Thermal performance of cast-in-place piles with artificial ground freezing in permafrost regions
1
作者 WANG Xinbin CHEN Kun +3 位作者 YU Qihao GUO Lei YOU Yanhui JIN Mingyang 《Journal of Mountain Science》 SCIE CSCD 2024年第4期1307-1328,共22页
During the construction of cast-in-place piles in warm permafrost,the heat carried by concrete and the cement hydration reaction can cause strong thermal disturbance to the surrounding permafrost.Since the bearing cap... During the construction of cast-in-place piles in warm permafrost,the heat carried by concrete and the cement hydration reaction can cause strong thermal disturbance to the surrounding permafrost.Since the bearing capacity of the pile is quite small before the full freeze-back,the quick refreezing of the native soils surrounding the cast-in-place pile has become the focus of the infrastructure construction in permafrost.To solve this problem,this paper innovatively puts forward the application of the artificial ground freezing(AGF)method at the end of the curing period of cast-in-place piles in permafrost.A field test on the AGF was conducted at the Beiluhe Observation and Research Station of Frozen Soil Engineering and Environment(34°51.2'N,92°56.4'E)in the Qinghai Tibet Plateau(QTP),and then a 3-D numerical model was established to investigate the thermal performance of piles using AGF under different engineering conditions.Additionally,the long-term thermal performance of piles after the completion of AGF under different conditions was estimated.Field experiment results demonstrate that AGF is an effective method to reduce the refreezing time of the soil surrounding the piles constructed in permafrost terrain,with the ability to reduce the pile-soil interface temperatures to below the natural ground temperature within 3 days.Numerical results further prove that AGF still has a good cooling effect even under unfavorable engineering conditions such as high pouring temperature,large pile diameter,and large pile length.Consequently,the application of this method is meaningful to save the subsequent latency time and solve the problem of thermal disturbance in pile construction in permafrost.The research results are highly relevant for the spread of AGF technology and the rapid building of pile foundations in permafrost. 展开更多
关键词 Permafrost engineering cast-in-place pile Artificial ground freezing Thermal performance.
下载PDF
Longitudinal vibration characteristics of a tapered pipe pile considering the vertical support of surrounding soil and construction disturbance
2
作者 Li Zhenya Pan Yunchao +2 位作者 He Xianbin Lv Chong Mohammad Towhid 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2024年第1期51-63,共13页
This research is concentrated on the longitudinal vibration of a tapered pipe pile considering the vertical support of the surrounding soil and construction disturbance.First,the pile-soil system is partitioned into f... This research is concentrated on the longitudinal vibration of a tapered pipe pile considering the vertical support of the surrounding soil and construction disturbance.First,the pile-soil system is partitioned into finite segments in the vertical direction and the Voigt model is applied to simulate the vertical support of the surrounding soil acting on the pile segment.The surrounding soil is divided into finite ring-shaped zones in the radial direction to consider the construction disturbance.Then,the shear complex stiffness at the pile-soil interface is derived by solving the dynamic equilibrium equation for the soil from the outermost to innermost zone.The displacement impedance at the top of an arbitrary pile segment is obtained by solving the dynamic equilibrium equation for the pile and is combined with the vertical support of the surrounding soil to derive the displacement impedance at the bottom of the upper adjacent segment.Further,the displacement impedance at the pile head is obtained based on the impedance function transfer technique.Finally,the reliability of the proposed solution is verified,followed by a sensitivity analysis concerning the coupling effect of the pile parameters,construction disturbance and the vertical support of the surrounding soil on the displacement impedance of the pile. 展开更多
关键词 tapered pipe pile longitudinal vibration vertical support of the surrounding soil construction disturbance displacement impedance
下载PDF
Construction Technology of Pile Foundation for Subway Tunnel Crossing Bridge
3
