池温度和空气温湿度一定的情况下,对全年负荷进行了计算.循环水养殖车间热负荷占养殖车间能耗的一大部分,其中补水加热负荷所占比例较大.在此基础上,通过改变养殖池温度和车间环境温度,分析了养殖特定鱼类的耗能情况.结果表明,养殖池温度每提高1℃会使养殖平均日能耗量约提升6.9%,总能耗约降低2.6%. 展开更多
关键词 循环水养殖 全年负荷 计算方法 能耗量 温湿度
下载PDF
某星级酒店空调冷热源方案分析
10
作者 李雷雷 《洁净与空调技术》 2023年第1期71-73,76,共4页
以武汉某五星级酒店项目为例,对全年冷热负荷进行模拟计算,且对冷热源方案进行对比分析,在此基础上从运行费用和初投资角度对冷机的定频、变频组合方式进行比较分析,得出适合于本项目的冷机和锅炉配置方案,为类似工程项目空调冷热源优... 以武汉某五星级酒店项目为例,对全年冷热负荷进行模拟计算,且对冷热源方案进行对比分析,在此基础上从运行费用和初投资角度对冷机的定频、变频组合方式进行比较分析,得出适合于本项目的冷机和锅炉配置方案,为类似工程项目空调冷热源优化选择提供参考。 展开更多
关键词 冷热源 全年负荷 运行费用 酒店
下载PDF
云县台垂直摆异常原因分析
11
作者 施栋鑫 李利波 +1 位作者 曾宁 蔡舒梅 《地震地磁观测与研究》 2023年第S01期175-178,共4页
1研究背景。倾斜应变测量是地震预测预报研究的重要手段。李智蓉等(2018)对1966—2006年正式出版的《中国震例》和2007年云南省震例总结报告中云南的定点形变异常进行统计和研究,发现这31年中,5级及以上地震前的83项定点形变异常中98%... 1研究背景。倾斜应变测量是地震预测预报研究的重要手段。李智蓉等(2018)对1966—2006年正式出版的《中国震例》和2007年云南省震例总结报告中云南的定点形变异常进行统计和研究,发现这31年中,5级及以上地震前的83项定点形变异常中98%为倾斜类异常,云南倾斜仪数量较多且观测资料质量连续性较好。地倾斜观测对于云南地区5级以上地震预测预报具有重要意义。 展开更多
关键词 破年变 载荷模型 定量计算
下载PDF
电力碳排放计算 被引量:2
12
作者 陈永江 《建筑电气》 2023年第1期9-12,共4页
阐述建筑碳排放计算方法。通过电力能耗计算方法的分析,对电力碳排放计算具体方法进行梳理。
关键词 建筑碳排放 碳排放因子 电力负荷曲线 电力能耗 电力碳排放 年运行时间 每天工作小时数 节能
下载PDF
基于两阶段模型的风光互补系统储能容量配置优化方法 被引量:4
13
作者 李伟 刘立 +1 位作者 王豪琦 何思敏 《水电与新能源》 2023年第1期74-78,共5页
为提高风光互补系统供电经济性,根据风光互补系统的运行特点,第一阶段以风光互补系统技术特性为约束,计算负荷缺电率和新能源弃用率,并将其作为第二阶段的边界条件。第二阶段以储能初始投资年均成本最小作为目标函数计算风光互补系统的... 为提高风光互补系统供电经济性,根据风光互补系统的运行特点,第一阶段以风光互补系统技术特性为约束,计算负荷缺电率和新能源弃用率,并将其作为第二阶段的边界条件。第二阶段以储能初始投资年均成本最小作为目标函数计算风光互补系统的最优储能容量配置。结果表明,合理配置储能容量可以有效减少系统的投资成本。 展开更多
关键词 风光互补系统 两阶段模型 储能容量 负荷缺电率 新能源弃用率 年均费用成本
下载PDF
基于短期相关性和负荷增长的中长期负荷预测 被引量:28
14
