This paper puts forward a complex inner product averaging method for calculating normal form of ODE. Compared with conventional averaging method, the theoretic analytical process has such simple forms as to realize co... This paper puts forward a complex inner product averaging method for calculating normal form of ODE. Compared with conventional averaging method, the theoretic analytical process has such simple forms as to realize computer program easily. Results can be applied in both autonomous and non-autonomous systems. At last, an example is resolved to verify the method. 展开更多
关键词 nonlinear dynamic system normal form complex inner product averaging method
下载PDF
Study on Top-Down Estimation Method of Software Project Planning 被引量:3
2
作者 ZHANG Jun-guang Lǖ Ting-jie ZHAO Yu-mei 《The Journal of China Universities of Posts and Telecommunications》 EI CSCD 2006年第2期108-111,共4页
This paper studies a new software project planning method under some actual project data in order to make software project plans more effective. From the perspective of system theory, our new method regards a software... This paper studies a new software project planning method under some actual project data in order to make software project plans more effective. From the perspective of system theory, our new method regards a software project plan as an associative unit for study. During a top-down estimation of a software project, Program Evaluation and Review Technique (PERT) method and analogy method are combined to estimate its size, then effort estimation and specific schedules are obtained according to distributions of the phase effort. This allows a set of practical and feasible planning methods to be constructed. Actual data indicate that this set of methods can lead to effective software project planning. 展开更多
关键词 PLANNING TOP-DOWN average productivity estimation method