Given the advances in science and technology,rapid development of socialist market economy and continuous advance of urbanization,it is necessary to enlarge the scale of engineering construction.As the form of enginee...Given the advances in science and technology,rapid development of socialist market economy and continuous advance of urbanization,it is necessary to enlarge the scale of engineering construction.As the form of engineering structure becomes more complex,large-scale and high-level projects with deep foundation have appeared in engineering construction.For construction engineering,one of its technologies includes solving the difficulties in construction.It is required to deal with the safety risk of construction in time to guarantee safety construction,timely solve the management difficulties and contradictory problems of the project and ensure both the safety of engineering construction and the rationalization of the institution setting of the safety supervision on the project.展开更多
With the continuous advancement of China's urbanization process,the demand for construction projects is increasing,which is both an opportunity and a challenge for construction companies.If the enterprises themsel...With the continuous advancement of China's urbanization process,the demand for construction projects is increasing,which is both an opportunity and a challenge for construction companies.If the enterprises themselves can grasp the background and policy conditions to maintain a high level of construction engineering,then its enterprise benefits and future development prospects will be excellent.However,there are also many companies whose own reputation and actual benefits have been affected for poor engineering quality caused by poor construction management.This is exactly what we must pay attention to.This article will analyse and explore the relevant work to improve the engineering quality of different phases of engineering construction and to guide the management of the construction unit in the future from the perspective of the construction unit to strengthen the project quality supervision.展开更多
One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical e...One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical engineering and civil construction, engineering, quality control, safety management and supervision costs control, on-site supervision over the links, these links chain, indivisible, so long as a part of the management problems, will lead the entire construction project management effectiveness be affected, so it must be every link control and management work done, in order to guarantee the quality of the entire substation, in order to make security of supply substations, electrical safety and vital interests of users are protected. In this paper, the author details the three aspects substation construction management of the project, namely the concept of substation engineering, project management and construction safety, through these three aspects, the author analyzes the construction project management substation existing problems, To solve these problems and issues proposed some measures and construction process that need attention. It launched separately from the design, schedule, quality and other aspects of security and research, and in the course of the study stressed the importance of coordination between elements of construction and construction sectors as well as cooperation between the construction, explains the importance of the project cost control.展开更多
With the entrance into WTO, the Chinese supervision enterprises face the serious challenge never existed before. Comparing with other type enterprises Chinese supervision enterprises nature of China are the same as pr...With the entrance into WTO, the Chinese supervision enterprises face the serious challenge never existed before. Comparing with other type enterprises Chinese supervision enterprises nature of China are the same as project management companies in connotation and service scope in nature. They have much superiority in development of the project management work. Through comparing and analyzing the special feature between Chinese supervision enterprise and international project management enterprise, this paper points out the gap between them, and table the proposal of they transforming to the project management enterprises.展开更多
By examining a specific case of compensating for nighttime construction noise in Beijing’s construction projects,we explored how the costs of mitigating construction noise disturbance could be fairly distributed amon...By examining a specific case of compensating for nighttime construction noise in Beijing’s construction projects,we explored how the costs of mitigating construction noise disturbance could be fairly distributed among multiple construction projects near residential areas.In this process,the local government played a crucial coordinating role.According to regulations,construction units must include the costs of preventing and controlling construction noise pollution in the project cost.The construction contract should clearly specify the construction unit’s responsibility for noise pollution prevention and control.After signing the contract,the construction unit should promptly undertake relevant measures to minimize disturbances caused by nighttime construction,aiming to reduce the adverse impacts on the community and ensure the smooth progress of the construction project.展开更多
The legislative body in China is mak-ing headway to bring city planning,urbanconstruction and administration underthe supervision of the law.Soon after CityPlanning Act,the first of its kind in thefield of constructio...The legislative body in China is mak-ing headway to bring city planning,urbanconstruction and administration underthe supervision of the law.Soon after CityPlanning Act,the first of its kind in thefield of construction was put into effect inApril 1990, provinces, autonomous re-gions and municipalities directly underthe Central Government throughout thecountry drafted corresponding local lawsand regulations. In the same year,TheProvisional Regulations for the Sale展开更多
The steel structure construction is an interesting option to the already established concrete structure at a time when the Brazilian civil construction seeks more efficiency.To promote the use of this material it is n...The steel structure construction is an interesting option to the already established concrete structure at a time when the Brazilian civil construction seeks more efficiency.To promote the use of this material it is necessary to have a better understanding of its characteristics and,especially,of its possible pathologies,to avoid degradation,costs,and even the collapse of the structure.In this study Total Quality Management tools were applied to analyze the pathologies found in five medium and large steel-structured buildings.The most frequent ones were structure corrosion,cracks in the closures,and infiltrations in the interface closure/structure.The Ishikawa Diagram is used to identify the origin of the causes of pathologies and the Gravity Urgency Tendency Matrix(GUT Matrix)is used in the risk analysis of each pathology.The results obtained show that it is possible,through these Quality Management tools,to understand the origin of the pathologies,establishing their dangerousness and the degree of risk each one offers.展开更多
文摘Given the advances in science and technology,rapid development of socialist market economy and continuous advance of urbanization,it is necessary to enlarge the scale of engineering construction.As the form of engineering structure becomes more complex,large-scale and high-level projects with deep foundation have appeared in engineering construction.For construction engineering,one of its technologies includes solving the difficulties in construction.It is required to deal with the safety risk of construction in time to guarantee safety construction,timely solve the management difficulties and contradictory problems of the project and ensure both the safety of engineering construction and the rationalization of the institution setting of the safety supervision on the project.
