With the development of the integration of production and education,chemical engineering and technology education is facing many new challenges and opportunities.The construction of a chemical virtual simulation pract...With the development of the integration of production and education,chemical engineering and technology education is facing many new challenges and opportunities.The construction of a chemical virtual simulation practice teaching system under the background of integration of production and education aims to improve students’learning efficiency and innovation ability with the help of virtual simulation technology,so as to meet the needs of future industrial development.This paper discusses the significance of the construction of the system,analyzes the difficulties and challenges that may be encountered in the construction process,and evaluates the effective strategies to strengthen the construction of the system.Through the introduction of virtual simulation technology,students can improve their practical skills and innovation ability,and better adapt to the development needs of industrialization and informatization.展开更多
To improve the design and management of an integrated production system(IPS),a set of mathematical models and workflows are developed for evaluating the capacity of an IPS at steady-state conditions.Combining the cons...To improve the design and management of an integrated production system(IPS),a set of mathematical models and workflows are developed for evaluating the capacity of an IPS at steady-state conditions.Combining the conservation laws with applicable multiphase fluid and choke models,these mathematical models are solved to characterize the hydraulics of an integrated system of reservoir,wells,chokes,flowlines,and separator at steady state.The controllable variables such as well count,choke size and separator pressure are adjusted to optimize the performance of the IPs at a specific time.It is found that increasing the well count can increase the bulk flow rate of the production network,but too many wells may increase the manifold pressure,leading to decline of single-well production.Increasing the choke size can improve the capacity of the IPs.The production of the IPs is negatively correlated with the separator pressure.With increasing separator pressure and decreasing choke size,the increment of total fluid production(the capacity of IPS)induced by increasing well count decreases.Validation tests with field examples show a maximum absolute deviation is 1.5%,demonstrating the robustness and validity of the proposed mathematical models and workflows.展开更多
According to the Annex Technical Regulations for Integrated Curriculum Development(Trial)in Document No.30 of the General Office of the Ministry of Human Resources and Social Security(2012),this paper studies the form...According to the Annex Technical Regulations for Integrated Curriculum Development(Trial)in Document No.30 of the General Office of the Ministry of Human Resources and Social Security(2012),this paper studies the formulation of the curriculum standards for the integration of Chinese medicinal materials production.We focus on the formulation ideas of the curriculum standards for the integration of Chinese medicinal materials production,the formulation process of the curriculum standards for the integration of Chinese medicinal materials production,including the description of typical work tasks,the determination of curriculum objectives,the analysis of study content,the description of referential study tasks,teaching implementation suggestions,assessment and evaluation suggestions,which can provide a reference for the development and research of other related integrated courses.展开更多
Nature reserves play a significant role in providing ecosystem services and are key sites for biodiversity conservation.The Tianchi Bogda Peak Natural Reserve(TBPNR),located in Xinjiang Uygur Autonomous Region,China,i...Nature reserves play a significant role in providing ecosystem services and are key sites for biodiversity conservation.The Tianchi Bogda Peak Natural Reserve(TBPNR),located in Xinjiang Uygur Autonomous Region,China,is an important ecological barrier area in the temperate arid zone.The evaluation of its important ecosystem services is of great significance to improve the management level and ecological protection efficiency of the reserve.In the present study,we assessed the spatiotemporal variations of four ecosystem services(including net primary productivity(NPP),water yield,soil conservation,and habitat quality)in the TBPNR from 2000 to 2020 based on the environmental and social data using the Integrated Valuation of Ecosystem Services and Trade-offs(InVEST)model.In addition,the coldspot and hotspot areas of ecosystem services were identified by hotspot analysis,and the trade-off and synergistic relationships between ecosystem services were analyzed using factor analysis in a geographic detector.During the study period,NPP and soil conservation values in the reserve increased by 48.20%and 25.56%,respectively;conversely,water yield decreased by 16.56%,and there was no significant change in habitat quality.Spatially,both NPP and habitat quality values were higher in the northern part and lower in the southern part,whereas water yield showed an opposite trend.Correlation analysis revealed that NPP showed a synergistic relationship with habitat quality and soil conservation,and exhibited a trade-off relationship with water yield.Water yield and habitat quality also had a trade-off relationship.NPP and habitat quality were affected by annual average temperature and Normalized Difference Vegetation Index(NDVI),respectively,while water yield and soil conservation were more affected by digital elevation model(DEM).Therefore,attention should be paid to the spatial distribution and dynamics of trade-off and synergistic relationships between ecosystem services in future ecological management.The findings of the present study provide a reference that could facilitate the sustainable utilization of ecosystem services in the typical fragile areas of Northwest China.展开更多
