The microgrid is a typical cyber-physical microgrid system(CPMS). The physical unconventional distributed generators(DGs) are intermittent and inverter-interfaced which makes them very different to control. The cyber ...The microgrid is a typical cyber-physical microgrid system(CPMS). The physical unconventional distributed generators(DGs) are intermittent and inverter-interfaced which makes them very different to control. The cyber components,such as the embedded computer and communication network,are equipped with DGs, to process and transmit the necessary information for the controllers. In order to ensure system-wide observability, controllability and stabilization for the microgrid,the cyber and physical component need to be integrated. For the physical component of CPMS, the droop-control method is popular as it can be applied in both modes of operation to improve the grid transient performance. Traditional droop control methods have the drawback of the inherent trade-off between power sharing and voltage and frequency regulation. In this paper, the global information(such as the average voltage and the output active power of the microgrid and so on) are acquired distributedly based on multi-agent system(MAS). Based on the global information from cyber components of CPMS, automatic generation control(AGC) and automatic voltage control(AVC)are proposed to deal with the drawback of traditional droop control. Simulation studies in PSCAD demonstrate the effectiveness of the proposed control methods.展开更多
Essentially, it is significant to supply the consumer with reliable and sufficient power. Since, power quality is measured by the consistency in frequency and power flow between control areas. Thus, in a power system ...Essentially, it is significant to supply the consumer with reliable and sufficient power. Since, power quality is measured by the consistency in frequency and power flow between control areas. Thus, in a power system operation and control,automatic generation control(AGC) plays a crucial role. In this paper, multi-area(Five areas: area 1, area 2, area 3, area 4 and area 5) reheat thermal power systems are considered with proportional-integral-derivative(PID) controller as a supplementary controller. Each area in the investigated power system is equipped with appropriate governor unit, turbine with reheater unit, generator and speed regulator unit. The PID controller parameters are optimized by considering nature bio-inspired firefly algorithm(FFA). The experimental results demonstrated the comparison of the proposed system performance(FFA-PID)with optimized PID controller based genetic algorithm(GAPID) and particle swarm optimization(PSO) technique(PSOPID) for the same investigated power system. The results proved the efficiency of employing the integral time absolute error(ITAE) cost function with one percent step load perturbation(1 % SLP) in area 1. The proposed system based FFA achieved the least settling time compared to using the GA or the PSO algorithms, while, it attained good results with respect to the peak overshoot/undershoot. In addition, the FFA performance is improved with the increased number of iterations which outperformed the other optimization algorithms based controller.展开更多
Present day power scenarios demand a high quality uninterrupted power supply and needs environmental issues to be addressed. Both concerns can be dealt with by the introduction of the renewable sources to the existing...Present day power scenarios demand a high quality uninterrupted power supply and needs environmental issues to be addressed. Both concerns can be dealt with by the introduction of the renewable sources to the existing power system. Thus, automatic generation control(AGC) with diverse renewable sources and a modified-cascaded controller are presented in the paper.Also, a new hybrid scheme of the improved teaching learning based optimization-differential evolution(hITLBO-DE) algorithm is applied for providing optimization of controller parameters. A study of the system with a technique such as TLBO applied to a proportional integral derivative(PID), integral double derivative(IDD) and PIDD is compared to hITLBO-DE tuned cascaded controller with dynamic load change.The suggested methodology has been extensively applied to a 2-area system with a diverse source power system with various operation time non-linearities such as dead-band of, generation rate constraint and reheat thermal units. The multi-area system with reheat thermal plants, hydel plants and a unit of a wind-diesel combination is tested with the cascaded controller scheme with a different controller setting for each area. The variation of the load is taken within 1% to 5% of the connected load and robustness analysis is shown by modifying essential factors simultaneously by± 30%. Finally, the proposed scheme of controller and optimization technique is also tested with a 5-equal area thermal system with non-linearities. The simulation results demonstrate the superiority of the proposed controller and algorithm under a dynamically changing load.展开更多