作者 Ruiquan Liu 《Journal of World Architecture》 2024年第2期37-42,共6页
Urban infrastructure has become more complex with the rapid development of urban transportation networks.In urban environments with limited space,construction of facilities like subways and bridges may mutually influe... Urban infrastructure has become more complex with the rapid development of urban transportation networks.In urban environments with limited space,construction of facilities like subways and bridges may mutually influence each other,especially when subway construction requires passing under bridges.In such cases,pile foundation replacement technology is often necessary.However,this technology is highly specialized,with a lengthy and risky construction period,and high costs.Personnel must be proficient in key technical aspects to ensure construction quality.This article discusses the technical principle,construction process,and core technology of pile foundation replacement,along with the application of this technology in subway tunnel crossing bridge projects,supported by engineering examples for reference. 展开更多
关键词 Subway tunnel Bridge pile foundation Replacement construction
下载PDF
Design and construction of high and large span cast-in-place reinforced concrete cantilever flowering frame beam
4
作者 WANG Rui ZHEN Liang +2 位作者 WAN Chao WU Jing SHEN Yan-jun 《Journal of Civil Engineering and Architecture》 2009年第5期58-62,共5页
The high and large span cast-in-place reinforced concrete cantilever structure of the office building of some court, which is located I-steel at the cantilever and used steel pipe scaffold as the support, has guarante... The high and large span cast-in-place reinforced concrete cantilever structure of the office building of some court, which is located I-steel at the cantilever and used steel pipe scaffold as the support, has guaranteed the frame body and structure security by the frame body calculating, on-site test and reasonable construction order. 展开更多
关键词 cast-in-place reinforced concrete support of cantilever structure high and long span design and construction
下载PDF
Refreezing of cast-in-place piles under various engineering conditions 被引量:9
5
作者 Lei Guo QiHao Yu +2 位作者 XiaoNing Li XinBin Wang YongYu Yue 《Research in Cold and Arid Regions》 CSCD 2015年第4期376-383,共8页
In the construction of the Qinghai-Tibet Power Transmission Line (QTPTL), cast-in-place piles (CIPPs) are widely applied in areas with unfavorable geological conditions. The thermal regime around piles in permafro... In the construction of the Qinghai-Tibet Power Transmission Line (QTPTL), cast-in-place piles (CIPPs) are widely applied in areas with unfavorable geological conditions. The thermal regime around piles in permafrost regions greatly affects the stability of the towers as well as the operation of the QTPTL. The casting of piles will markedly affect the thermal regime of the surrounding permafrost because of the casting temperature and the hydration heat of cement. Based on the typical geological and engineering conditions along the QTPTL, thermal disturbance ofa CIPP to surrounding permafrost under different casting seasons, pile depths, and casting temperatures were simulated. The results show that the casting season (summer versus winter) can influence the refreezing process of CIPPs, within the first 6 m of pile depth. Sixty days after being cast, CIPPs greater than 6 m in depth can be frozen regardless of which season they were cast, and the foundation could be reffozen after a cold season. Comparing the refreezing characteristics of CIPPs cast in different seasons also showed that, without considering the ground surface conditions, warm seasons are more suitable for casting piles. With the increase of pile depth, the thermal effect of a CIPP on the surrounding soil mainly expands vertically, while the lateral heat disturbance changes little. Deeper, longer CIPPs have better stability. The casting temperature clearly affects the thermal disturbance, and the radius of the melting circle increases with rising casting temperature. The optimal casting temperature is between 2 ℃ and 9 ℃. 展开更多
关键词 cast-in-place pile hydration heat REFREEZING engineering factor PERMAFROST
下载PDF
Physical modeling of behaviors of cast-in-place concrete piled raft compared to free-standing pile group in sand 被引量:1
6
作者 Mehdi Sharafkhah Issa Shooshpasha 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2018年第4期703-716,共14页