文摘With the continuous advancement of China's urbanization process,the demand for construction projects is increasing,which is both an opportunity and a challenge for construction companies.If the enterprises themselves can grasp the background and policy conditions to maintain a high level of construction engineering,then its enterprise benefits and future development prospects will be excellent.However,there are also many companies whose own reputation and actual benefits have been affected for poor engineering quality caused by poor construction management.This is exactly what we must pay attention to.This article will analyse and explore the relevant work to improve the engineering quality of different phases of engineering construction and to guide the management of the construction unit in the future from the perspective of the construction unit to strengthen the project quality supervision.
文摘One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical engineering and civil construction, engineering, quality control, safety management and supervision costs control, on-site supervision over the links, these links chain, indivisible, so long as a part of the management problems, will lead the entire construction project management effectiveness be affected, so it must be every link control and management work done, in order to guarantee the quality of the entire substation, in order to make security of supply substations, electrical safety and vital interests of users are protected. In this paper, the author details the three aspects substation construction management of the project, namely the concept of substation engineering, project management and construction safety, through these three aspects, the author analyzes the construction project management substation existing problems, To solve these problems and issues proposed some measures and construction process that need attention. It launched separately from the design, schedule, quality and other aspects of security and research, and in the course of the study stressed the importance of coordination between elements of construction and construction sectors as well as cooperation between the construction, explains the importance of the project cost control.
文摘With the entrance into WTO, the Chinese supervision enterprises face the serious challenge never existed before. Comparing with other type enterprises Chinese supervision enterprises nature of China are the same as project management companies in connotation and service scope in nature. They have much superiority in development of the project management work. Through comparing and analyzing the special feature between Chinese supervision enterprise and international project management enterprise, this paper points out the gap between them, and table the proposal of they transforming to the project management enterprises.
文摘By examining a specific case of compensating for nighttime construction noise in Beijing’s construction projects,we explored how the costs of mitigating construction noise disturbance could be fairly distributed among multiple construction projects near residential areas.In this process,the local government played a crucial coordinating role.According to regulations,construction units must include the costs of preventing and controlling construction noise pollution in the project cost.The construction contract should clearly specify the construction unit’s responsibility for noise pollution prevention and control.After signing the contract,the construction unit should promptly undertake relevant measures to minimize disturbances caused by nighttime construction,aiming to reduce the adverse impacts on the community and ensure the smooth progress of the construction project.
文摘The legislative body in China is mak-ing headway to bring city planning,urbanconstruction and administration underthe supervision of the law.Soon after CityPlanning Act,the first of its kind in thefield of construction was put into effect inApril 1990, provinces, autonomous re-gions and municipalities directly underthe Central Government throughout thecountry drafted corresponding local lawsand regulations. In the same year,TheProvisional Regulations for the Sale
文摘The steel structure construction is an interesting option to the already established concrete structure at a time when the Brazilian civil construction seeks more efficiency.To promote the use of this material it is necessary to have a better understanding of its characteristics and,especially,of its possible pathologies,to avoid degradation,costs,and even the collapse of the structure.In this study Total Quality Management tools were applied to analyze the pathologies found in five medium and large steel-structured buildings.The most frequent ones were structure corrosion,cracks in the closures,and infiltrations in the interface closure/structure.The Ishikawa Diagram is used to identify the origin of the causes of pathologies and the Gravity Urgency Tendency Matrix(GUT Matrix)is used in the risk analysis of each pathology.The results obtained show that it is possible,through these Quality Management tools,to understand the origin of the pathologies,establishing their dangerousness and the degree of risk each one offers.