A composite control scheme consisting of modepredictive control (MPC) and disturbance observer (DOB) iproposed to solve the control performance degradationproblem of the turbidity of the treated water in the prese...A composite control scheme consisting of modepredictive control (MPC) and disturbance observer (DOB) iproposed to solve the control performance degradationproblem of the turbidity of the treated water in the presence osignificant changes in raw water quality, water flow rate andinternal model mismatch disturbances. The MPC is employedas a feedback controller for the coagulation process with alarge time delay. The DOB is adopted to estimate the severedisturbances in the turbidity control, such as large changes inraw water quality and water flow rate. The estimated valuesare applied for feed-forward compensation to rejecdisturbances. Finally, the disturbance rejection performancesfor step disturbances and time-varying disturbances in thenominal case and model mismatch case are tested. Thesimulation results illustrate that, compared with the MPCmethod, the proposed method can significantly improve thedisturbance rejection performance in the turbidity control othe treated water, no matter if in the presence of externadisturbances or internal model mismatch disturbances.展开更多
Basing on a viewpoint of all sided water producing system,a comprehensive analysis of the operation status and the relationship between each working unit in water producing system,including coagulation,sedimentation...Basing on a viewpoint of all sided water producing system,a comprehensive analysis of the operation status and the relationship between each working unit in water producing system,including coagulation,sedimentation and filtration etc.was made.By investigating the influence of backwashing consumption,the amount of sludge ejected from sedimentation tank and coagulant ratio upon the cost,the cost effective function of the system was presented.Afterwards,the solution was found out and the corresponding computer program was developed.When applied with real world data,it proved that this method significantly reduced the water producing cost.展开更多
基金The National Natural Science Foundation of China(No.61504027)the Natural Science Foundation of Jiangsu Province(No.BK20140647)the Priority Academic Program Development of Jiangsu Higher Education Institutions
文摘A composite control scheme consisting of modepredictive control (MPC) and disturbance observer (DOB) iproposed to solve the control performance degradationproblem of the turbidity of the treated water in the presence osignificant changes in raw water quality, water flow rate andinternal model mismatch disturbances. The MPC is employedas a feedback controller for the coagulation process with alarge time delay. The DOB is adopted to estimate the severedisturbances in the turbidity control, such as large changes inraw water quality and water flow rate. The estimated valuesare applied for feed-forward compensation to rejecdisturbances. Finally, the disturbance rejection performancesfor step disturbances and time-varying disturbances in thenominal case and model mismatch case are tested. Thesimulation results illustrate that, compared with the MPCmethod, the proposed method can significantly improve thedisturbance rejection performance in the turbidity control othe treated water, no matter if in the presence of externadisturbances or internal model mismatch disturbances.
文摘Basing on a viewpoint of all sided water producing system,a comprehensive analysis of the operation status and the relationship between each working unit in water producing system,including coagulation,sedimentation and filtration etc.was made.By investigating the influence of backwashing consumption,the amount of sludge ejected from sedimentation tank and coagulant ratio upon the cost,the cost effective function of the system was presented.Afterwards,the solution was found out and the corresponding computer program was developed.When applied with real world data,it proved that this method significantly reduced the water producing cost.