Similar to free-standing pile groups, piled raft foundations are conventionally designed in which the piles carry the total load of structure and the raft bearing capacity is not taken into account. Numerous studies i... Similar to free-standing pile groups, piled raft foundations are conventionally designed in which the piles carry the total load of structure and the raft bearing capacity is not taken into account. Numerous studies indicated that this method is too conservative. Only when the pile cap is elevated from the ground level,the raft bearing contribution can be neglected. In a piled raft foundation, pileesoileraft interaction is complicated. Although several numerical studies have been carried out to analyze the behaviors of piled raft foundations, very few experimental studies are reported in the literature. The available laboratory studies mainly focused on steel piles. The present study aims to compare the behaviors of piled raft foundations with free-standing pile groups in sand, using laboratory physical models. Cast-in-place concrete piles and concrete raft are used for the tests. The tests are conducted on single pile, single pile in pile group, unpiled raft, free-standing pile group and piled raft foundation. We examine the effects of the number of piles, the pile installation method and the interaction between different components of foundation. The results indicate that the ultimate bearing capacity of the piled raft foundation is considerably higher than that of the free-standing pile group with the same number of piles. With installation of the single pile in the group, the pile bearing capacity and stiffness increase. Installation of the piles beneath the raft decreases the bearing capacity of the raft. When the raft bearing capacity is not included in the design process, the allowable bearing capacity of the piled raft is underestimated by more than 200%. This deviation intensifies with increasing spacing of the piles. 展开更多
关键词 Free-standing pile group piled raft pileesoileraft interaction Physical modeling cast-in-place concrete piles
下载PDF
Field observation of the thermal disturbance and freezeback processes of cast-in-place pile foundations in warm permafrost regions 被引量:1
7
作者 Xin Hou Ji Chen +4 位作者 YouQian Liu PengFei Rui JingYi Zhao ShouHong Zhang HaiMing Dang 《Research in Cold and Arid Regions》 CSCD 2023年第1期18-26,共9页
The bearing capacity of pile foundations is affected by the temperature of the frozen soil around pile foundations.The construction process and the hydration heat of cast-in-place(CIP)pile foundations affect the therm... The bearing capacity of pile foundations is affected by the temperature of the frozen soil around pile foundations.The construction process and the hydration heat of cast-in-place(CIP)pile foundations affect the thermal stability of permafrost.In this paper,temperature data from inside multiple CIP piles,borehole observations of ground thermal status adjacent to the foundations and local weather stations were monitored in warm permafrost regions to study the thermal influence process of CIP pile foundations.The following conclusions are drawn from the field observation data.(1)The early temperature change process of different CIP piles is different,and the differences gradually diminish over time.(2)The initial concrete temperature is linearly related with the air temperature,net radiation and wind speed within 1 h before the completion of concrete pouring;the contributions of the air temperature,net radiation,and wind speed to the initial concrete temperature are 51.9%,20.3%and 27.9%,respectively.(3)The outer boundary of the thermal disturbance annulus is approximately 2 m away from the pile center.It took more than 224 days for the soil around the CIP piles to return to the natural permafrost temperature at the study site. 展开更多
关键词 PERMAFROST cast-in-place pile foundations Thermal disturbance Freezeback process Initial concrete temperature
下载PDF
Characteristics and Construction Technology Analysis of Static Pressure Prestressed Pipe Piles in Construction Engineering 被引量:1
8
作者 Wu Cuipeng 《Journal of Architectural Research and Development》 2018年第3期55-58,共4页
