Monitoring the thickness changes of channel siltation is paramount in safeguarding navigation and guiding dredging, This paper presents a novel method for realizing the field monitoring of channel siltation in real ti...Monitoring the thickness changes of channel siltation is paramount in safeguarding navigation and guiding dredging, This paper presents a novel method for realizing the field monitoring of channel siltation in real time. The method is based on the bistatic scattering theory and concerned more with the receiving and processing of multipath signal at high-frequency and small grazing angle. By use of the multipath propagation structure of underwater acoustic channel, the method obtains the silt thickness by calculating the relative time delay of acoustic signals between the direct and the shortest bottom reflected paths. Bistatic transducer pairs are employed to transmit and receive the acoustic signals, and the GPS time synchronization technology is introduced to synchronize the transmitter and receiver, The WRELAX (Weighted Fourier transforul and RELAX) algorithm is used to obtain the high resolution estimation of muhipath time delay. To examine the feasibility of the presented method and the accuracy and precision of the developed system, a series of sea trials are conducted in the southwest coast area of Dalian City, north of the Yellow Sea. The experimental results are compared with that using high-resolution dual echo sounder HydroBoxTM, and the uncertainty is smaller than + 0.06 m. Compared with the existing means for measuring the silt thickness, the present method is innovative, and the system is stable, efficient and provides a better real-time performance. It especially suits monitoring the narrow channel with rapid changes of siltation.展开更多
The channel back-siltation problem has been restricting the development of channels,and its monitoring is limited by funds and natural conditions.Moreover,predicting the channel back-siltation situation in a timely an...The channel back-siltation problem has been restricting the development of channels,and its monitoring is limited by funds and natural conditions.Moreover,predicting the channel back-siltation situation in a timely and accurate manner is difficult.Hence,a numerical simulation of the back-siltation problem in the sea area near the channel is of great significance to the maintenance of a channel.In this study,the back siltation of a deep-water channel in the Lanshan Port area of the Port of Rizhao after dredging is predicted.This paper relies on the MIKE 21 software to establish the wave,tidal current,and sediment numerical models and uses measured data from two observation stations in the study area for verification.On this basis,taking one month as an example,the entire project channel was divided into five sections,and three observation points were set on each section.The results show that the area with offshore siltation is located in the northerly direction of the artificial anti-wave building.Siltation occurred on the northern seabed in the sea a little farther from the shore.Siltation occurred on the seabed surface far away from the shoreline,and with the increase in the distance from the shoreline,the amount of siltation in the south,center,and north became gradually closed,and the results can be used to guide actual engineering practices.This study will play a positive role in promoting the dredging project of Rizhao Lanshan Port.展开更多
5. Application and Popularization of Computational Methods for Siltation The above mentioned computational method covers siltation in navigation channels andharbour basins on muddy beach. This part mainly deals with t...5. Application and Popularization of Computational Methods for Siltation The above mentioned computational method covers siltation in navigation channels andharbour basins on muddy beach. This part mainly deals with the possibility of its application tosilty beach and sandy beach and the computation of scouring. The following discussion involvestwo aspects, and then some computational examples are given.展开更多
The Xiaolangdi Hydro-Project is one of the large projects on the main stem of the Middle Yellow River. It has been operated for more than 10 years, since its impoundment in October, 1999. The reservoir has trapped 2.8...The Xiaolangdi Hydro-Project is one of the large projects on the main stem of the Middle Yellow River. It has been operated for more than 10 years, since its impoundment in October, 1999. The reservoir has trapped 2.833 × 10^9 m3 of sediment, and caused the total erosion of 1.891 × 10^9t in the Lower Yellow River from October, 1999 through October, 2010. Not only the serious atrophied situation of the Lower Yellow River (LYR) has been resuscitating, but also many new phenomena of sediment transport and behaviors of channel re-establishing are coming into being. They are illustrated and discussed in detail in this paper.展开更多