Based on the analysis of the development process system status of domestic and foreign civil aircraft airborne system suppliers,this paper proposes the overall construction idea of"a set of civil aircraft process...Based on the analysis of the development process system status of domestic and foreign civil aircraft airborne system suppliers,this paper proposes the overall construction idea of"a set of civil aircraft process system"based on IPD(Integrated product development)in the organization.The development stage,process,activity and task are the logical framework elements of the system construction."Based on process decomposition,vertical stratification,horizontal segmentation,combination of special and common,process customized to tools,role and process integration,giving full consideration to the interface between supplier management and process modules"etc.are the concrete ideas.Moreover,formulate top⁃level system construction standards,implemented by process system management tool platform,so that the process system and development work can be effectively integrated to effectively guide the development work of airborne system suppliers,and meet the quality and airworthiness requirements of civil aircraft development.Through the development application of a certain type of flight control system,the process system and tool platform were verified and optimized in practice.展开更多
Heilongjiang Province is an important marketable grain depot in China. Since the reform and opening up, Heilongjiang Province production capacity of foodstuff is increasingly growing into a new level. This paper start...Heilongjiang Province is an important marketable grain depot in China. Since the reform and opening up, Heilongjiang Province production capacity of foodstuff is increasingly growing into a new level. This paper started with the actuality of Heilongjiang Province integrated production capacity of foodstuff, and analyzed its major factors empirically through the mathematical model, then proposed some measures to enhance Heilongjiang Province production capacity of foodstuff which ensured China foodstuff security展开更多
This research attempts to devise a multistage and multiproduct short-term integrative production plan that can dynamically change based on the order priority and virtual occupancy for application in steel plants. Cons...This research attempts to devise a multistage and multiproduct short-term integrative production plan that can dynamically change based on the order priority and virtual occupancy for application in steel plants. Considering factors such as the delivery time, varietal compatibility between different products, production capacity of variety per hour, minimum or maximum batch size, and transfer time, we propose an available production capacity network with varietal compatibility and virtual occupancy for enhancing production plan implementation and quick adjustment in the case of dynamic production changes. Here available means the remaining production capacity after virtual occupancy.To quickly build an available production capacity network and increase the speed of algorithm solving, constraint selection and cutting methods with order priority were used for model solving. Finally, the genetic algorithm improved with local search was used to optimize the proposed production plan and significantly reduce the order delay rate. The validity of the proposed model and algorithm was numerically verified by simulating actual production practices. The simulation results demonstrate that the model and improved algorithm result in an effective production plan.展开更多
The spatial and temporal distributions of new production vary largely in different sea areas. To understand the level of new production in the sea area studied better, an estimate of new production must be obtained in...The spatial and temporal distributions of new production vary largely in different sea areas. To understand the level of new production in the sea area studied better, an estimate of new production must be obtained in large spatial and temporal scales. The ~234Th/ ~238U disequilibrium is an effective method for the study of new production. Two sampling strategies, vertically integrated sampling ap proach based on trapezoidal integration principle and discrete layer sampling approach, were compared in the studies of the xiamen Bay and the northern South China Sea. The scavenging fluxes and removal fluxes of ~234Th and the residence times for dissolved and particulate ~234Th were calculated. The coinci dent results from two Sampling approach suggest that vertically integrated sampling approach is not only effective and reliable, but also significantly reduces the number and volume of samples. It allows us to study new production by ba ^(234)Th - ^(238)U disequilibria in large spatial scale.展开更多
The fundamental task of well-facilitated farmland construction is to continuously lift the integrated production capacity. External project construction for well-facilitated farmland can not completely solve existing ...The fundamental task of well-facilitated farmland construction is to continuously lift the integrated production capacity. External project construction for well-facilitated farmland can not completely solve existing problems in improvement of intrinsic quality of farmland.Based on research findings of integrated production capacity of farmland,starting from basic elements such as water,soil,seed,fertilizer,and pesticide,this paper introduced factors influencing the integrated production capacity of well-facilitated farmland,including natural quality of farmland,supporting infrastructure,agricultural technology level and management level,and labor quality. Besides,it establish an evaluation system for integrated production capacity of well-facilitated farmland in Jiangsu Province by Analytic Hierarchy Process( AHP),and made an empirical study using indicator data of 2010- 2014. Results indicated that the general index of integrated production capacity of farmland in Jiangsu Province in 2010- 2014 was ascending,reflecting improvement of integrated production capacity of farmland. With the aid of radar map,it further found that the coupling between water,soil,seed,fertilizer,and pesticide and other elements play a crucial role in lifting the integrated production capacity of farmland. Finally,based on existing problems in construction of well-facilitated farmland in Jiangsu Province,it came up with some pertinent recommendations from the perspective of coordinated development of all elements.展开更多