The development of urbanization has led to an increase in the number and scale of construction projects and the types of building construction engineering are getting advance and diverse due to the rapid development o... The development of urbanization has led to an increase in the number and scale of construction projects and the types of building construction engineering are getting advance and diverse due to the rapid development of technology.One of them is the static pressure prestressed pipe pile which is the most commonly used technology in modern building construction work.It is mainly used for pile foundation in construction work,and it has the advantages in less pollution,low noise,and high efficiency compared to the traditional pile foundation.Study on the characteristics of static pressure prestressed pipe pile must be carried out and strengthened the research to increase the effectiveness and quality of static pressure prestressed pipe pile on construction works.This paper is mainly to analyzed the characteristic and construction technology of static pressure prestressed pipe piles on building construction work. 展开更多
关键词 building construction WORK STATIC pressure PRESTRESSED PIPE pile characteristic construction WORK technology
下载PDF
Field study of plastic tube cast-in-place concrete pile
9
作者 陈永辉 曹德洪 +2 位作者 王新泉 杜海伟 张霆 《Journal of Central South University》 SCIE EI CAS 2008年第S2期195-202,共8页
The compositions, technical principles and construction equipments of a new piling method used for ground improvement plastic tube cast-in-place concrete pile were introduced. The results from static load tests on sin... The compositions, technical principles and construction equipments of a new piling method used for ground improvement plastic tube cast-in-place concrete pile were introduced. The results from static load tests on single piles with different forms of pile shoes and on their composite foundations were analyzed. The distribution patterns of axial force, shaft friction and toe resistance were studied based on the measurements taken from buried strain gauges. From the point of engineering application, the pile has merits in convenient quality control, high bearing capacity and reliable quality, showing higher reasonability, advancement and suitability than other ground improvement methods. The pile can be adopted properly to take place of ordinary ground improvement method, achieving greater economical and social benefits. 展开更多
关键词 PLASTIC tube cast-in-place concrete pile SOFT ground improvement pile-supported type reinforced EMBANKMENT construction equipment construction workmanship
下载PDF
Design and construction of scour protection for deep-water group pile foundation structures of two pylons in the Sutong Bridge project
10
作者 He Ping Guan Yijun Zhang Xiongwen Zhang Qun Zhou Jianhua 《Engineering Sciences》 EI 2009年第1期37-44,共8页
Sutong Bridge,as a world-record cable-stayed bridge with its main span exceeding 1 000 m constructed in Yangtze River estuary region in China,is located at a site with complicated hydrologic conditions and poor geotec... Sutong Bridge,as a world-record cable-stayed bridge with its main span exceeding 1 000 m constructed in Yangtze River estuary region in China,is located at a site with complicated hydrologic conditions and poor geotechnical conditions and therefore,scour protection will be a decisive factor for ensuring smooth and successful construction of this bridge.This paper,starting from structural description of deep-water group pile foundation,analyzes impact to the bridge safety introduced by scour and its protection and further presents different solutions of scour protection for foundation structures of this bridge. 展开更多
关键词 Sutong Bridge deep-water group piles scour protection DESIGN construction
下载PDF
Investigation of Pile Construction and Productivity Loss: An Analysis of Macro Impact Factor
11
作者 Minhaz Ahmed Wang Xu 《World Journal of Engineering and Technology》 2023年第4期932-964,共33页
Pile foundations are challenging to build due to subsurface obstacles, contractor ignorance, and difficulties with site planning. Given the unpredictable environment of the construction site, productivity losses durin... Pile foundations are challenging to build due to subsurface obstacles, contractor ignorance, and difficulties with site planning. Given the unpredictable environment of the construction site, productivity losses during pile work are to be thought possible. Prior to finishing a site pre-investigation, a foundation’s area is usually sampled for statistical reasons. There are studies on pile construction outside of Bangladesh that are supported by relevant empirical data in the literature. Since Bangladesh, which is regarded as a third-world country, is ignored in this regard, the literature currently available about pile