期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Engineering Strategies on Flood Control in Middle Reach of Yangtze River, China
1
作者 Li Chang’an Yin Hongfu Zhang Yufen Gu Yansheng Faculty of Earth Sciences, China University of Geosciences, Wuhan 430074, China 《Journal of Earth Science》 SCIE CAS CSCD 2000年第3期99-102,共4页
Flood disaster has been a serious hidden danger since the ancient time. The essential cause for the fact that floods have not been eliminated for hundreds of years is that time honored strategies do not suit the case... Flood disaster has been a serious hidden danger since the ancient time. The essential cause for the fact that floods have not been eliminated for hundreds of years is that time honored strategies do not suit the cases of flood prevention. In the view of geological environmental analyses of flood formation and from the synthesis of experiences gained in flood control in the past hundreds of years, sluggish draining of flood, silt sedimentation in channel and building levee blindly constitute the main cause of intractable flood for a long time in the middle reach of the Yangtze River. Draining away silt and water is the only way to stamping out flood disaster. Opening up artificial waterways for flood diversion, draining away the silt of channel into the polders, and storing the flood water are important engineering measures for the flood control and damage reduction. 展开更多
关键词 the middle reach of Yangtze River flood disaster opening artificial waterways for flood diversion draining away the silt of channel into the embarked lowlands storing flood water.
下载PDF
RESERVOIR SEDIMENTATION AND TRANSFORMATION OF MORPHO-LOGY IN THE LOWER YELLOW RIVER DURING 10 YEAR'S INITIAL OPERATION OF THE XIAOLANGDI RESERVOIR 被引量:3
2
作者 CHEN Jian-guo ZHOU Wen-hao CHEN Qiang 《Journal of Hydrodynamics》 SCIE EI CSCD 2012年第6期914-924,共11页
The Xiaolangdi Hydro-Project is one of the large projects on the main stem of the Middle Yellow River. It has been operated for more than 10 years, since its impoundment in October, 1999. The reservoir has trapped 2.8... The Xiaolangdi Hydro-Project is one of the large projects on the main stem of the Middle Yellow River. It has been operated for more than 10 years, since its impoundment in October, 1999. The reservoir has trapped 2.833 × 10^9 m3 of sediment, and caused the total erosion of 1.891 × 10^9t in the Lower Yellow River from October, 1999 through October, 2010. Not only the serious atrophied situation of the Lower Yellow River (LYR) has been resuscitating, but also many new phenomena of sediment transport and behaviors of channel re-establishing are coming into being. They are illustrated and discussed in detail in this paper. 展开更多
关键词 reservoir sedimentation density current water-sediment regulation artificial flood channel siltation and erosion erosion efficiency river configuration
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部