The increasing penetration of renewable energy into power grids is reducing the regulation capacity of automatic generation control(AGC).Thus,there is an urgent demand to coordinate AGC units with active equipment suc...The increasing penetration of renewable energy into power grids is reducing the regulation capacity of automatic generation control(AGC).Thus,there is an urgent demand to coordinate AGC units with active equipment such as energy storage.Current dispatch decision-making methods often ignore the intermittent effects of renewable energy.This paper proposes a two-stage robust optimization model in which energy storage is used to compensate for the intermittency of renewable energy for the dispatch of AGC units.This model exploits the rapid adjustment capability of energy storage to compensate for the slow response speed of AGC units,improve the adjustment potential,and respond to the problems of intermittent power generation from renewable energy.A column and constraint generation algorithm is used to solve the model.In an example analysis,the proposed model was more robust than a model that did not consider energy storage at eliminating the effects of intermittency while offering clear improvements in economy and efficiency.展开更多
Load frequency Control (LFC) is used for many years as part of Automatic Generation Control (AGC) in power system around the world. In a mixed power system, it is usual to find an area regulated by hydro generation in...Load frequency Control (LFC) is used for many years as part of Automatic Generation Control (AGC) in power system around the world. In a mixed power system, it is usual to find an area regulated by hydro generation interconnected to another area regulated by thermal generation or in combination of both. In the following study, performance of AGC for Thermal, Hydro and Thermal turbine based power system is examined, including how frequency bias setting influences AGC response and inadvertent interchange. Control performance analysis of three area interconnected systems is simulated and studied through Matlab Simulink software. Integral square error and Integral time absolute error has been used as performance criterion. It is shown that integral time absolute error (ITAE) as performance index leads to faster optimization of controller gain.展开更多
The performance of Smith prediction monitoring automatic gauge control(AGC) system is influenced by model mismatching greatly in strip rolling process. Aiming at this problem, a feedback-assisted iterative learning co...The performance of Smith prediction monitoring automatic gauge control(AGC) system is influenced by model mismatching greatly in strip rolling process. Aiming at this problem, a feedback-assisted iterative learning control strategy, which learned unknown modeling error by using previous control information repeatedly, was introduced into Smith prediction monitoring AGC system. Firstly, conventional Smith predictor and improved Smith predictor with PI-P controller were analyzed. Secondly, on the basis of establishing of feedback-assisted iterative learning control strategy for improved Smith predictor, process control signal update law and control error were deduced, then convergence condition of this strategy was put forward and proved. Finally, after modeling the automatic position control system, the PI-P Smith prediction monitoring AGC system with feedback-assisted iterative learning control was researched through simulation. Simulation results indicate that this system remains stable during model mismatching. The robustness and response of monitoring AGC is improved by development of feedback-assisted iterative learning control strategy for PI-P Smith predictor.展开更多
This paper presented an automatic gain control(AGC) circuit suitable for FM/cw ladar. The proposed architecture was based on two-stage variable gain amplifier(VGA) chain with a novel DC offset canceller circuit, which...This paper presented an automatic gain control(AGC) circuit suitable for FM/cw ladar. The proposed architecture was based on two-stage variable gain amplifier(VGA) chain with a novel DC offset canceller circuit, which contained an improved Gilbert cell and a Gm-C feedback loop. To keep the VGA with a linearity in dB characteristic, an improved exponential gain control circuit was introduced. The AGC was implemented in 0.18 μm standard CMOS process. Simulation and measurement results verified that its gain ranged from-20 dB to 30 dB, and bandwidth ranged from 100 kHz to 10 MHz. Its power consumption was 19.8 mW under a voltage supply of 3.3 V.展开更多
Since wind power has the features of being intermittent and unpredictable, and usually needs transmission over long distances, grid integration of large-scale wind power will exert signif icant influence on power grid...Since wind power has the features of being intermittent and unpredictable, and usually needs transmission over long distances, grid integration of large-scale wind power will exert signif icant influence on power grid planning and construction, and will make a heavy impact on the safe and reliable operation of power systems. To deal with the diff iculties of large scale wind power dispatch, this paper presents a new automatic generation control (AGC) scheme that involves the participation of wind farms. The scheme is based on ultra-short-term wind power forecast. The author establishes a generation output distribution optimization mode for the power system with wind farms and verif ies the feasibility of the scheme by an example.展开更多