作者 钱卫华 姚建刚 +1 位作者 龙立波 张凯 《电力系统自动化》 EI CSCD 北大核心 2007年第11期59-64,共6页
现有中长期负荷预测非线性模型存在预测困难及精度偏低且不稳定的问题。文中提出了一种基于短期相关性和年度负荷增长的预测方法,将非线性问题转化为线性问题来解决。该方法首先根据上一年相邻点和相邻周负荷之间的短期相关性构建线性... 现有中长期负荷预测非线性模型存在预测困难及精度偏低且不稳定的问题。文中提出了一种基于短期相关性和年度负荷增长的预测方法,将非线性问题转化为线性问题来解决。该方法首先根据上一年相邻点和相邻周负荷之间的短期相关性构建线性回归模型;然后采用递归的方法计算出下一年各周所有负荷点的预测值;最后考虑年度负荷增长,对预测值进行修正得到最终预测结果。结合实际电网数据验证了该方法的有效性和实用性,为中长期负荷预测提供了一条可行的新思路。 展开更多
关键词 中长期负荷预测 短期相关性 回归模型 递归 年度负荷增长
下载PDF
数据挖掘和动态神经网络在负荷预测中的研究与应用 被引量:4
15
作者 李晓峰 黄国兴 +1 位作者 高巍巍 丁树春 《计算机科学》 CSCD 北大核心 2014年第4期219-222,共4页
中长期负荷变化规律与社会经济指标的关系很难用一个准确的数学模型来表达。将数据挖掘技术应用到全社会用电量增长的关联分析中,从2000年以来的社会经济指标中选取多项组成相关因素数据库,对缺失数据进行了补全,使用聚类分析挖掘出与... 中长期负荷变化规律与社会经济指标的关系很难用一个准确的数学模型来表达。将数据挖掘技术应用到全社会用电量增长的关联分析中,从2000年以来的社会经济指标中选取多项组成相关因素数据库,对缺失数据进行了补全,使用聚类分析挖掘出与全社会用电量关系密切的若干指标,并对指标中的失真数据进行修正,构建了更加科学的负荷预测模型。通过时间序列的动态神经网络,对负荷预测模型进行了测试和验证,结果表明该预测模型具有很好的收敛性,效果令人满意。 展开更多
关键词 年度负荷预测 数据挖掘 数据补全 数据修正 NARX神经网络
下载PDF
长江重庆九龙坡河段泥沙淤积规律初步分析 被引量:9
16
作者 陈稚聪 刘洪春 黑鹏飞 《泥沙研究》 CSCD 北大核心 2009年第4期7-11,共5页
根据原型实测水文资料和实体模型实测资料,对影响长江重庆九龙坡河段泥沙淤积的主要因素进行分析,得出了泥沙淤积量与年输沙量、年径流量、泥沙粒径和嘉陵江入汇汇流比之间的定量关系。在此基础上建立了综合反映各因素定量关系的计算公式。
关键词 长江九龙坡河段 汛期淤积量 年输沙量 年径流量 汇流比
下载PDF
松花江干流输沙量变化特征分析 被引量:10
17
作者 王双银 谢萍萍 +1 位作者 穆兴民 高鹏 《泥沙研究》 CSCD 北大核心 2011年第4期67-72,共6页
采用线性回归分析、游程检验、Kendall秩次相关检验和Spearman秩次相关检验4种趋势分析方法以及有序聚类法和Lee-Highinan法2种跳跃分析方法对松花江干流江桥、哈尔滨和佳木斯站1955-2006年的年输沙量进行了分析。结果表明:三站分别在1... 采用线性回归分析、游程检验、Kendall秩次相关检验和Spearman秩次相关检验4种趋势分析方法以及有序聚类法和Lee-Highinan法2种跳跃分析方法对松花江干流江桥、哈尔滨和佳木斯站1955-2006年的年输沙量进行了分析。结果表明:三站分别在1992年1、991年和1982年出现变异;江桥站和佳木斯站具有不显著的上升趋势,且是由于变异引起,而哈尔滨站呈现非常显著的下降趋势。经过对年径流量与年输沙量的关系分析,其相关性较强,说明该流域的年输沙量主要受径流量的影响,且有比较一致的变化趋势,但两者的变异点不同步。 展开更多
