期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
Construction of the“Micro-Ideological and Political”Model for Ideological and Political Teaching Reform in Bidding and Contract Management Courses
1
作者 Dongchun Xia 《Journal of Contemporary Educational Research》 2024年第11期326-332,共7页
In the context of deepening educational reforms,the significance of ideological and political education has become increasingly prominent,emerging as a crucial aspect of enhancing students’comprehensive qualities.To ... In the context of deepening educational reforms,the significance of ideological and political education has become increasingly prominent,emerging as a crucial aspect of enhancing students’comprehensive qualities.To ensure the orderly progress of ideological and political education in courses,it is essential to actively promote the integration of ideological and political elements within coursework.This integration aims to align professional course education with ideological and political education,fostering a collaborative educational model.Therefore,in the teaching of bidding and contract management courses,constructing a“micro-ideological and political”teaching model has emerged as a critical component.The implementation of this model facilitates the seamless integration of bidding and contract management coursework with ideological and political education,thereby elevating the teaching quality of these courses.Additionally,it leverages the synergistic role of coursework and ideology in educating students,ultimately enhancing the quality and level of talent cultivation.Hence,this paper proposes strategies for constructing a“microideological and political”model within the context of ideological and political teaching reforms in bidding and contract management courses,inviting discussion and exchange on this topic. 展开更多
关键词 bidding and contract management courses Ideological and political elements “Micro-ideological and political”model
下载PDF
Analysis of Existing Problems with Management of Construction Projects Bidding and Solutions to the Problems
2
作者 Meili Wu 《Journal of Architectural Research and Development》 2021年第2期30-33,共4页
Bidding is a key link during the implementation of a construction project.For the same construction project,there are usually multiple construction companies bidding together to obtain the right to contract for the pr... Bidding is a key link during the implementation of a construction project.For the same construction project,there are usually multiple construction companies bidding together to obtain the right to contract for the project.However,there are still various irregularities in the bidding stage.This article analyzed the above problems and proposed a management strategy for the optimization of bidding,looking forward to improving the quality of bidding management of construction projects,solving various illegal bidding problems,and purifying the environment of bidding management. 展开更多
关键词 Construction engineering bidding management PROBLEMS SOLUTIONS
下载PDF
Penalty model for delay of bidding section construction period in South-to-North Water Diversion Eastern Route Project from perspective of programs 被引量:2
3
作者 Jing-chun FENG Ya-fang REN +2 位作者 Zhong-nan DUAN Zhan-jun LIU Hai-yang LI 《Water Science and Engineering》 EI CAS 2012年第3期350-360,共11页
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio... According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably, 展开更多
关键词 program establishment program management bidding section construction period critical path method (CPM) penaly model South-to-North Water Diversion Project
下载PDF
China Won the Bidding for Managing the Second Giant Oilfield of Kazakhstan
4
《China Oil & Gas》 CAS 1997年第3期174-174,共1页
关键词 China Won the bidding for Managing the Second Giant Oilfield of Kazakhstan
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部