基金supported by National Natural Science Foundation of China(61100159,61233007,61503371)National High Technology Research and Development Program of China(863 Program)(2011AA040103)+2 种基金Foundation of Chinese Academy of Sciences(KGCX2-EW-104)the Strategic Priority Research Program of the Chinese Academy of Sciences(XDA06021100)the Cross-disciplinary Collaborative Teams Program for Science,Technology,and Innovation of Chinese Academy of Sciences-Network and System Technologies for Security Monitoring and Information Interaction in Smart Grid,Energy Management System for Micro-smart Grid
文摘The microgrid is a typical cyber-physical microgrid system(CPMS). The physical unconventional distributed generators(DGs) are intermittent and inverter-interfaced which makes them very different to control. The cyber components,such as the embedded computer and communication network,are equipped with DGs, to process and transmit the necessary information for the controllers. In order to ensure system-wide observability, controllability and stabilization for the microgrid,the cyber and physical component need to be integrated. For the physical component of CPMS, the droop-control method is popular as it can be applied in both modes of operation to improve the grid transient performance. Traditional droop control methods have the drawback of the inherent trade-off between power sharing and voltage and frequency regulation. In this paper, the global information(such as the average voltage and the output active power of the microgrid and so on) are acquired distributedly based on multi-agent system(MAS). Based on the global information from cyber components of CPMS, automatic generation control(AGC) and automatic voltage control(AVC)are proposed to deal with the drawback of traditional droop control. Simulation studies in PSCAD demonstrate the effectiveness of the proposed control methods.
文摘Essentially, it is significant to supply the consumer with reliable and sufficient power. Since, power quality is measured by the consistency in frequency and power flow between control areas. Thus, in a power system operation and control,automatic generation control(AGC) plays a crucial role. In this paper, multi-area(Five areas: area 1, area 2, area 3, area 4 and area 5) reheat thermal power systems are considered with proportional-integral-derivative(PID) controller as a supplementary controller. Each area in the investigated power system is equipped with appropriate governor unit, turbine with reheater unit, generator and speed regulator unit. The PID controller parameters are optimized by considering nature bio-inspired firefly algorithm(FFA). The experimental results demonstrated the comparison of the proposed system performance(FFA-PID)with optimized PID controller based genetic algorithm(GAPID) and particle swarm optimization(PSO) technique(PSOPID) for the same investigated power system. The results proved the efficiency of employing the integral time absolute error(ITAE) cost function with one percent step load perturbation(1 % SLP) in area 1. The proposed system based FFA achieved the least settling time compared to using the GA or the PSO algorithms, while, it attained good results with respect to the peak overshoot/undershoot. In addition, the FFA performance is improved with the increased number of iterations which outperformed the other optimization algorithms based controller.
文摘Present day power scenarios demand a high quality uninterrupted power supply and needs environmental issues to be addressed. Both concerns can be dealt with by the introduction of the renewable sources to the existing power system. Thus, automatic generation control(AGC) with diverse renewable sources and a modified-cascaded controller are presented in the paper.Also, a new hybrid scheme of the improved teaching learning based optimization-differential evolution(hITLBO-DE) algorithm is applied for providing optimization of controller parameters. A study of the system with a technique such as TLBO applied to a proportional integral derivative(PID), integral double derivative(IDD) and PIDD is compared to hITLBO-DE tuned cascaded controller with dynamic load change.The suggested methodology has been extensively applied to a 2-area system with a diverse source power system with various operation time non-linearities such as dead-band of, generation rate constraint and reheat thermal units. The multi-area system with reheat thermal plants, hydel plants and a unit of a wind-diesel combination is tested with the cascaded controller scheme with a different controller setting for each area. The variation of the load is taken within 1% to 5% of the connected load and robustness analysis is shown by modifying essential factors simultaneously by± 30%. Finally, the proposed scheme of controller and optimization technique is also tested with a 5-equal area thermal system with non-linearities. The simulation results demonstrate the superiority of the proposed controller and algorithm under a dynamically changing load.
