Shapai Roller Compacted Concrete(RCC) Arch Dam is the highest RCC arch dam of the 20th century in the world with a maximum height of 132m,and it is the only concrete arch dam near the epicentre of Wenchuan earthquake ...Shapai Roller Compacted Concrete(RCC) Arch Dam is the highest RCC arch dam of the 20th century in the world with a maximum height of 132m,and it is the only concrete arch dam near the epicentre of Wenchuan earthquake on May 12th,2008.The seismic damage to the dam and the resistance of the dam has drawn great attention.This paper analyzed the response and resistance of the dam to the seismic wave using numerical simulations with comparison to the monitored data.The field investigation after the earthquake and analysis of insitu data record showed that there was only little variation in the opening size at the dam and foundation interface,transverse joints and inducing joints before and after the earthquake.The overall stability of the dam abutment resistance body was quite good except a little relaxation was observed.The results of the dynamic finite element method(FEM) showed that the sizes of the openings obtained from the numerical modeling are comparable with the monitored values,and the change of the opening size is in millimeter range.This study revealed that Shapai arch dam exhibited high seismic resistance and overload capacity in the Wenchuan earthquake event.The comparison of the monitored and simulated results showed that the numerical method applied in this paper well simulated the seismic response of the dam.The method could be useful in the future application on the safety evaluation of RCC dams.展开更多
Based on the general displacement method and the basic hypothesis of the trial load method, a new advanced trial load method, the general displacement arch-cantilever element method, was proposed to derive the transfo...Based on the general displacement method and the basic hypothesis of the trial load method, a new advanced trial load method, the general displacement arch-cantilever element method, was proposed to derive the transformation relation of displacements and loads between the surface nodes and middle plane nodes. This method considers the nodes on upstream and downstream surfaces of the arch dam to be exit nodes (master nodes), and the middle plane nodes to be slave nodes. According to the derived displacement and load transformation matrices, the equilibrium equation treating the displacement of middle plane nodes as a basic unknown variable is transformed into one that treats the displacement of upstream and downstream nodes as a basic unknown variable. Because the surface nodes have only three degrees of freedom (DOF), this method can be directly coupled with the finite element method (FEM), which is used for foundation simulation to analyze the stress of the arch dam with consideration of dam-foundation interaction. Moreover, using the FEM, the nodal load of the arch dam can be easily obtained. Case studies of a typical cylindrical arch dam and the Wudongde arch dam demonstrate the robustness and feasibility of the proposed method.展开更多
This paper proposes a new, simple and efficient method for nonlinear simulation of arch dam cracking from the construction period to the operation period, which takes into account the arch dam construction process and...This paper proposes a new, simple and efficient method for nonlinear simulation of arch dam cracking from the construction period to the operation period, which takes into account the arch dam construction process and temperature loads. In the calculation mesh, the contact surface of pair nodes is located at places on the arch dam where cracking is possible. A new effective iterative method, the mixed finite element method for friction-contact problems, is improved and used for nonlinear simulation of the cracking process. The forces acting on the structure are divided into two parts: external forces and contact forces. The displacement of the structure is chosen as the basic variable and the nodal contact force in the possible contact region of the local coordinate system is chosen as the iterative variable, so that the nonlinear iterative process is only limited within the possible contact surface and is much more economical. This method was used to simulate the cracking process of the Shuanghe Arch Dam in Southwest China. In order to prove the validity and accuracy of this method and to study the effect of thermal stress on arch dam cracking, three schemes were designed for calculation. Numerical results agree with actual measured data, proving that it is feasible to use this method to simulate the entire process of nonlinear arch dam cracking.展开更多
基金supported by The National Natural Science Foundation of China(Grant No. 51079092)Specialized Research Fund for the Doctoral Program of Higher Education(Grant no.20090181120088)Science and Technology Support Plan Project of Sichuan Province (Grant No. 2008SZ0163)
文摘Shapai Roller Compacted Concrete(RCC) Arch Dam is the highest RCC arch dam of the 20th century in the world with a maximum height of 132m,and it is the only concrete arch dam near the epicentre of Wenchuan earthquake on May 12th,2008.The seismic damage to the dam and the resistance of the dam has drawn great attention.This paper analyzed the response and resistance of the dam to the seismic wave using numerical simulations with comparison to the monitored data.The field investigation after the earthquake and analysis of insitu data record showed that there was only little variation in the opening size at the dam and foundation interface,transverse joints and inducing joints before and after the earthquake.The overall stability of the dam abutment resistance body was quite good except a little relaxation was observed.The results of the dynamic finite element method(FEM) showed that the sizes of the openings obtained from the numerical modeling are comparable with the monitored values,and the change of the opening size is in millimeter range.This study revealed that Shapai arch dam exhibited high seismic resistance and overload capacity in the Wenchuan earthquake event.The comparison of the monitored and simulated results showed that the numerical method applied in this paper well simulated the seismic response of the dam.The method could be useful in the future application on the safety evaluation of RCC dams.
基金supported by the National Natural Science Foundation of China (Grant No. 90510017)
文摘Based on the general displacement method and the basic hypothesis of the trial load method, a new advanced trial load method, the general displacement arch-cantilever element method, was proposed to derive the transformation relation of displacements and loads between the surface nodes and middle plane nodes. This method considers the nodes on upstream and downstream surfaces of the arch dam to be exit nodes (master nodes), and the middle plane nodes to be slave nodes. According to the derived displacement and load transformation matrices, the equilibrium equation treating the displacement of middle plane nodes as a basic unknown variable is transformed into one that treats the displacement of upstream and downstream nodes as a basic unknown variable. Because the surface nodes have only three degrees of freedom (DOF), this method can be directly coupled with the finite element method (FEM), which is used for foundation simulation to analyze the stress of the arch dam with consideration of dam-foundation interaction. Moreover, using the FEM, the nodal load of the arch dam can be easily obtained. Case studies of a typical cylindrical arch dam and the Wudongde arch dam demonstrate the robustness and feasibility of the proposed method.
基金supported by the National Nature Science Foundation of China (Grant No 90510017)
文摘This paper proposes a new, simple and efficient method for nonlinear simulation of arch dam cracking from the construction period to the operation period, which takes into account the arch dam construction process and temperature loads. In the calculation mesh, the contact surface of pair nodes is located at places on the arch dam where cracking is possible. A new effective iterative method, the mixed finite element method for friction-contact problems, is improved and used for nonlinear simulation of the cracking process. The forces acting on the structure are divided into two parts: external forces and contact forces. The displacement of the structure is chosen as the basic variable and the nodal contact force in the possible contact region of the local coordinate system is chosen as the iterative variable, so that the nonlinear iterative process is only limited within the possible contact surface and is much more economical. This method was used to simulate the cracking process of the Shuanghe Arch Dam in Southwest China. In order to prove the validity and accuracy of this method and to study the effect of thermal stress on arch dam cracking, three schemes were designed for calculation. Numerical results agree with actual measured data, proving that it is feasible to use this method to simulate the entire process of nonlinear arch dam cracking.