期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
A calculation model for breakdown time delay and jitter of gas switches under hundred-nanosecond pulses and its application in a self-triggered pre-ionized switch 被引量:1
1
作者 王天驰 王海洋 +7 位作者 陈伟 杜应超 谢霖燊 黄涛 陈志强 李俊娜 郭帆 吴刚 《Plasma Science and Technology》 SCIE EI CAS CSCD 2021年第11期152-166,共15页
In this paper, a calculation model for the breakdown time delay and jitter of gas switches under hundred-nanosecond pulses is proposed and applied in a self-triggered pre-ionized switch. The effects of injection time ... In this paper, a calculation model for the breakdown time delay and jitter of gas switches under hundred-nanosecond pulses is proposed and applied in a self-triggered pre-ionized switch. The effects of injection time of pre-ionization, pulse rise time, and the pre-ionization jitter are discussed and verified through experiments. It indicates that the pre-ionization should be injected when the electric field is high enough in the gap, injection after 80% peak-time can ensure its effectiveness.Then the statistical time delay jitter will be determined by the pre-ionization jitter, which is an intrinsic restriction of the self-triggered switch. However, when the changing rate of the pulsed electric field exceeds a certain value, the breakdown time delay jitter can be partly offset in the formative stage because the formative time delay has an exponential relationship with the electric field. Therefore, lower time jitter can be obtained under pulses with a shorter pulse rise time. In general, the results of the calculation model agree with the experimental results, and the experimental parameters which lead to a low jitter can also be used as a reference. 展开更多
关键词 gas switch nanosecond pulse breakdown time delay JITTER distribution model
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部