基金supported by Theoretical study of power system synergistic dispatch National Science Foundation of China(51477091).
文摘The increasing penetration of renewable energy into power grids is reducing the regulation capacity of automatic generation control(AGC).Thus,there is an urgent demand to coordinate AGC units with active equipment such as energy storage.Current dispatch decision-making methods often ignore the intermittent effects of renewable energy.This paper proposes a two-stage robust optimization model in which energy storage is used to compensate for the intermittency of renewable energy for the dispatch of AGC units.This model exploits the rapid adjustment capability of energy storage to compensate for the slow response speed of AGC units,improve the adjustment potential,and respond to the problems of intermittent power generation from renewable energy.A column and constraint generation algorithm is used to solve the model.In an example analysis,the proposed model was more robust than a model that did not consider energy storage at eliminating the effects of intermittency while offering clear improvements in economy and efficiency.
文摘Load frequency Control (LFC) is used for many years as part of Automatic Generation Control (AGC) in power system around the world. In a mixed power system, it is usual to find an area regulated by hydro generation interconnected to another area regulated by thermal generation or in combination of both. In the following study, performance of AGC for Thermal, Hydro and Thermal turbine based power system is examined, including how frequency bias setting influences AGC response and inadvertent interchange. Control performance analysis of three area interconnected systems is simulated and studied through Matlab Simulink software. Integral square error and Integral time absolute error has been used as performance criterion. It is shown that integral time absolute error (ITAE) as performance index leads to faster optimization of controller gain.
基金Project(51074051)supported by the National Natural Science Foundation of China
文摘The performance of Smith prediction monitoring automatic gauge control(AGC) system is influenced by model mismatching greatly in strip rolling process. Aiming at this problem, a feedback-assisted iterative learning control strategy, which learned unknown modeling error by using previous control information repeatedly, was introduced into Smith prediction monitoring AGC system. Firstly, conventional Smith predictor and improved Smith predictor with PI-P controller were analyzed. Secondly, on the basis of establishing of feedback-assisted iterative learning control strategy for improved Smith predictor, process control signal update law and control error were deduced, then convergence condition of this strategy was put forward and proved. Finally, after modeling the automatic position control system, the PI-P Smith prediction monitoring AGC system with feedback-assisted iterative learning control was researched through simulation. Simulation results indicate that this system remains stable during model mismatching. The robustness and response of monitoring AGC is improved by development of feedback-assisted iterative learning control strategy for PI-P Smith predictor.
基金Supported by the National Science and Technology Major Project of the Ministry of Science and Technology of China(No.2012ZX03004008)
文摘This paper presented an automatic gain control(AGC) circuit suitable for FM/cw ladar. The proposed architecture was based on two-stage variable gain amplifier(VGA) chain with a novel DC offset canceller circuit, which contained an improved Gilbert cell and a Gm-C feedback loop. To keep the VGA with a linearity in dB characteristic, an improved exponential gain control circuit was introduced. The AGC was implemented in 0.18 μm standard CMOS process. Simulation and measurement results verified that its gain ranged from-20 dB to 30 dB, and bandwidth ranged from 100 kHz to 10 MHz. Its power consumption was 19.8 mW under a voltage supply of 3.3 V.
文摘Since wind power has the features of being intermittent and unpredictable, and usually needs transmission over long distances, grid integration of large-scale wind power will exert signif icant influence on power grid planning and construction, and will make a heavy impact on the safe and reliable operation of power systems. To deal with the diff iculties of large scale wind power dispatch, this paper presents a new automatic generation control (AGC) scheme that involves the participation of wind farms. The scheme is based on ultra-short-term wind power forecast. The author establishes a generation output distribution optimization mode for the power system with wind farms and verif ies the feasibility of the scheme by an example.