To solve the problem of residual wind power in offshore wind farms,a hydrogen production system with a reasonable capacity was configured to enhance the local load of wind farms and promote the local consumption of re...To solve the problem of residual wind power in offshore wind farms,a hydrogen production system with a reasonable capacity was configured to enhance the local load of wind farms and promote the local consumption of residual wind power.By studying the mathematical model of wind power output and calculating surplus wind power,as well as considering the hydrogen production/storage characteristics of the electrolyzer and hydrogen storage tank,an innovative capacity optimization allocation model was established.The objective of the model was to achieve the lowest total net present value over the entire life cycle.The model took into account the cost-benefit breakdown of equipment end-of-life cost,replacement cost,residual value gain,wind abandonment penalty,hydrogen transportation,and environmental value.The MATLAB-based platform invoked the CPLEX commercial solver to solve the model.Combined with the analysis of the annual average wind speed data from an offshore wind farm in Guangdong Province,the optimal capacity configuration results and the actual operation of the hydrogen production system were obtained.Under the calculation scenario,this hydrogen production system could consume 3,800 MWh of residual electricity from offshore wind power each year.It could achieve complete consumption of residual electricity from wind power without incurring the penalty cost of wind power.Additionally,it could produce 66,500 kg of green hydrogen from wind power,resulting in hydrogen sales revenue of 3.63 million RMB.It would also reduce pollutant emissions from coal-based hydrogen production by 1.5 tons and realize an environmental value of 4.83 million RMB.The annual net operating income exceeded 6 million RMB and the whole life cycle NPV income exceeded 50 million RMB.These results verified the feasibility and rationality of the established capacity optimization allocation model.The model could help advance power system planning and operation research and assist offshore wind farm operators in improving economic and environmental benefits.展开更多
Large-scale electric vehicles(EVs) connected to the micro grid would cause many problems. In this paper, with the consideration of vehicle to grid(V2 G), two charging and discharging load modes of EVs were constructed...Large-scale electric vehicles(EVs) connected to the micro grid would cause many problems. In this paper, with the consideration of vehicle to grid(V2 G), two charging and discharging load modes of EVs were constructed. One was the disorderly charging and discharging mode based on travel habits, and the other was the orderly charging and discharging mode based on time-of-use(TOU) price;Monte Carlo method was used to verify the case. The scheme of the capacity optimization of photovoltaic charging station under two different charging and discharging modes with V2 G was proposed. The mathematical models of the objective function with the maximization of energy efficiency, the minimization of the investment and the operation cost of the charging system were established. The range of decision variables, constraints of the requirements of the power balance and the strategy of energy exchange were given. NSGA-Ⅱ and NSGA-SA algorithm were used to verify the cases, respectively. In both algorithms, by comparing with the simulation results of the two different modes, it shows that the orderly charging and discharging mode with V2 G is obviously better than the disorderly charging and discharging mode in the aspects of alleviating the pressure of power grid, reducing system investment and improving energy efficiency.展开更多
Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we p...Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we proposed an optimum allocation method of installed capacity of the solar-thermal power station based on chance constrained programming in this work.Firstly,we established the uncertainty model of wind power and PV based on the chance constrained planning theory.Then we used the K-medoids clusteringmethod to cluster the scenarios considering the actual operation scenarios throughout the year.Secondly,we established the optimal configuration model based on the objective function of the strongest transient voltage stability and the lowest overall cost of operation.Finally,by quantitative analysis of actual wind power and photovoltaic new energy base,this work verified the feasibility of the proposed method.As a result of the simulations,we found that using the optimal configuration method of solar-thermal power stations could ensure an accurate allocation of installed capacity.When the installed capacity of the solar-thermal power station is 1×106 kW,the transient voltage recovery index(TVRI)is 0.359,which has a strong voltage support capacity for the system.Based on the results of this work,the optimal configuration of the installed capacity of the solar-thermal power plant can improve peak shaving performance,transient voltage support capability,and new energy consumption while satisfying the Direct Current(DC)outgoing transmission premise.展开更多
基金supported by Manage Innovation Project of China Southern Power Grid Co.,Ltd.(No.GZHKJXM20210232).
