期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Mechanism on simulation and experiment of pre-crack seam formation in stope roof 被引量:1
1
作者 胡建华 雷涛 +2 位作者 周科平 刘浪 劳德正 《Journal of Central South University》 SCIE EI CAS 2014年第4期1526-1533,共8页
The pre-crack blast technology has been used to control the induction caving area in the roof. The key is to form the pre-crack seam and predict the effect of the seam. The H-J-C blast model was built in the roof. Bas... The pre-crack blast technology has been used to control the induction caving area in the roof. The key is to form the pre-crack seam and predict the effect of the seam. The H-J-C blast model was built in the roof. Based on the theories of dynamic strength and failure criterion of dynamic rock, the rock dynamic damage and the evolution of pre-crack seam were simulated by the tensile damage and shear failure of the model. According to the actual situation of No. 92 ore body test stope at Tongkeng Mine, the formation process of the pre-crack blast seam was simulated by Ansys/Ls-dyna software, the pre-crack seam was inspected by a system of digital panoramic borehole camera. The pre-crack seam was inspected by the system of digital panoramic borehole in the roof. The results of the numerical simulation and inspection show that in the line of centers of pre-hole, the minimum of the tensile stress reaches 20 MPa, which is much larger than 13.7 MPa of the dynamic tensile strength of rock. The minimum particle vibration velocity reaches 50 cm/s, which is greater than 30-40 cm/s of the allowable vibration velocity. It is demonstrated that the rock is destroyed near the center line and the pre-crack is successfully formed by the large diameters and large distances pre-crack holes in the roof. 展开更多
关键词 induction caving dynamic damage model pre-crack seam numerical simulation digital borehole camera
下载PDF
Predicting the excavation damaged zone within brittle surrounding rock masses of deep underground caverns using a comprehensive approach integrating in situ measurements and numerical analysis 被引量:2
2
作者 Ding-Ping Xu Xiang Huang +4 位作者 Shao-Jun Li Huai-Sheng Xu Shi-Li Qiu Hong Zheng Quan Jiang 《Geoscience Frontiers》 SCIE CAS CSCD 2022年第2期186-199,共14页
Excavation Damaged Zone(EDZ)scope is important for optimizing excavation and support schemes in deep underground caverns.However,accurately predicting the full EDZ scope within the surrounding rock masses of deep unde... Excavation Damaged Zone(EDZ)scope is important for optimizing excavation and support schemes in deep underground caverns.However,accurately predicting the full EDZ scope within the surrounding rock masses of deep underground caverns during excavation remains a pressing problem.This study presents a comprehensive EDZ scope prediction approach(CESPA)for the brittle surrounding rock masses of deep underground caverns by coupling numerical simulation with quantitative analysis of borehole wall images and ultrasonic test results.First,the changes in both P-velocity(V_(p))and joint distribution of the surrounding rock masses before and after excavation damage are captured using ultrasonic tests and borehole digital cameras.Second,the quality Q-parameters of the surrounding rock mass before and after excavation damage are preliminarily rated with the rock mass descriptions provided by borehole wall images,and the rock mass V_(p)-parameter values are determined according to the V_(p)-borehole depth curves.Third,the Q-parameter ratings are further finely adjusted by updating the related Q-values to be similar with the Q-values estimated by V_(p)-parameter values.Fourth,the initial and residual mechanical parameters for the rock mass deterioration model(RDM)are estimated by the adjusted Q-parameter ratings based on the modified Q-based relations,and the elastic modulus deterioration index(EDI)threshold to describe the EDZ boundary is determined with the V_(p)-parameter values.Finally,EDZ scope is predicted using the elastoplastic numerical simulation with RDM and EDI based on the mechanical parameter estimates and EDI threshold.Analyses of applications in Sub-lab D1 in Jinping II project show that CESPA can provide a reliable and operable solution for predicting full EDZ scopes within the brittle surrounding rock masses of deep underground caverns. 展开更多
关键词 Excavation damaged zone borehole digital camera Ultrasonic test Q-system Rock mass deterioration model
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部