This paper discribes the importance and necessity of the study on the data structures for displaying the mining field using the interactive technology in open pit design and planning,based upon the grid block model. T...This paper discribes the importance and necessity of the study on the data structures for displaying the mining field using the interactive technology in open pit design and planning,based upon the grid block model. The commonly used data structures--rectangular array structure and quadtree structure ,are analyzed. Two compressed data structures--compressed circular link array structure and compressed doubly-linked circular array structure,are proposed,which are much more suitable for displaying the regularly gridded block model. When the two compressed data structures are adopted,the storage space can be tremendously saved and the algorithms are simple,while the requirements of the accuracy and the manipulating speed will be both satisfied for the interactive open pit short range plan formulation.展开更多
The deviation control of directional drilling is essentially the controlling of two angles of the wellbore actually drilled, namely, the inclination and azimuth. In directional drilling the bit trajectory never coinci...The deviation control of directional drilling is essentially the controlling of two angles of the wellbore actually drilled, namely, the inclination and azimuth. In directional drilling the bit trajectory never coincides exactly with the planned path, which is usually a plane curve with straight, building, holding, and dropping sections in succession. The drilling direction is of course dependant on the direction of the resultant forces acting on the bit and it is quite a tough job to hit the optimum target at the hole bottom as required. The traditional passive methods for correcting the drilling path have not met the demand to improve the techniques of deviation control. A method for combining wellbore surveys to obtain a composite, more accurate well position relies on accepting the position of the well from the most accurate survey instrument used in a given section of the wellbore. The error in each position measurement is the sum of many independent root sources of error effects. The relationship between surveys and other influential factors is considered, along with an analysis of different points of view. The collaborative work describes, establishes a common starting point of wellbore position uncertainty model, definition of what constitutes an error model, mathematics of position uncertainty calculation and an error model for basic directional service.展开更多
文摘This paper discribes the importance and necessity of the study on the data structures for displaying the mining field using the interactive technology in open pit design and planning,based upon the grid block model. The commonly used data structures--rectangular array structure and quadtree structure ,are analyzed. Two compressed data structures--compressed circular link array structure and compressed doubly-linked circular array structure,are proposed,which are much more suitable for displaying the regularly gridded block model. When the two compressed data structures are adopted,the storage space can be tremendously saved and the algorithms are simple,while the requirements of the accuracy and the manipulating speed will be both satisfied for the interactive open pit short range plan formulation.
文摘The deviation control of directional drilling is essentially the controlling of two angles of the wellbore actually drilled, namely, the inclination and azimuth. In directional drilling the bit trajectory never coincides exactly with the planned path, which is usually a plane curve with straight, building, holding, and dropping sections in succession. The drilling direction is of course dependant on the direction of the resultant forces acting on the bit and it is quite a tough job to hit the optimum target at the hole bottom as required. The traditional passive methods for correcting the drilling path have not met the demand to improve the techniques of deviation control. A method for combining wellbore surveys to obtain a composite, more accurate well position relies on accepting the position of the well from the most accurate survey instrument used in a given section of the wellbore. The error in each position measurement is the sum of many independent root sources of error effects. The relationship between surveys and other influential factors is considered, along with an analysis of different points of view. The collaborative work describes, establishes a common starting point of wellbore position uncertainty model, definition of what constitutes an error model, mathematics of position uncertainty calculation and an error model for basic directional service.