Opencast coal mining has a large impact on the land surface,both at the mining pits themselves and at waste sites.After artifcial management is stopped,a reclaimed opencast coal mine dump is afected by wind and water ...Opencast coal mining has a large impact on the land surface,both at the mining pits themselves and at waste sites.After artifcial management is stopped,a reclaimed opencast coal mine dump is afected by wind and water erosion from natural processes,resulting in land degradation and even safety incidents.In this paper,the soil erosion and land degradation after 5 years of such natural processes,at the Xilinhot opencast coal mine dump in Inner Mongolia,were investigated.A multisource data acquisition method was applied:the vegetation fraction coverage(VFC)was extracted from GF-1 satellite imagery,high-precision terrain characteristics and the location and degree of soil erosion were obtained using a drone,and the physical properties of the topsoil were obtained by feld sampling.On this basis,the degree and spatial distribution of erosion cracks were identifed,and the causes of soil erosion and land degradation were analyzed using the geographical detector.The results show that(1)multi-source data acquisition method can provide efective basic data for the quantitative evaluation of the ecological environment at dumps,and(2)slope aspect and VFC are the main factors afecting the degree of degradation and soil erosion.Based on above analysis,several countermeasures are proposed to mitigate land degradation:(1)The windward slope be designed to imitate the natural landform.(2)Reasonable engineering measures should be applied at the slope to restrain soil erosion.(3)The Pioneer plants should be widely planted on the platform at the early stage of reclamation.展开更多
In next two years, the current waste dump of Narynsukhait coal mine is predicted insufficient to accommodate the overburden as limited of the waste dump capacity. Thus, redesigning waste dump is paramount to increase ...In next two years, the current waste dump of Narynsukhait coal mine is predicted insufficient to accommodate the overburden as limited of the waste dump capacity. Thus, redesigning waste dump is paramount to increase capacity of the dump in future. This paper describes current condition of waste dump of Narynsukhait coal mine and then discusses the optimization of waste dump geometry by analyzing the effect of different waste dump’s bench configuration on slope performance. Optimization of the geometry is carried out by investigating and comparing the performance of geometrical combinations of bench height, bench angles and number of safety berm by means of numerical modeling. The model shows that increasing height of bench is able to induce shear stress in the bench and may initiate bench instable. However, the shear stress can be limited by having safety berm and/or reducing bench angle to satisfy the stability criteria.展开更多
Berau Basin, a sub-basin of Tarakan Basin, had been developed during Eocene to Miocene period. Rocks in Berau Basin consist of sedimentary, volcanic and igneous rocks aged from Pre-tertiary until Quaternary epoch. The...Berau Basin, a sub-basin of Tarakan Basin, had been developed during Eocene to Miocene period. Rocks in Berau Basin consist of sedimentary, volcanic and igneous rocks aged from Pre-tertiary until Quaternary epoch. The youngest identified rock formation was alluvial deposit consists of mud, silt, sand, gravel and swamp with brown to dark color. This youngest rock formation is relatively weak geological condition and can cause problems in the coal mining operation. PT Berau Coal as one of the coal mining companies in Berau Basin area had experienced some problems related to the occurrence of alluvial deposit. A large failure has occurred at one of its out pit dumping?area which lies over the swamp material. The failure caused a higher operating cost since it made that the distance for waste rock dumping became to be farther than the designated area. Therefore, in order to prevent similar failure occurring at dumping area which lies above swamp material, an improvement of dumping site stability on weak geological condition has to be needed. The proposed method for improving the stability of out pit dumping area in weak geological condition is to construct the compacted layer of waste rock before the out pit dumping area construction. Based on experimental results, a minimum of 40 kPa pressure is needed to give a proper compaction to the waste rock. The result of numerical analysis by Finite Element Method (FEM) shows that construction of compacted layer on the base of out pit dumping area can improve its stability.展开更多
基金supported by the National Key R&D Program of China(Grant No.2016YFC0501103)the National Natural Science Foundation of China[Grant No.420701250].
文摘Opencast coal mining has a large impact on the land surface,both at the mining pits themselves and at waste sites.After artifcial management is stopped,a reclaimed opencast coal mine dump is afected by wind and water erosion from natural processes,resulting in land degradation and even safety incidents.In this paper,the soil erosion and land degradation after 5 years of such natural processes,at the Xilinhot opencast coal mine dump in Inner Mongolia,were investigated.A multisource data acquisition method was applied:the vegetation fraction coverage(VFC)was extracted from GF-1 satellite imagery,high-precision terrain characteristics and the location and degree of soil erosion were obtained using a drone,and the physical properties of the topsoil were obtained by feld sampling.On this basis,the degree and spatial distribution of erosion cracks were identifed,and the causes of soil erosion and land degradation were analyzed using the geographical detector.The results show that(1)multi-source data acquisition method can provide efective basic data for the quantitative evaluation of the ecological environment at dumps,and(2)slope aspect and VFC are the main factors afecting the degree of degradation and soil erosion.Based on above analysis,several countermeasures are proposed to mitigate land degradation:(1)The windward slope be designed to imitate the natural landform.(2)Reasonable engineering measures should be applied at the slope to restrain soil erosion.(3)The Pioneer plants should be widely planted on the platform at the early stage of reclamation.
文摘In next two years, the current waste dump of Narynsukhait coal mine is predicted insufficient to accommodate the overburden as limited of the waste dump capacity. Thus, redesigning waste dump is paramount to increase capacity of the dump in future. This paper describes current condition of waste dump of Narynsukhait coal mine and then discusses the optimization of waste dump geometry by analyzing the effect of different waste dump’s bench configuration on slope performance. Optimization of the geometry is carried out by investigating and comparing the performance of geometrical combinations of bench height, bench angles and number of safety berm by means of numerical modeling. The model shows that increasing height of bench is able to induce shear stress in the bench and may initiate bench instable. However, the shear stress can be limited by having safety berm and/or reducing bench angle to satisfy the stability criteria.
文摘Berau Basin, a sub-basin of Tarakan Basin, had been developed during Eocene to Miocene period. Rocks in Berau Basin consist of sedimentary, volcanic and igneous rocks aged from Pre-tertiary until Quaternary epoch. The youngest identified rock formation was alluvial deposit consists of mud, silt, sand, gravel and swamp with brown to dark color. This youngest rock formation is relatively weak geological condition and can cause problems in the coal mining operation. PT Berau Coal as one of the coal mining companies in Berau Basin area had experienced some problems related to the occurrence of alluvial deposit. A large failure has occurred at one of its out pit dumping?area which lies over the swamp material. The failure caused a higher operating cost since it made that the distance for waste rock dumping became to be farther than the designated area. Therefore, in order to prevent similar failure occurring at dumping area which lies above swamp material, an improvement of dumping site stability on weak geological condition has to be needed. The proposed method for improving the stability of out pit dumping area in weak geological condition is to construct the compacted layer of waste rock before the out pit dumping area construction. Based on experimental results, a minimum of 40 kPa pressure is needed to give a proper compaction to the waste rock. The result of numerical analysis by Finite Element Method (FEM) shows that construction of compacted layer on the base of out pit dumping area can improve its stability.