[Objective] The aim was to analyze physical structures of mixed cloud in autumn in Shandong.[Method] By dint of Doppler radar data,the raindrop spectrum data observed by laser spectrometer,second sounding data of L-ba...[Objective] The aim was to analyze physical structures of mixed cloud in autumn in Shandong.[Method] By dint of Doppler radar data,the raindrop spectrum data observed by laser spectrometer,second sounding data of L-band,satellite retrieval data,and other general information,the physical structures of mixed cloud in autumn on August 29,2009 were discussed.[Result] This was a typical precipitation process of mixed cloud,and the main precipitation process lasted for 10 hours.Rainfall intensity was ups and downs obviously with the time.The maximum rainfall intensity was 6.5 mm/h and the normal of that was less than 3.0 mm/h.The rain concentrations were between 5 and 300,and the raindrop spectrum was mainly of bimodal or multimodal peaks.It showed that the precipitating cloud was mainly cold cloud and the development of warm layers was not well according to the vertical structure of clouds which was analyzed by second sounding data.It showed by the Doppler radar data that the whole precipitation process was divided into four stages:prior period and initial,maturing,declining stages for precipitation,which the echo structure of different stages was quite different.[Conclusion] The study laid theoretical basis for the study on precipitation mechanism and artificial precipitation potential.展开更多
基金Supported by National Science and Technology Support Program (2006BAC12B07,2006BAC12B02)Shandong Meteorological Bureau Meteorological Insurance Service Program for 11th National Games (qyhqx14)
文摘[Objective] The aim was to analyze physical structures of mixed cloud in autumn in Shandong.[Method] By dint of Doppler radar data,the raindrop spectrum data observed by laser spectrometer,second sounding data of L-band,satellite retrieval data,and other general information,the physical structures of mixed cloud in autumn on August 29,2009 were discussed.[Result] This was a typical precipitation process of mixed cloud,and the main precipitation process lasted for 10 hours.Rainfall intensity was ups and downs obviously with the time.The maximum rainfall intensity was 6.5 mm/h and the normal of that was less than 3.0 mm/h.The rain concentrations were between 5 and 300,and the raindrop spectrum was mainly of bimodal or multimodal peaks.It showed that the precipitating cloud was mainly cold cloud and the development of warm layers was not well according to the vertical structure of clouds which was analyzed by second sounding data.It showed by the Doppler radar data that the whole precipitation process was divided into four stages:prior period and initial,maturing,declining stages for precipitation,which the echo structure of different stages was quite different.[Conclusion] The study laid theoretical basis for the study on precipitation mechanism and artificial precipitation potential.