With the development of China's economy,the implementation scale and scope of hydraulic engineering projects are increasing,and the application of anti-seepage technology has an important influence on the construc...With the development of China's economy,the implementation scale and scope of hydraulic engineering projects are increasing,and the application of anti-seepage technology has an important influence on the construction quality of hydraulic engineering.In this paper,the significance and problems of the application of anti-seepage technology in the construction of hydraulic engineering projects were mainly analyzed,and specific application strategies were proposed.展开更多
In the construction of municipal road drainage projects,pipe jacking construction is a relatively common construction method.This construction technology can avoid a large amount of excavation work,improve drainage co...In the construction of municipal road drainage projects,pipe jacking construction is a relatively common construction method.This construction technology can avoid a large amount of excavation work,improve drainage construction efficiency,avoid large-scale damage to the road surface,and exert small traffic impact.Therefore,it is currently widely used in drainage construction,but judging from the current actual application situation,there are still many problems that require further improvement.This article mainly analyzes the advantages of and current technical problems in pipe jacking construction technology in detail,explores corresponding solutions,and lays a foundation for the optimization of municipal road drainage engineering construction.展开更多
The water infiltration problem of water conservancy projects is one of the more common problems in the construction of water conservancy projects,which seriously affects the overall construction quality and safety of ...The water infiltration problem of water conservancy projects is one of the more common problems in the construction of water conservancy projects,which seriously affects the overall construction quality and safety of water conservancy projects.This article studies the causes of water infiltration in water conservancy projects and introduces related antiseepage technologies,hoping to be a reference for the implementation of anti-seepage projects.Through research,it is found that the factors that cause water infiltration in water conservancy projects include water conservancy project structural changes,environmental factors and construction factors.Relevant personnel can use concrete anti-seepage wall construction technology and high-pressure jet grouting technology to do the relevant anti-seepage work of water conservancy projects.展开更多
In order to ensure the sustainable growth of rural economy,it is necessary to carry out further research on small-scale water conservancy projects and solve the seepage issue in rural areas.Based on the application si...In order to ensure the sustainable growth of rural economy,it is necessary to carry out further research on small-scale water conservancy projects and solve the seepage issue in rural areas.Based on the application significance of small-scale rural water conservancy projects and the analysis of anti-seepage technologies,along with specific examples,this paper specifically discusses the application of high-pressure jet technology,so as to provide reference for the development of engineering construction.展开更多
Accumulation of sediment and silt in the drainage canals is undesirable, yet inevitable occurrence in the course of the use and operation of any drainage canal network. In this study, D-25 drainage canal group, taking...Accumulation of sediment and silt in the drainage canals is undesirable, yet inevitable occurrence in the course of the use and operation of any drainage canal network. In this study, D-25 drainage canal group, taking place in the Nazilli irrigation system with an area of 1165 ha is the only system where all planned activities have been completed. It has been determined that the drainage system was constructed according to original drainage project. The depth of accumulated sediment in the drainage canals in the research area was determined from the difference between the measured elevation and the elevation given in the design projects. The reasons for siltation in the D-25 drainage canal group have been studied by looking at the results of the elevation measurements made in 2010-2012. The measurements made in D-25 drainage canal group showed that there were significant differences between the actual structure (bridge, culvert, and conduit) bottom elevations and the elevations given in the design projects. In addition, the length of some canals would not coincide with the design project either. 83.3% (93.3% in length) of the canals had differences in structure bottom elevations. Of the total 55 structures 45 (81.8%) had a 0.10 m or more difference in bottom elevation from the project. Of the erroneous structures 73.3% had an average of 0.40 m, and 26.7% had an average of -0.25 m difference in bottom elevations from the design projects.展开更多
This paper introduced the construction of the pumped-storage power station (PSPS). In the excava- tion of underground power house, the principle of excavation in thin layer and support in time with real time monitor...This paper introduced the construction of the pumped-storage power station (PSPS). In the excava- tion of underground power house, the principle of excavation in thin layer and support in time with real time monitoring are adopted. The excavation blasting parameters are adjusted timely. Through these, the excavation quality can be guaranteed, the surrounding rock can be prevented from being damaged and the deformation of power house side wall can be controlled. Five security defense lines have been adopted to solve anti-seepage and drainage in the major underground projects.展开更多
文摘With the development of China's economy,the implementation scale and scope of hydraulic engineering projects are increasing,and the application of anti-seepage technology has an important influence on the construction quality of hydraulic engineering.In this paper,the significance and problems of the application of anti-seepage technology in the construction of hydraulic engineering projects were mainly analyzed,and specific application strategies were proposed.
文摘In the construction of municipal road drainage projects,pipe jacking construction is a relatively common construction method.This construction technology can avoid a large amount of excavation work,improve drainage construction efficiency,avoid large-scale damage to the road surface,and exert small traffic impact.Therefore,it is currently widely used in drainage construction,but judging from the current actual application situation,there are still many problems that require further improvement.This article mainly analyzes the advantages of and current technical problems in pipe jacking construction technology in detail,explores corresponding solutions,and lays a foundation for the optimization of municipal road drainage engineering construction.
文摘The water infiltration problem of water conservancy projects is one of the more common problems in the construction of water conservancy projects,which seriously affects the overall construction quality and safety of water conservancy projects.This article studies the causes of water infiltration in water conservancy projects and introduces related antiseepage technologies,hoping to be a reference for the implementation of anti-seepage projects.Through research,it is found that the factors that cause water infiltration in water conservancy projects include water conservancy project structural changes,environmental factors and construction factors.Relevant personnel can use concrete anti-seepage wall construction technology and high-pressure jet grouting technology to do the relevant anti-seepage work of water conservancy projects.
文摘In order to ensure the sustainable growth of rural economy,it is necessary to carry out further research on small-scale water conservancy projects and solve the seepage issue in rural areas.Based on the application significance of small-scale rural water conservancy projects and the analysis of anti-seepage technologies,along with specific examples,this paper specifically discusses the application of high-pressure jet technology,so as to provide reference for the development of engineering construction.
文摘Accumulation of sediment and silt in the drainage canals is undesirable, yet inevitable occurrence in the course of the use and operation of any drainage canal network. In this study, D-25 drainage canal group, taking place in the Nazilli irrigation system with an area of 1165 ha is the only system where all planned activities have been completed. It has been determined that the drainage system was constructed according to original drainage project. The depth of accumulated sediment in the drainage canals in the research area was determined from the difference between the measured elevation and the elevation given in the design projects. The reasons for siltation in the D-25 drainage canal group have been studied by looking at the results of the elevation measurements made in 2010-2012. The measurements made in D-25 drainage canal group showed that there were significant differences between the actual structure (bridge, culvert, and conduit) bottom elevations and the elevations given in the design projects. In addition, the length of some canals would not coincide with the design project either. 83.3% (93.3% in length) of the canals had differences in structure bottom elevations. Of the total 55 structures 45 (81.8%) had a 0.10 m or more difference in bottom elevation from the project. Of the erroneous structures 73.3% had an average of 0.40 m, and 26.7% had an average of -0.25 m difference in bottom elevations from the design projects.
文摘This paper introduced the construction of the pumped-storage power station (PSPS). In the excava- tion of underground power house, the principle of excavation in thin layer and support in time with real time monitoring are adopted. The excavation blasting parameters are adjusted timely. Through these, the excavation quality can be guaranteed, the surrounding rock can be prevented from being damaged and the deformation of power house side wall can be controlled. Five security defense lines have been adopted to solve anti-seepage and drainage in the major underground projects.