This paper addresses some key issues in supporting product family design in a 3 D CAD/ PDM integrated system and introduces the techniques developed or adopted in building the integrated system. The general architectu...This paper addresses some key issues in supporting product family design in a 3 D CAD/ PDM integrated system and introduces the techniques developed or adopted in building the integrated system. The general architecture of a 3D CAD/PDM integrated system is organized as five tiers. Multi-agent technology is applied with a collaborative design environment. The rule-based product family architecture ( PFA ) and tabular layouts of article characteristics (TLAC) technique are applied to represent the knowledge for product families. They make the knowledge understandable, simplified and can be exchanged among heterogeneous information systems. A transparently concentric integrated mode is put forward to enable the heterogeneous processes to interact and communicate regardless of the language used to construct each process. With the mode, function calling and information exchanging among different processes are carried out via message translation/parse approach. Currently, the integrated system is implemented in the platform of Windows NT and 2000.展开更多
Hong Kong knitwear manufacturers were among the pioneers to invest in the Pearl River Delta region of Guang-dong,China.Owing to limitations on technological levelat the time of the initial investments,the content of p...Hong Kong knitwear manufacturers were among the pioneers to invest in the Pearl River Delta region of Guang-dong,China.Owing to limitations on technological levelat the time of the initial investments,the content of pro-duction-sharing for the Inland in China were basically of simple technology and labour intensive in nature.Through venturing hardships,the investment has been able to boost the economy of Guangdong and foster close trade relationship,especially in outward processing trade,By now,the co-operative production展开更多
The necessi ty of product oriented integrated computer aided process planning (CAPP) is analy zed, and the system architecture and the main functions are described in detail. The key issues of the system, such as the ...The necessi ty of product oriented integrated computer aided process planning (CAPP) is analy zed, and the system architecture and the main functions are described in detail. The key issues of the system, such as the product oriented process planning me thod, the human machine cooperation in process planning, the generation of manu facture bill of material (MBOM) and the dynamic data exchanging technology betwe en CAPP and enterprise resource planning (ERP), are discussed. The CAPP system h as been applied at a CIMS environment corporation successfully.展开更多
According to the variable toe-to-heel well spacing, combined with the dislocation theory, discrete lattice method, and finite-element-method(FEM) based fluid-solid coupling, an integrated geological-engineering method...According to the variable toe-to-heel well spacing, combined with the dislocation theory, discrete lattice method, and finite-element-method(FEM) based fluid-solid coupling, an integrated geological-engineering method of volume fracturing for fan-shaped well pattern is proposed considering the geomechanical modeling, induced stress calculation, hydraulic fracturing simulation, and post-frac productivity evaluation. Besides, we propose the differential fracturing design for the conventional productivity-area and the potential production area for fan-shaped horizontal wells. After the fracturing of the conventional production area for H1 fan-shaped well platform, the research shows that the maximum reduction of the horizontal principal stress difference in the potential productivity-area is 0.2 MPa, which cannot cause the stress reversal, but this reduction is still conducive to the lateral propagation of hydraulic fractures. According to the optimized fracturing design, in zone-Ⅰ of the potential production area, only Well 2 is fractured, with a cluster spacing of 30 m and an injection rate of 12 m^(3)/min per stage;in zone-Ⅱ, Well 2 is fractured before Well 3, with a cluster spacing of 30 m and an injection rate of 12 m^(3)/min per stage. The swept area of the pore pressure drop in the potential production area is small, showing that the reservoir is not well developed. The hydraulic fracturing in the toe area can be improved by, for example, properly densifying the fractures and adjusting the fracture distribution, in order to enhance the swept volume and increase the reservoir utilization.展开更多
The 3D simulation in preoperative design for nasal plastic surgery was studied to help patients see the postoperative effects and reduce medical disputes.The study developed and clinically tested an innovative design ...The 3D simulation in preoperative design for nasal plastic surgery was studied to help patients see the postoperative effects and reduce medical disputes.The study developed and clinically tested an innovative design for surgical guides for nasal plastic surgery,which showed positive results in patient satisfaction and accuracy in achieving the preoperative simulated effect.The study also investigated the process of designing and producing nasal prostheses and how patient feedback could be obtained using third-party social media voting.Patient satisfaction information was collected and evaluated using the Likert scale,and the data statistical analysis was carried out with the SPSS19.0 software.More than 94.1% of the patients were satisfied with the postoperative results.The study provides a good reference case for the integration of knowledge and skills from the medicine,design,and engineering fields in the development of medical devices.展开更多