building and the associated productivity loss is unable to provide adequate information or appropriate empirical data. Due to this pile-building sector in Bangladesh has been experiencing a decline in production for quite some time now. Before attempting to increase productivity in pile construction, it is essential to investigate the potential losses and the variables that might have an influence. This study aims to accomplish the following objectives: 1) identify the primary factors that have an impact on pile construction;2) develop an SVR model that accurately predicts productivity loss;and 3) figure out the projected loss by basing it on the historical scenario that is the most comparable to the current one. A Support Vector Regression (SVR) model was developed after a study of the relevant literature. This model enabled the collection of 110 pile building projects from five significant locations in Bangladesh. The model was constructed using a list of eight inputs in addition to a list of five macro elements (labor, management, environment, material, and equipment) (soil condition, pile type, pile material, project size, project location, pile depth, pile quantity, and equipment quantity). Using 10-way cross validation, the SVR achieves an accuracy of 87.2% in its predictions. On the basis of what has occurred in the past, we are able to estimate that there will be a loss of around 18.55 percent of the total output. A new perspective for engineers studying the delay factors with productivity loss is provided by the outcome of important tasks as it relates to loss in productivity and overall factors faced. In the building construction industry, effective management should place more emphasis on the correlation between productivity loss and the factors that cause it. Therefore, to represent the effect on productivity loss, real factors can be summed up as a decline in productivity loss. The findings of the study would urge specialists to concentrate on waste as a means of increasing overall production. 展开更多
关键词 Productivity Loss Macro-Effect Factor pile construction Regression Model SVR Model
下载PDF
Application of CFG Pile Construction Technology for Soft Foundation Treatment
12
作者 Deng Lin 《International Journal of Technology Management》 2013年第1期7-10,共4页
CFG pile has been widely applied as one of the common ground treatment techniques. As a concealed work, the construction quality of pile foundation not only relates to the success of the project, but also concerns the... CFG pile has been widely applied as one of the common ground treatment techniques. As a concealed work, the construction quality of pile foundation not only relates to the success of the project, but also concerns the benefits of thousands of hot, seholds. Only strengthening the supervision and management during the construction and strictly designing and specifying CFG pile can ensure the construction quality of CFG pile. But most researches focus on operating mechanism and theoretical analysis, and there are fewer researches about the construction of CFG pile. The real construction of CFG pile has no specified operation and lacks of the construction guidance, which not only causes great problems and has great influence on the intensity of CFG pile, but also makes the real pile body have great difference from the design requirements. Therefore, the study on construction of CFG pile in the paper has great significance. 展开更多
关键词 CFG pile soft foundation treatment reinforcement mechanism construction technology quality control
下载PDF
Analysis on Pore-Forming Pouring Pile Construction Technology of House Building Project
13
作者 Lili Hu 《Open Journal of Civil Engineering》 2016年第4期697-703,共8页
Compared with the in-place pile, the pore-forming pouring pile is more simple and convenient, with a wider range of construction. In the actual construction process, it is able to pass through complex bottom layer and... Compared with the in-place pile, the pore-forming pouring pile is more simple and convenient, with a wider range of construction. In the actual construction process, it is able to pass through complex bottom layer and water layer underground without very high requirements in equipment. The actual bearing capacity of single pile is very strong, so that it can be better to adapt to the actual needs of different scales or the different geological conditions in building. And it has been promoted and used greatly in building construction work [1]. This paper introduces the concept of the pore-forming pouring pile technology, analyzes the pore-forming construction technology and the pile construction technology, then talks about prevention problems of the pore-forming pouring pile construction in House Building Project, at last draws a conclusion that the pore-forming pouring pile technology is the most basic construction technology and is the most effective and convenient way of construction. 展开更多
