The following article has been retracted due to the fact that it cannot be accepted by the author’s university as a scientific peer-reviewed publication. The Editorial Board takes a very strong respect to the author...The following article has been retracted due to the fact that it cannot be accepted by the author’s university as a scientific peer-reviewed publication. The Editorial Board takes a very strong respect to the author’s situation on this matter. This paper published in World Journal of Engineering and Technology Vol.2 No.3B, September 2014, has been removed from this site.展开更多
随着对电力系统可靠性要求的不断提高,以集中检修替代传统的分散检修成为趋势。220 k 楠江变电站通过个别110 kV线路带电实现负荷转供,在不损失负荷和在电网风险可控的情况下,用3天时间完成了大范围的集中检修,解决了停电时间、负荷损...随着对电力系统可靠性要求的不断提高,以集中检修替代传统的分散检修成为趋势。220 k 楠江变电站通过个别110 kV线路带电实现负荷转供,在不损失负荷和在电网风险可控的情况下,用3天时间完成了大范围的集中检修,解决了停电时间、负荷损失与检修范围间的矛盾,开辟了一种全新的集中检修模式。展开更多
文摘The following article has been retracted due to the fact that it cannot be accepted by the author’s university as a scientific peer-reviewed publication. The Editorial Board takes a very strong respect to the author’s situation on this matter. This paper published in World Journal of Engineering and Technology Vol.2 No.3B, September 2014, has been removed from this site.