In this paper,we aim to design a practical low complexity low-density parity-check(LDPC)coded scheme to build a secure open channel and protect information from eavesdropping.To this end,we first propose a punctured L...In this paper,we aim to design a practical low complexity low-density parity-check(LDPC)coded scheme to build a secure open channel and protect information from eavesdropping.To this end,we first propose a punctured LDPC coded scheme,where the information bits in a codeword are punctured and only the parity check bits are transmitted to the receiver.We further propose a notion of check node type distribution and derive multi-edge type extrinsic information transfer functions to estimate the security performance,instead of the well-known weak metric bit error rate.We optimize the check node type distribution in terms of the signal-to-noise ratio(SNR)gap and modify the progressive edge growth algorithm to design finite-length codes.Numerical results show that our proposed scheme can achieve a lower computational complexity and a smaller security gap,compared to the existing scrambling and puncturing schemes.展开更多
This paper assess the eco-environmental benefits that may come from the middle route project of China's South-North Water Transfer Scheme(SNWT) with principles and methods of eco-economics and planning reports of ...This paper assess the eco-environmental benefits that may come from the middle route project of China's South-North Water Transfer Scheme(SNWT) with principles and methods of eco-economics and planning reports of SNWT's middle route project. Some benefits were calculated in monetary units. To make sure that the results can be comparable with normal monetary indices, concrete assessment objects and the parameters are prudently selected according to the major characteristics of the project and its water import region. Primary assessment revealed that in different project construction stages, the benefit could be more than 13 07 billion RMB Yuan in 2010 and 19 79 billion RMB Yuan in 2030, respectively. The monetary value tends to increase with social-economic development. To realize these potential benefits, however, calls for more endeavors.展开更多
We demonstrate a triple-pass scheme for coherent transfer of optical frequency and the delay effect on the fiber phase noise compensation. It is theoretically proved that the delay effect consists of both fiber delay ...We demonstrate a triple-pass scheme for coherent transfer of optical frequency and the delay effect on the fiber phase noise compensation. It is theoretically proved that the delay effect consists of both fiber delay and servo delay. The delay effect confines the servo bandwidth within 1/8 and induces a residual fiber phase noise after noise compensation. For a 25-km-long fiber, the servo bandwidth is found to be around 1 k Hz, and the fiber phase noise is suppressed approaching to the theoretical limitation. The triple-pass scheme enables the simultaneous transfer of optical frequency to multiple remote users. The performance of noise compensator in the triple-pass scheme can achieve a similar level result compared with that in the double-pass scheme.展开更多
It is well known that there is abundant water resources in basin of the Yangtze River, the first largest river in China, which is mainly located in Southern China. However, water resources is very scarce in the basin ...It is well known that there is abundant water resources in basin of the Yangtze River, the first largest river in China, which is mainly located in Southern China. However, water resources is very scarce in the basin of the Yellow River, which is mainly located in Northern China. So the western route project of south-north water transfer scheme (WRP-SNWTS) aims to transfer water from the Yangtze River to the Yellow River. The area of WRP-SNWT, located in the upper reaches of the Yangtze River and the main areas of Sichuan and the marginal areas of the Qinghai-Tibet Plateau, has sufficient water resources but fragile ecology and environment. Therefore, it is necessary for WRP-SNWT to analyze the ecology water required. Based on the planning principles of from low elevation to high elevation, from small to large, from short to long and from easy to difficulty, the WRP-SNWT will be constructed through three stage projects. The western route first stage project of the south-north water transfer scheme (WRFST-SNWTS) is planned to transfer 4×10^9m^3/a from six tributaries of the Yalong river and from Dadu river to Jiaqu of Yellow River.. Daqu river and Niqu river are the branches of Xianshui river. Sequ river, Duke river, Make river and Ake river are the branches of Dadu river, which account for 65-70% of the total river run-off. It need more research and the rest run-off can satisfy channel ecology water required. According to analysis ecological water required which mainly satisfy for aquicolous biology in water-exporting region, such as low air temperature. Fish and aquicolous biology main living from May to August, and rivers are iced up from December to March of next year, ecology water required mainly for fish and aquicolous biology. The flow criterion of Tennant method is modified. The ecology water required of WRFSP-SNWTS is estimated by the flow data of Zhuwo gauging station, Zhuba gauging station, Chuosijia gauging station and Zumuzu gauging station. The result show that the ecology water required calculated by modified Tennant less 1 l percent than that of Tennant. This estimating result can supply more water resources for transferring to Yellow River. Meanwhile, this can supply gist for research transferring water of WRFSP-SNWTS.展开更多