关键词 松花江干流 趋势检验 跳跃分析 年输沙量
下载PDF
长江干流河道水沙特性与变化趋势初步分析 被引量:28
18
作者 董耀华 惠晓晓 蔺秋生 《长江科学院院报》 CSCD 北大核心 2008年第2期16-20,共5页
建立了河道水沙量、水沙影响因子与水沙关系之间的联系,归纳了年径流量与输沙量的4类分析方法:频率统计法、适配线拟合法、相关分析法和累积曲线法。以长江干流河道控制水文站寸滩、宜昌、监利、汉口和大通19502005年实测数据为基础,初... 建立了河道水沙量、水沙影响因子与水沙关系之间的联系,归纳了年径流量与输沙量的4类分析方法:频率统计法、适配线拟合法、相关分析法和累积曲线法。以长江干流河道控制水文站寸滩、宜昌、监利、汉口和大通19502005年实测数据为基础,初步分析了长江干流河道水沙特性与变化趋势。分析表明:①长江干流河道水量沿程增加、沙量沿程变化不大,沙量变化比水量变化约大10倍,水沙关系沿程减弱;②1950 2005年间,长江干流河道年径流量基本保持不变,年输沙量呈减小趋势,年均减小约1%,1990年后呈明显减小趋势,2000年后呈加速减小趋势;③上游来水来沙变化是控制葛洲坝工程和三峡工程(135 m水位运用期)坝下游水沙变化及河道冲刷的主要因素,其影响大于工程的调水调沙作用。 展开更多
关键词 年径流量 年输沙量 水沙关系 长江干流河道
下载PDF
基于建筑负荷特性的地埋管地源热泵系统适用性研究 被引量:9
19
作者 钱程 徐伟 +2 位作者 朱清宇 杨灵艳 沈亮 《暖通空调》 北大核心 2016年第3期94-97,共4页
基于建筑负荷对地埋管地源热泵系统运行性能的影响给出了2个建筑负荷特性指标:建筑全年累计冷热负荷比R和建筑峰值冷热负荷比K。针对寒冷气候区的典型办公建筑,计算了5种R值和2种K值条件下地埋管地源热泵系统的地埋管进出口温度、土壤... 基于建筑负荷对地埋管地源热泵系统运行性能的影响给出了2个建筑负荷特性指标:建筑全年累计冷热负荷比R和建筑峰值冷热负荷比K。针对寒冷气候区的典型办公建筑,计算了5种R值和2种K值条件下地埋管地源热泵系统的地埋管进出口温度、土壤温度及热泵性能系数,得出了适用于地埋管地源热泵系统的R值范围为0.6-0.8,同时给出了不同K值条件下地埋管换热器的设计依据。 展开更多
关键词 地源热泵 建筑负荷特性 全年累计冷热负荷比 峰值冷热负荷比 地埋管进 出口温度 土壤温度 性能系数
下载PDF
电力系统年最大负荷概率预测 被引量:4
20
作者 卫志农 滕俊 +4 位作者 王丹 唐智育 何南强 孟远景 程鹏 《电力系统及其自动化学报》 CSCD 2004年第6期64-67,共4页
概率预测已经在气象、地震预测等领域中成功应用。提出将概率预测的方法用于负荷预测领域。在深入研究年最大负荷与温度关系的基础上建立了概率预测模型 ,模型有较高的预测精度 ,并已形成实用化应用软件 ,软件已在河南省正式使用 ,使用... 概率预测已经在气象、地震预测等领域中成功应用。提出将概率预测的方法用于负荷预测领域。在深入研究年最大负荷与温度关系的基础上建立了概率预测模型 ,模型有较高的预测精度 ,并已形成实用化应用软件 ,软件已在河南省正式使用 ,使用效果好。 展开更多
关键词 年最大负荷 概率预测 灰色预测 气候因素
下载PDF
上一页 1 2 9 下一页 到第
使用帮助 返回顶部