Coordinated controller tuning of the boiler turbine unit is a challenging task due to the nonlinear and coupling characteristics of the system.In this paper,a new variant of binary particle swarm optimization (PSO) ...Coordinated controller tuning of the boiler turbine unit is a challenging task due to the nonlinear and coupling characteristics of the system.In this paper,a new variant of binary particle swarm optimization (PSO) algorithm,called probability based binary PSO (PBPSO),is presented to tune the parameters of a coordinated controller.The simulation results show that PBPSO can effectively optimize the control parameters and achieves better control performance than those based on standard discrete binary PSO,modified binary PSO,and standard continuous PSO.展开更多
The capability to perform fast load-following has been an important issue in the power industry. An output tracking control system of a boiler-turbine unit is developed. The system is composed of stable inversion and ...The capability to perform fast load-following has been an important issue in the power industry. An output tracking control system of a boiler-turbine unit is developed. The system is composed of stable inversion and feedback controller. The stable inversion is implemented as a feedforward controller to improve the load-following capability, and the feedback controller is utilized to guarantee the stability and robustness of the whole system. Loop-shaping H∞ method is used to design the feedback controller and the final controller is reduced to a multivariable PI form. The output tracking control system takes account of the multivariable, nonlinear and coupling behavior of boiler-turbine system, and the simulation tests show that the control system works well and can be widely applied.展开更多
Based on the research on domestic and international automatic technical development in fossil power plant,the paper analyses the recent situation of the coordinate control system between turbine and boiler of domestic...Based on the research on domestic and international automatic technical development in fossil power plant,the paper analyses the recent situation of the coordinate control system between turbine and boiler of domestic fossil Power Plant,provides the development thought of coordinate control system between turbine and boiler,and describes the application prospect in control system of fossil power plant combining with the application experience.展开更多
Reducing the overspeed during load rejection would benefit the mechanical and hydraulic systems in a hydropower station. This paper presents some selected results of a pilot installation of a dynamic braking system. T...Reducing the overspeed during load rejection would benefit the mechanical and hydraulic systems in a hydropower station. This paper presents some selected results of a pilot installation of a dynamic braking system. The 4 MW dump load was installed and tested on a 10 MW Francis turbine unit. The results show that the overspeed reduction is obtained and compares well with simulation results. Further, a reduction in vibration levels is positive as well as the reduced time for stopping and possible resynchronization. It is argued that a similar system with continuous cooling could be used as an attractive alternative to spillway capacity.展开更多
The sugar cane containing minimum 30% fiber was referred as bagasse and used the generation of power required for the operation of sugar mill. The bagasse is fired in the boiler for producing steam at high pressure, w...The sugar cane containing minimum 30% fiber was referred as bagasse and used the generation of power required for the operation of sugar mill. The bagasse is fired in the boiler for producing steam at high pressure, which is extracted through various single high capacity turbines and used in the process. The installation of high pressure boilers and high pressure turbo-generators has provision for the operation of co-generation plant during the off-season also that enhances the power generation from 9MW to 23MW. The annual monetary benefits achieved are Rs. 204.13 million and this was based on cost of power sold to the grid @ Rs 2.548 per unit, sugar season of 219 days and off season of 52 days. This required an investment of Rs 820.6 million. The investment had an attractive simple payback period of 48 months.展开更多
In this paper, the problem of designing a controller for a highly coupled constrained nonlinear boiler- turbine system is addressed with a predictive controller. First, a nonlinear predictive control is implemented by...In this paper, the problem of designing a controller for a highly coupled constrained nonlinear boiler- turbine system is addressed with a predictive controller. First, a nonlinear predictive control is implemented by genetic algorithm. Second, to guarantee fast output stabilization, an H-infinity fuzzy state-feedback tracking control is applied with a designed switching principle. The success of such a control structure is based on taking advantage of the optimal input sequence derived from the nonlinear predictive control based on artificial intelligent while ensuring a fast decay of the steady state error. Simulation results of the proposed design are given to illustrate its effectiveness and compared to other control schemes.展开更多
基金supported by Projects of Shanghai Science and Technology Community (No. 10ZR1411800,No. 08160705900,No. 08160512100)Shanghai University "the 11th Five-Year Plan"+1 种基金211 Construction ProjectMechatronics Engineering Innovation Group Project from Shanghai Education Commission
文摘Coordinated controller tuning of the boiler turbine unit is a challenging task due to the nonlinear and coupling characteristics of the system.In this paper,a new variant of binary particle swarm optimization (PSO) algorithm,called probability based binary PSO (PBPSO),is presented to tune the parameters of a coordinated controller.The simulation results show that PBPSO can effectively optimize the control parameters and achieves better control performance than those based on standard discrete binary PSO,modified binary PSO,and standard continuous PSO.
文摘The capability to perform fast load-following has been an important issue in the power industry. An output tracking control system of a boiler-turbine unit is developed. The system is composed of stable inversion and feedback controller. The stable inversion is implemented as a feedforward controller to improve the load-following capability, and the feedback controller is utilized to guarantee the stability and robustness of the whole system. Loop-shaping H∞ method is used to design the feedback controller and the final controller is reduced to a multivariable PI form. The output tracking control system takes account of the multivariable, nonlinear and coupling behavior of boiler-turbine system, and the simulation tests show that the control system works well and can be widely applied.
文摘Based on the research on domestic and international automatic technical development in fossil power plant,the paper analyses the recent situation of the coordinate control system between turbine and boiler of domestic fossil Power Plant,provides the development thought of coordinate control system between turbine and boiler,and describes the application prospect in control system of fossil power plant combining with the application experience.
文摘Reducing the overspeed during load rejection would benefit the mechanical and hydraulic systems in a hydropower station. This paper presents some selected results of a pilot installation of a dynamic braking system. The 4 MW dump load was installed and tested on a 10 MW Francis turbine unit. The results show that the overspeed reduction is obtained and compares well with simulation results. Further, a reduction in vibration levels is positive as well as the reduced time for stopping and possible resynchronization. It is argued that a similar system with continuous cooling could be used as an attractive alternative to spillway capacity.
文摘The sugar cane containing minimum 30% fiber was referred as bagasse and used the generation of power required for the operation of sugar mill. The bagasse is fired in the boiler for producing steam at high pressure, which is extracted through various single high capacity turbines and used in the process. The installation of high pressure boilers and high pressure turbo-generators has provision for the operation of co-generation plant during the off-season also that enhances the power generation from 9MW to 23MW. The annual monetary benefits achieved are Rs. 204.13 million and this was based on cost of power sold to the grid @ Rs 2.548 per unit, sugar season of 219 days and off season of 52 days. This required an investment of Rs 820.6 million. The investment had an attractive simple payback period of 48 months.
基金supported by the Chinese Scholarship Council, the Project of Chinese Ministry of Education (No. 108060)the Doctoral Fund of Ministry of Education of China (No. 20090092110051)the National Natural Science Foundation of China (Nos. 51036002, 51076027)
文摘In this paper, the problem of designing a controller for a highly coupled constrained nonlinear boiler- turbine system is addressed with a predictive controller. First, a nonlinear predictive control is implemented by genetic algorithm. Second, to guarantee fast output stabilization, an H-infinity fuzzy state-feedback tracking control is applied with a designed switching principle. The success of such a control structure is based on taking advantage of the optimal input sequence derived from the nonlinear predictive control based on artificial intelligent while ensuring a fast decay of the steady state error. Simulation results of the proposed design are given to illustrate its effectiveness and compared to other control schemes.