关键词 Building construction Pore-Forming Pouring pile Normal Circulation Rotary Drilling Holes Forming Technology
下载PDF
Quality Control Measures of Bored Pile in Bridge Construction
14
作者 Lin Nan Guangjun Li +3 位作者 Yan Liu Xu Meng Yingying Ye Zhongyang Sun 《Journal of World Architecture》 2023年第2期47-52,共6页
In order to improve the quality of bored piles in bridge construction and ensure the overall quality of the bridge,we analyzed a series of problems in the construction process of bored piles,then propose corresponding... In order to improve the quality of bored piles in bridge construction and ensure the overall quality of the bridge,we analyzed a series of problems in the construction process of bored piles,then propose corresponding quality control measures,in hopes of improving quality control of bored piles in bridge construction in our country. 展开更多
关键词 Bridge construction Bored pile Quality control
下载PDF
Construction Technology of Deep Foundation Pit Support in Municipal Civil Engineering Foundation Construction
15
作者 Jun Huang 《Journal of Architectural Research and Development》 2023年第5期20-26,共7页
Municipal civil engineering is the key content of municipal construction,and the construction scale is usually large.The quality of the project plays an important role in the development of urban economy.Due to the ra... Municipal civil engineering is the key content of municipal construction,and the construction scale is usually large.The quality of the project plays an important role in the development of urban economy.Due to the rapid increase of high-rise buildings,skyscrapers and underground buildings,the construction technology of deep foundation pit support has gradually become an indispensable construction technology.Therefore,the selection of foundation pit support construction technology is crucial in ensuring that whether the foundation is firm and stable,and whether the subsequent construction activities can be carried out smoothly.In view of this,the article discusses the application of deep foundation pit support construction technology in municipal civil engineering,aiming to provide reference for subsequent projects. 展开更多
关键词 Deep foundation pit support Civil engineering Foundation construction Concrete pouring pile technology Row pile support technology
下载PDF
Advanced Sheet Pile Curtain Design: Case Study of Cotonou East Corniche
16
作者 Peace Sèna Hounkpe Guy Oyéniran Adéoti +1 位作者 Patrick Oniakitan Mondoté Éric Adéchina Alamou 《Open Journal of Civil Engineering》 2024年第1期38-64,共27页
This paper delves into the critical aspects of sheet pile walls in civil engineering, highlighting their versatility in soil protection, retention, and waterproofing, all while emphasizing sustainability and efficient... This paper delves into the critical aspects of sheet pile walls in civil engineering, highlighting their versatility in soil protection, retention, and waterproofing, all while emphasizing sustainability and efficient construction practices. The paper explores two fundamental approaches to sheet pile design: limit equilibrium methods and numerical techniques, with a particular focus on finite element analysis. Utilizing the robust PLAXIS 2016 calculation code based on the finite element method and employing a simplified elastoplastic model (Mohr-Coulomb), this study meticulously models the interaction between sheet pile walls and surrounding soil. The research offers valuable insights into settlement and deformation patterns that adjacent buildings may experience during various construction phases. The central objective of this paper is to present the study’s findings and recommend potential mitigation measures for settlement effects on nearby structures. By unraveling the intricate interplay between sheet pile wall construction and neighboring buildings, the paper equips engineers and practitioners to make informed decisions that ensure the safety and integrity of the built environment. In the context of the Cotonou East Corniche development, the study addresses