Background Ni-kshay Poshan Yojana(NPY)is a direct benefit transfer scheme of the Government of India introduced in 2018 to support the additional nutritional requirements of persons with TB(PwTB).Our recent nationwide...Background Ni-kshay Poshan Yojana(NPY)is a direct benefit transfer scheme of the Government of India introduced in 2018 to support the additional nutritional requirements of persons with TB(PwTB).Our recent nationwide evaluation of implementation and utilization of NPY using programmatic data of PwTB from nine randomly selected Indian states,reported a 70%coverage and high median delay in benefit credit.We undertook a qualitative study between January and July 2023,to understand the detailed implementation process of NPY and explore the enablers and barriers to effective implementation and utilization of the NPY scheme.Methods We followed a grounded theory approach to inductively develop theoretical explanations for social phenomena through data generated from multiple sources.We conducted 36 in-depth interviews of national,district and field-level staff of the National Tuberculosis Elimination Programme(NTEP)and NPY beneficiaries from 30 districts across nine states of India,selected using theoretical sampling.An analytical framework developed through inductive coding of a set of six interviews,guided the coding of the subsequent interviews.Categories and themes emerged through constant comparison and the data collection continued until theoretical saturation.Results Stakeholders perceived NPY as a beneficial initiative.Strong political commitment from the state administration,mainstreaming of NTEP work with the district public healthcare delivery system,availability of good geographic and internet connectivity and state-specific grievance redressal mechanisms and innovations were identified as enablers of implementation.However,the complex,multi-level benefit approval process,difficulties in accessing banking services,perceived inadequacy of benefits and overworked human resources in the NTEP were identified as barriers to implementation and utilization.Conclusion The optimal utilization of NPY is enabled by strong political commitment and challenged by its lengthy implementation process and delayed disbursal of benefits.We recommend greater operational simplicity in NPY implementation,integrating NTEP activities with the public health system to reduce the burden on the program staff,and revising the benefit amount more equitably.展开更多
文摘In this paper,we aim to design a practical low complexity low-density parity-check(LDPC)coded scheme to build a secure open channel and protect information from eavesdropping.To this end,we first propose a punctured LDPC coded scheme,where the information bits in a codeword are punctured and only the parity check bits are transmitted to the receiver.We further propose a notion of check node type distribution and derive multi-edge type extrinsic information transfer functions to estimate the security performance,instead of the well-known weak metric bit error rate.We optimize the check node type distribution in terms of the signal-to-noise ratio(SNR)gap and modify the progressive edge growth algorithm to design finite-length codes.Numerical results show that our proposed scheme can achieve a lower computational complexity and a smaller security gap,compared to the existing scrambling and puncturing schemes.
文摘This paper assess the eco-environmental benefits that may come from the middle route project of China's South-North Water Transfer Scheme(SNWT) with principles and methods of eco-economics and planning reports of SNWT's middle route project. Some benefits were calculated in monetary units. To make sure that the results can be comparable with normal monetary indices, concrete assessment objects and the parameters are prudently selected according to the major characteristics of the project and its water import region. Primary assessment revealed that in different project construction stages, the benefit could be more than 13 07 billion RMB Yuan in 2010 and 19 79 billion RMB Yuan in 2030, respectively. The monetary value tends to increase with social-economic development. To realize these potential benefits, however, calls for more endeavors.
基金Supported by the National Natural Science Foundation of China under Grant No 61378037the Fundamental Research Funds for the Central Universities under Grant No JUSRP51628B
文摘We demonstrate a triple-pass scheme for coherent transfer of optical frequency and the delay effect on the fiber phase noise compensation. It is theoretically proved that the delay effect consists of both fiber delay and servo delay. The delay effect confines the servo bandwidth within 1/8 and induces a residual fiber phase noise after noise compensation. For a 25-km-long fiber, the servo bandwidth is found to be around 1 k Hz, and the fiber phase noise is suppressed approaching to the theoretical limitation. The triple-pass scheme enables the simultaneous transfer of optical frequency to multiple remote users. The performance of noise compensator in the triple-pass scheme can achieve a similar level result compared with that in the double-pass scheme.
