期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
MODIFIED BOTTLENECK-BASED PROCEDURE FOR LARGE-SCALE FLOW-SHOP SCHEDULING PROBLEMS WITH BOTTLENECK
1
作者 ZUO Yan GU Hanyu XI Yugeng 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2006年第3期356-361,共6页
A new bottleneck-based heuristic for large-scale flow-shop scheduling problems with a bottleneck is proposed, which is simpler but more tailored than the shifting bottleneck (SB) procedure. In this algorithm, a sche... A new bottleneck-based heuristic for large-scale flow-shop scheduling problems with a bottleneck is proposed, which is simpler but more tailored than the shifting bottleneck (SB) procedure. In this algorithm, a schedule for the bottleneck machine is first constructed optimally and then the non-bottleneck machines are scheduled around the bottleneck schedule by some effective dispatching rules. Computational results show that the modified bottleneck-based procedure can achieve a tradeoff between solution quality and computational time comparing with SB procedure for medium-size problems. Furthermore it can obtain a good solution in quite short time for large-scale scheduling problems. 展开更多
关键词 Flow-shop scheduling problem Heuristic bottleneck machine
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部