the limitations of existing software, such as RIDO, in predicting settlements and deformations affecting nearby buildings due to the substantial load supported by sheet pile walls. This information gap necessitates a comprehensive study to assess potential impacts on adjacent structures and propose suitable mitigation measures. The research underscores the intricate dynamics between sheet pile wall construction and its influence on the local environment. It emphasizes the critical importance of proactive engineering and vigilant monitoring in managing and mitigating potential hazards to nearby buildings. To mitigate these risks, the paper recommends measures such as deep foundations, ground improvement techniques, and retrofitting. The findings presented in this study contribute significantly to the field of civil engineering and offer invaluable insights into the multifaceted dynamics of construction-induced settlement. The study underscores the importance of continuous evaluation and coordination between construction teams and building owners to effectively manage the impacts of sheet pile wall construction on adjacent structures. 展开更多
关键词 Sheet pile Walls and Structural Analysis Soil-Structure Interaction Modeling Structural Sustainability Cotonou East Corniche Sustainable construction Plaxis Calculation Code Settlement Mitigation
下载PDF
敏感环境下地下水池基坑围护施工技术
17
作者 苏宇 《山西建筑》 2025年第2期68-71,81,共5页
杨树浦水厂深度处理改造工程具有地质条件复杂、场地工况敏感、施工组织及环境保护要求高等特点。结合周边建筑物密集,且离运营中的文保工业建筑最近距离仅为15 m的特点,从支撑选型、回填及降水、土方开挖等方面介绍了敏感环境下地下水... 杨树浦水厂深度处理改造工程具有地质条件复杂、场地工况敏感、施工组织及环境保护要求高等特点。结合周边建筑物密集,且离运营中的文保工业建筑最近距离仅为15 m的特点,从支撑选型、回填及降水、土方开挖等方面介绍了敏感环境下地下水池处理改造基坑围护施工技术,有效地保障了重大工程的高效、安全实施,为今后类似环境下地下结构建造涉及到的基坑施工提供了借鉴和参考。 展开更多
关键词 硬咬合排桩 复杂地质 文保建筑 双C环形支撑 基坑开挖 工期高效
下载PDF
Influence of the penetration of adjacent X-section cast-in-place concrete(XCC)pile on the existing XCC pile in sand
18
作者 Peng ZHOU Jianhui XU +3 位作者 Changjie XU Guangwei CAO Jie CUP Xuanming DING 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2024年第7期557-572,共16页
A series of small-scale 1g X-section cast-in-place concrete(XCC)pile-penetration model tests were conducted to study the effects of soil density and pile geometry on the lateral responses of an existing pile and the v... A series of small-scale 1g X-section cast-in-place concrete(XCC)pile-penetration model tests were conducted to study the effects of soil density and pile geometry on the lateral responses of an existing pile and the variations in surrounding soil stress.The results showed that the bending patterns of existing XCC piles varied with penetration depth.The lateral response of the existing pile was sensitive to the change in relative density and pile geometry.For example,the bending moment of the existing pile increased along with these parameters.The development of the radial stressσ′r/σ′v0 of the soil around an existing pile showed different trends at various depths during the penetration of the adjacent pile.Moreover,the change in radial stress during the penetration of the XCC pile did not exhibit the“h/R effect”that was observed in the free-field soil,due to the shielding effect of the existing piles.The peak value of radial stressσ′r_max/σ′v0 decreased exponentially as the radial distance r/R increased.The attenuation ofσ′r_max/σ′v0 with r/R in the loose sand was faster than in the medium-dense or dense sands.Theσ′r_max/σ′v0 at the same soil location increased with the cross-section geometry parameter. 展开更多
关键词 X-section cast-in-place concrete(XCC)pile Test PENETRATION SAND Lateral response Radial stress
原文传递
京九铁路深大抗滑桩建造关键技术
19
作者 李毅 卢恩超 李鹤峰 《山西建筑》 2025年第1期112-116,共5页
以京九铁路K2038+700—K2038+800古滑坡为例,设计采用深大抗滑桩和地下疏干排水系统(集水井+环形新型排水管+集水管)的综合整治措施,为解决建造过程中可能出现的涌水突泥、护壁开裂等病害,施工时采用小导管超前注浆、滑动带护壁加强、... 以京九铁路K2038+700—K2038+800古滑坡为例,设计采用深大抗滑桩和地下疏干排水系统(集水井+环形新型排水管+集水管)的综合整治措施,为解决建造过程中可能出现的涌水突泥、护壁开裂等病害,施工时采用小导管超前注浆、滑动带护壁加强、井点降水等关键建造技术,结合建造过程中的监控量测关键技术,安全高效地完成了深大抗滑桩的建造,为铁路施工中存在类似深大抗滑桩的建造提供了可借鉴的工程经验。 展开更多
关键词 京九铁路 古滑坡 深大抗滑桩 关键建造技术 监控量测
下载PDF
洞桩法地铁车站边桩结构受力机制的模型试验设计 被引量:1
20
作者 章慧健 郑余朝 +2 位作者 刘功宁 汪波 张帅 《实验技术与管理》 CAS 北大核心 2024年第3期19-28,共10页
为了方便学生更形象地理解洞桩法地铁车站边桩结构的受力机制,该文以广州地区某洞桩法地铁车站工程为依托,设计了一种简化的洞桩法车站边桩结构模型试验。基于该试验方法,演示分析了边桩结构在洞桩法车站开挖过程中的施工力学行为规律,... 为了方便学生更形象地理解洞桩法地铁车站边桩结构的受力机制,该文以广州地区某洞桩法地铁车站工程为依托,设计了一种简化的洞桩法车站边桩结构模型试验。基于该试验方法,演示分析了边桩结构在洞桩法车站开挖过程中的施工力学行为规律,并对比研究了不同桩型布置参数下的桩后土压力、边桩结构的力学和变形规律。通过该试验,为学生展示了洞桩法边桩结构模型的设计、制作、试验具体操作及数据监测的全过程,从而让学生更好地掌握洞桩法车站边桩结构力学行为演变规律,以及采用不同边桩布置型式的力学行为差异。 展开更多
关键词 洞桩法 边桩结构 模型试验 施工力学 变形规律
下载PDF