CAD/CAM integration is broadly viewed as tool integration. From this point of view, both CAD/CAM software and hardware are considered as tools. A great advantage of this view point is that a very flexible paradigm is...CAD/CAM integration is broadly viewed as tool integration. From this point of view, both CAD/CAM software and hardware are considered as tools. A great advantage of this view point is that a very flexible paradigm is introduced, in which the CAD/CAM system for a particular industrial application can be customized and built by selecting a set of tools. This paper intends to shed some lights on the principles for designing the architecture of such a tool integration environment. Although such an environment is no more than a computer program sys. tem itself, its particular characteristics arising from its unique role, i.e., tool integration, make the discussion on the designing of an environment architecture nontrivial. The paper externalizes the author's experiences in implementing an tool integration environment for production machines.In particular, the discussion renders some insights into the concepts such as tool integration models, various views of an environment architecture, classification of data into tool-data and environment data, and employment of the information relativity principle in making an environment architecture flexible. The paper will take production machines design as a target application that an environment system is developed for, owing to its extreme complexity and thus make sense of coverage of other engineering applications.展开更多
Computer-integrated manufacturing (CIM) and revers e engineering (RE) have changed drastically the concept of product re-design, pla nning and manufacture of components. However, the main problems currently facing the...Computer-integrated manufacturing (CIM) and revers e engineering (RE) have changed drastically the concept of product re-design, pla nning and manufacture of components. However, the main problems currently facing the developers of reverse engineering system, is the time consuming digitis ation of 3D data and the conversion of large amounts of data into a concise and manageable format and linking it to a CAD/CAM system. Automated 3-D profile gen eration, measurements and inspection of manufactured component represents one of the important functions in reverse engineering and in the improvements in produ ct quality in rapid product developments. The paper presents a novel methodology for the development of a reverse enginee ring technique for use in the rapid product development in a CIM environment . The system developed provides integration, data capture and manipulation, dat a transfer between a CAD, CAM, Computer-aided inspection (CAI) and a 3-D profi le scanning system. An efficient scanning strategy has been developed for scann ing and surfaces data acquisition. The products were scanned using a laser scann ing system with a dedicated scan control card and the associated software packag es. A versatile rig was developed for the ease of data gathering of the profile scanning process. The surface data collected was then used to build a mathematic al surface model, which was then used to develop a virtual 3-D model of the pro duct. The resulting surface model provides the geometrical input to the subseque nt machining operation using either a CNC system or other manufacturing operatio n e.g. dies casting/mould casting etc. The prototypes developed were inspected u sing a state-of-the art CNC-CMM that was integrated to the CAD/CAM system. Si nce the scanning/digitised data captured by laser scanning probes requires no ma nual editing, significant time saving over most non-contact probe systems was a chieved. Since the creation of an accurate CAD model of a redesigned component o r a prototype constitute a major element of the total turnaround time; maximum r eturn can be achieved by increasing the efficiency of the redesigning process. T he paper also outlines with a case study the application of the developed system . The system developed offers the flexibility of using the concept of reverse en gineering of a variety of components with the complimentary facility of integrat ion between CAD/CAM Computer-aided Inspection (CAI) systems and a scanning syst em. The developed reverse engineering application in an integrated manufacturing system can increase the consistency, improve cost-efficiency, reduce produ ct turn around and skill levels required to redesign, reengineer and prototyping components and products.展开更多
This paper studies and explores the construction of a teaching resource library for landscape engineering under the“4321”industry-education integration system,focusing on the construction objectives,construction pat...This paper studies and explores the construction of a teaching resource library for landscape engineering under the“4321”industry-education integration system,focusing on the construction objectives,construction paths,and construction contents,aiming to open-up the channel of school-enterprise cooperation,improve enterprise participation,and promote the reform of teaching mode and teaching methods.Establishing a practical resource library will connect and integrate students,teachers,and enterprises.A complete library of landscape-oriented teaching resources will be constructed according to the talent portraits of the industry to open-up the relationship between upstream and downstream courses,and further improve the precise fit between the cultivation of applied undergraduate talents and enterprises.展开更多
基金Jiangsu Province Vocational Education Teaching Reform Research Project“Construction and Application of Digital Teaching Factory Under the Background of Integration of Production and Education-A Case Study of Chemical Engineering Majors in Vocational Colleges”(ZYB141)Center for Scientific Research and Development in Higher Education Institutes,Ministry of Education 2022“Virtual Simulation Technology in Vocational Education and Teaching Innovation Application”Special Project(ZJXF2022320)。
文摘With the development of the integration of production and education,chemical engineering and technology education is facing many new challenges and opportunities.The construction of a chemical virtual simulation practice teaching system under the background of integration of production and education aims to improve students’learning efficiency and innovation ability with the help of virtual simulation technology,so as to meet the needs of future industrial development.This paper discusses the significance of the construction of the system,analyzes the difficulties and challenges that may be encountered in the construction process,and evaluates the effective strategies to strengthen the construction of the system.Through the introduction of virtual simulation technology,students can improve their practical skills and innovation ability,and better adapt to the development needs of industrialization and informatization.