基金supported by the National Key Technology Research and Development Program of China(863 Program, Grant No.2009BAG18B03)
文摘Monitoring the thickness changes of channel siltation is paramount in safeguarding navigation and guiding dredging, This paper presents a novel method for realizing the field monitoring of channel siltation in real time. The method is based on the bistatic scattering theory and concerned more with the receiving and processing of multipath signal at high-frequency and small grazing angle. By use of the multipath propagation structure of underwater acoustic channel, the method obtains the silt thickness by calculating the relative time delay of acoustic signals between the direct and the shortest bottom reflected paths. Bistatic transducer pairs are employed to transmit and receive the acoustic signals, and the GPS time synchronization technology is introduced to synchronize the transmitter and receiver, The WRELAX (Weighted Fourier transforul and RELAX) algorithm is used to obtain the high resolution estimation of muhipath time delay. To examine the feasibility of the presented method and the accuracy and precision of the developed system, a series of sea trials are conducted in the southwest coast area of Dalian City, north of the Yellow Sea. The experimental results are compared with that using high-resolution dual echo sounder HydroBoxTM, and the uncertainty is smaller than + 0.06 m. Compared with the existing means for measuring the silt thickness, the present method is innovative, and the system is stable, efficient and provides a better real-time performance. It especially suits monitoring the narrow channel with rapid changes of siltation.
基金The study is supported by the Guangxi Key Laboratory of Marine Environmental Science,Guangxi Academy of Sciences(No.GXKLHY21-04)the Special Funds for Fun-damental Scientific Research Operation of Central Universities(No.202113011)+2 种基金the Shandong Provincial Social Science Planning Research Youth Project(No.21DSHJ2)NSFC-Shandong Joint Fund(No.U1706215)the Tian-jin Philosophy and Social Science Planning Project of China(No.TJKS20XSX-015).
文摘The channel back-siltation problem has been restricting the development of channels,and its monitoring is limited by funds and natural conditions.Moreover,predicting the channel back-siltation situation in a timely and accurate manner is difficult.Hence,a numerical simulation of the back-siltation problem in the sea area near the channel is of great significance to the maintenance of a channel.In this study,the back siltation of a deep-water channel in the Lanshan Port area of the Port of Rizhao after dredging is predicted.This paper relies on the MIKE 21 software to establish the wave,tidal current,and sediment numerical models and uses measured data from two observation stations in the study area for verification.On this basis,taking one month as an example,the entire project channel was divided into five sections,and three observation points were set on each section.The results show that the area with offshore siltation is located in the northerly direction of the artificial anti-wave building.Siltation occurred on the northern seabed in the sea a little farther from the shore.Siltation occurred on the seabed surface far away from the shoreline,and with the increase in the distance from the shoreline,the amount of siltation in the south,center,and north became gradually closed,and the results can be used to guide actual engineering practices.This study will play a positive role in promoting the dredging project of Rizhao Lanshan Port.
文摘5. Application and Popularization of Computational Methods for Siltation The above mentioned computational method covers siltation in navigation channels andharbour basins on muddy beach. This part mainly deals with the possibility of its application tosilty beach and sandy beach and the computation of scouring. The following discussion involvestwo aspects, and then some computational examples are given.
基金Project supported by the National Basic Research and Development Program of China(973Program,Grant No.2011CB409901)the"12th Five-Year Plan"to Support Science and Technology Project(Grant No.2012BAB02B01)the Special Funds for Public Welfare Project(Grant No.200901014)
文摘The Xiaolangdi Hydro-Project is one of the large projects on the main stem of the Middle Yellow River. It has been operated for more than 10 years, since its impoundment in October, 1999. The reservoir has trapped 2.833 × 10^9 m3 of sediment, and caused the total erosion of 1.891 × 10^9t in the Lower Yellow River from October, 1999 through October, 2010. Not only the serious atrophied situation of the Lower Yellow River (LYR) has been resuscitating, but also many new phenomena of sediment transport and behaviors of channel re-establishing are coming into being. They are illustrated and discussed in detail in this paper.