文摘It is well known that there is abundant water resources in basin of the Yangtze River, the first largest river in China, which is mainly located in Southern China. However, water resources is very scarce in the basin of the Yellow River, which is mainly located in Northern China. So the western route project of south-north water transfer scheme (WRP-SNWTS) aims to transfer water from the Yangtze River to the Yellow River. The area of WRP-SNWT, located in the upper reaches of the Yangtze River and the main areas of Sichuan and the marginal areas of the Qinghai-Tibet Plateau, has sufficient water resources but fragile ecology and environment. Therefore, it is necessary for WRP-SNWT to analyze the ecology water required. Based on the planning principles of from low elevation to high elevation, from small to large, from short to long and from easy to difficulty, the WRP-SNWT will be constructed through three stage projects. The western route first stage project of the south-north water transfer scheme (WRFST-SNWTS) is planned to transfer 4×10^9m^3/a from six tributaries of the Yalong river and from Dadu river to Jiaqu of Yellow River.. Daqu river and Niqu river are the branches of Xianshui river. Sequ river, Duke river, Make river and Ake river are the branches of Dadu river, which account for 65-70% of the total river run-off. It need more research and the rest run-off can satisfy channel ecology water required. According to analysis ecological water required which mainly satisfy for aquicolous biology in water-exporting region, such as low air temperature. Fish and aquicolous biology main living from May to August, and rivers are iced up from December to March of next year, ecology water required mainly for fish and aquicolous biology. The flow criterion of Tennant method is modified. The ecology water required of WRFSP-SNWTS is estimated by the flow data of Zhuwo gauging station, Zhuba gauging station, Chuosijia gauging station and Zumuzu gauging station. The result show that the ecology water required calculated by modified Tennant less 1 l percent than that of Tennant. This estimating result can supply more water resources for transferring to Yellow River. Meanwhile, this can supply gist for research transferring water of WRFSP-SNWTS.
基金funded by the United States Agency for International Development(USAID)supported by Tuberculosis Implementation Framework Agreement(TIFA),implemented through John Snow Research&Training Institute Inc(JSI).
文摘Background Ni-kshay Poshan Yojana(NPY)is a direct benefit transfer scheme of the Government of India introduced in 2018 to support the additional nutritional requirements of persons with TB(PwTB).Our recent nationwide evaluation of implementation and utilization of NPY using programmatic data of PwTB from nine randomly selected Indian states,reported a 70%coverage and high median delay in benefit credit.We undertook a qualitative study between January and July 2023,to understand the detailed implementation process of NPY and explore the enablers and barriers to effective implementation and utilization of the NPY scheme.Methods We followed a grounded theory approach to inductively develop theoretical explanations for social phenomena through data generated from multiple sources.We conducted 36 in-depth interviews of national,district and field-level staff of the National Tuberculosis Elimination Programme(NTEP)and NPY beneficiaries from 30 districts across nine states of India,selected using theoretical sampling.An analytical framework developed through inductive coding of a set of six interviews,guided the coding of the subsequent interviews.Categories and themes emerged through constant comparison and the data collection continued until theoretical saturation.Results Stakeholders perceived NPY as a beneficial initiative.Strong political commitment from the state administration,mainstreaming of NTEP work with the district public healthcare delivery system,availability of good geographic and internet connectivity and state-specific grievance redressal mechanisms and innovations were identified as enablers of implementation.However,the complex,multi-level benefit approval process,difficulties in accessing banking services,perceived inadequacy of benefits and overworked human resources in the NTEP were identified as barriers to implementation and utilization.Conclusion The optimal utilization of NPY is enabled by strong political commitment and challenged by its lengthy implementation process and delayed disbursal of benefits.We recommend greater operational simplicity in NPY implementation,integrating NTEP activities with the public health system to reduce the burden on the program staff,and revising the benefit amount more equitably.