文摘To solve the problem of residual wind power in offshore wind farms,a hydrogen production system with a reasonable capacity was configured to enhance the local load of wind farms and promote the local consumption of residual wind power.By studying the mathematical model of wind power output and calculating surplus wind power,as well as considering the hydrogen production/storage characteristics of the electrolyzer and hydrogen storage tank,an innovative capacity optimization allocation model was established.The objective of the model was to achieve the lowest total net present value over the entire life cycle.The model took into account the cost-benefit breakdown of equipment end-of-life cost,replacement cost,residual value gain,wind abandonment penalty,hydrogen transportation,and environmental value.The MATLAB-based platform invoked the CPLEX commercial solver to solve the model.Combined with the analysis of the annual average wind speed data from an offshore wind farm in Guangdong Province,the optimal capacity configuration results and the actual operation of the hydrogen production system were obtained.Under the calculation scenario,this hydrogen production system could consume 3,800 MWh of residual electricity from offshore wind power each year.It could achieve complete consumption of residual electricity from wind power without incurring the penalty cost of wind power.Additionally,it could produce 66,500 kg of green hydrogen from wind power,resulting in hydrogen sales revenue of 3.63 million RMB.It would also reduce pollutant emissions from coal-based hydrogen production by 1.5 tons and realize an environmental value of 4.83 million RMB.The annual net operating income exceeded 6 million RMB and the whole life cycle NPV income exceeded 50 million RMB.These results verified the feasibility and rationality of the established capacity optimization allocation model.The model could help advance power system planning and operation research and assist offshore wind farm operators in improving economic and environmental benefits.
基金Project(3502Z20179026)supported by Xiamen Science and Technology Project,China。
文摘Large-scale electric vehicles(EVs) connected to the micro grid would cause many problems. In this paper, with the consideration of vehicle to grid(V2 G), two charging and discharging load modes of EVs were constructed. One was the disorderly charging and discharging mode based on travel habits, and the other was the orderly charging and discharging mode based on time-of-use(TOU) price;Monte Carlo method was used to verify the case. The scheme of the capacity optimization of photovoltaic charging station under two different charging and discharging modes with V2 G was proposed. The mathematical models of the objective function with the maximization of energy efficiency, the minimization of the investment and the operation cost of the charging system were established. The range of decision variables, constraints of the requirements of the power balance and the strategy of energy exchange were given. NSGA-Ⅱ and NSGA-SA algorithm were used to verify the cases, respectively. In both algorithms, by comparing with the simulation results of the two different modes, it shows that the orderly charging and discharging mode with V2 G is obviously better than the disorderly charging and discharging mode in the aspects of alleviating the pressure of power grid, reducing system investment and improving energy efficiency.
基金funded by Major Science and Technology Projects in Gansu Province(19ZD2GA003).
文摘Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we proposed an optimum allocation method of installed capacity of the solar-thermal power station based on chance constrained programming in this work.Firstly,we established the uncertainty model of wind power and PV based on the chance constrained planning theory.Then we used the K-medoids clusteringmethod to cluster the scenarios considering the actual operation scenarios throughout the year.Secondly,we established the optimal configuration model based on the objective function of the strongest transient voltage stability and the lowest overall cost of operation.Finally,by quantitative analysis of actual wind power and photovoltaic new energy base,this work verified the feasibility of the proposed method.As a result of the simulations,we found that using the optimal configuration method of solar-thermal power stations could ensure an accurate allocation of installed capacity.When the installed capacity of the solar-thermal power station is 1×106 kW,the transient voltage recovery index(TVRI)is 0.359,which has a strong voltage support capacity for the system.Based on the results of this work,the optimal configuration of the installed capacity of the solar-thermal power plant can improve peak shaving performance,transient voltage support capability,and new energy consumption while satisfying the Direct Current(DC)outgoing transmission premise.