There are many problems and deficiencies in traditional bank protection methods,which cause certain damage to the ecological environment of river channels.Recently,the issues of river management,improving bank protect...There are many problems and deficiencies in traditional bank protection methods,which cause certain damage to the ecological environment of river channels.Recently,the issues of river management,improving bank protection technology,formulating reasonable construction measures,and ensuring the smooth and efficient implementation of construction have been receiving increasing attention.展开更多
The groyne has been used widely in bank protection and river regulation. The plane layout and structural style of groyne are closely related to the stability of the groyne itself and the effect of bank protection. In ...The groyne has been used widely in bank protection and river regulation. The plane layout and structural style of groyne are closely related to the stability of the groyne itself and the effect of bank protection. In this paper, based on the preliminary summary of the design of bank protection in the bore surging area of Qiantang River, some problems regarding the structure of groyne are pointed out and an improved plan is put forward. Site experiment was carried out combined with an emergency repair. The results of the experiment indicate that the improved project is reliable and successful.展开更多
文摘There are many problems and deficiencies in traditional bank protection methods,which cause certain damage to the ecological environment of river channels.Recently,the issues of river management,improving bank protection technology,formulating reasonable construction measures,and ensuring the smooth and efficient implementation of construction have been receiving increasing attention.
文摘The groyne has been used widely in bank protection and river regulation. The plane layout and structural style of groyne are closely related to the stability of the groyne itself and the effect of bank protection. In this paper, based on the preliminary summary of the design of bank protection in the bore surging area of Qiantang River, some problems regarding the structure of groyne are pointed out and an improved plan is put forward. Site experiment was carried out combined with an emergency repair. The results of the experiment indicate that the improved project is reliable and successful.