期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Study of Residual Basin and Tectonolayering Based on Airborne Gravity and Magnetic Data 被引量:6
1
作者 LI Wenyong ZHOU Jianxin +2 位作者 XIONG Shengqing LIU Yanxu XU Jianchun 《Acta Geologica Sinica(English Edition)》 SCIE CAS CSCD 2013年第4期1137-1153,共17页
This paper takes the South Yellow Sea as an example to show a new method for comprehensive geological-geophysical research such as residual basin and tectonolayering using airborne gravity and magnetic data in China. ... This paper takes the South Yellow Sea as an example to show a new method for comprehensive geological-geophysical research such as residual basin and tectonolayering using airborne gravity and magnetic data in China. Based on airborne gravity and magnetic data, by measuring and analyzing stratigraphic density and susceptibility, the depths to the pre-Sinian magnetic basement top, the pre-Jurassic top and the Cenozoic bottom, are obtained by forward and inverse methods constrained by seismic and drilling data; and furthermore, the residual thicknesses of the Sinian-Triassic, the Jurassic-Cretaceous and the Cenozoic are calculated. Based on airborne gravity and magnetic anomalies, the faults in the pre-Sinian magnetic basement, the Jurassic-Cretaceous and the Cenozoic are respectively interpreted by the qualitative and quantitative methods. On the basis of the above study, and combining regional important tectonic events, four tectonolayers are divided in the vertical succession in South Yellow Sea, namely the pre-Sinian magnetic basement, the Sinian-Triassic, the Jurassic-Cretaceous and the Cenozoic. The result shows that there are thick Cenozoic and Jurassic-Cretaceous strata and thin residual Sinian-Triassic strata in the Suzhong-Huangnan depression area, but there are thin or only sporadic Mesozoic-Cenozoic terrestrial strata and thick Sinian-Triassic marine strata reserved in Subei-Huangzhong uplift area and Sunan-Wunansha uplift area. The four tectonolayers are very different in structures as well as distributions in plane. 展开更多
关键词 airborne gravity and magnetics comprehensive interpretation residual basin tectonolayering South Yellow Sea
下载PDF
Post-evaluation of a water pollution control plan: methodology and case study 被引量:1
2
作者 Lin ZENG Xin DONG Siyu ZENG Tianzhu ZHANG Jing LI Jining CHEN 《Frontiers of Environmental Science & Engineering》 SCIE EI CAS CSCD 2015年第4期712-724,共13页
China has developed more than 20 water pollution control plans for river basins (RBWPs) since 1996. However, the implementation has generally lagged. This paper proposes a three-step, post-evaluation methodology to ... China has developed more than 20 water pollution control plans for river basins (RBWPs) since 1996. However, the implementation has generally lagged. This paper proposes a three-step, post-evaluation methodology to analyze the implementation result of a RBWP and its influential factors. First, a multi-attribute evaluation method based on an index system is established to score the enforcement results of a RBWP. Indicators measure how well a RBWP has achieved its objectives, which include water quality compliance, pollution load control, project construction, financial inputs, and related management requirements. Second, an interpretive structural model is used to detect the significant factors that affect RBWP implementation. This model can effectively analyze the cause-effect chain and hierarchical relationship among variables. Five groups of factors were identified, namely, plan preparation, water resource endowment, policy, institution, and management. Both qualitative and quantitative methods are employed in the third step to evaluate the extent to which these factors have influenced the execution result of a RBWP, including pre-post contrast, scenario analysis, and correlation analysis. This research then post-evaluated the implementation of the Huai River Basin water pollution control plans (H-RBWPs) over a period of 10 years as a case study. Results showed that the implementation of the H-RBWPs was unsatisfactory during 2001–2005, although it improved during 2006–2010. The poor execution of these plans was partially caused by the underestimation of regional economic development in combination with ineffective industrial structure adjustment policies. Therefore, this case study demonstrates the feasibility and flexibility of the proposed post-evaluation methodology. 展开更多
关键词 river basin water pollution control plan postplan evaluation multi-attribute comprehensive evaluation interpretive structural model combined qualitative/quantitative method
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部