The instability of trapezoidal Ⅰ-steel support is analysed for the compound roof of main coal seam in Shaqu Colliery, and the mechanism of bolt supporting is studied. A scheme of bolt supporting has been given and pu...The instability of trapezoidal Ⅰ-steel support is analysed for the compound roof of main coal seam in Shaqu Colliery, and the mechanism of bolt supporting is studied. A scheme of bolt supporting has been given and put into practice, remarkable technical and economic benefits have been got.展开更多
通过对复合顶板特性分析,给出管理复合顶板的有效措施;并针对开滦集团吕家坨煤矿复合顶板工作面开采遇到的具体问题,给出复合顶板工作面液压支架选型依据,研发设计了1.5 m中心距8 000 k N高工阻液压支架,提高了工作面支护强度,防止了复...通过对复合顶板特性分析,给出管理复合顶板的有效措施;并针对开滦集团吕家坨煤矿复合顶板工作面开采遇到的具体问题,给出复合顶板工作面液压支架选型依据,研发设计了1.5 m中心距8 000 k N高工阻液压支架,提高了工作面支护强度,防止了复合顶板工作面架前冒顶,保证了矿井安全高效生产。展开更多
文摘The instability of trapezoidal Ⅰ-steel support is analysed for the compound roof of main coal seam in Shaqu Colliery, and the mechanism of bolt supporting is studied. A scheme of bolt supporting has been given and put into practice, remarkable technical and economic benefits have been got.