文摘To improve the design and management of an integrated production system(IPS),a set of mathematical models and workflows are developed for evaluating the capacity of an IPS at steady-state conditions.Combining the conservation laws with applicable multiphase fluid and choke models,these mathematical models are solved to characterize the hydraulics of an integrated system of reservoir,wells,chokes,flowlines,and separator at steady state.The controllable variables such as well count,choke size and separator pressure are adjusted to optimize the performance of the IPs at a specific time.It is found that increasing the well count can increase the bulk flow rate of the production network,but too many wells may increase the manifold pressure,leading to decline of single-well production.Increasing the choke size can improve the capacity of the IPs.The production of the IPs is negatively correlated with the separator pressure.With increasing separator pressure and decreasing choke size,the increment of total fluid production(the capacity of IPS)induced by increasing well count decreases.Validation tests with field examples show a maximum absolute deviation is 1.5%,demonstrating the robustness and validity of the proposed mathematical models and workflows.
基金Supported by Scientific Research Fund Project of Yunnan Provincial Department of Education (2023J2034).
文摘According to the Annex Technical Regulations for Integrated Curriculum Development(Trial)in Document No.30 of the General Office of the Ministry of Human Resources and Social Security(2012),this paper studies the formulation of the curriculum standards for the integration of Chinese medicinal materials production.We focus on the formulation ideas of the curriculum standards for the integration of Chinese medicinal materials production,the formulation process of the curriculum standards for the integration of Chinese medicinal materials production,including the description of typical work tasks,the determination of curriculum objectives,the analysis of study content,the description of referential study tasks,teaching implementation suggestions,assessment and evaluation suggestions,which can provide a reference for the development and research of other related integrated courses.
基金This research was funded by the Key Laboratory for Sustainable Development of Xinjiang's Historical and Cultural Tourism,Xinjiang University,China(LY2022-06)the Tianchi Talent Project.
文摘Nature reserves play a significant role in providing ecosystem services and are key sites for biodiversity conservation.The Tianchi Bogda Peak Natural Reserve(TBPNR),located in Xinjiang Uygur Autonomous Region,China,is an important ecological barrier area in the temperate arid zone.The evaluation of its important ecosystem services is of great significance to improve the management level and ecological protection efficiency of the reserve.In the present study,we assessed the spatiotemporal variations of four ecosystem services(including net primary productivity(NPP),water yield,soil conservation,and habitat quality)in the TBPNR from 2000 to 2020 based on the environmental and social data using the Integrated Valuation of Ecosystem Services and Trade-offs(InVEST)model.In addition,the coldspot and hotspot areas of ecosystem services were identified by hotspot analysis,and the trade-off and synergistic relationships between ecosystem services were analyzed using factor analysis in a geographic detector.During the study period,NPP and soil conservation values in the reserve increased by 48.20%and 25.56%,respectively;conversely,water yield decreased by 16.56%,and there was no significant change in habitat quality.Spatially,both NPP and habitat quality values were higher in the northern part and lower in the southern part,whereas water yield showed an opposite trend.Correlation analysis revealed that NPP showed a synergistic relationship with habitat quality and soil conservation,and exhibited a trade-off relationship with water yield.Water yield and habitat quality also had a trade-off relationship.NPP and habitat quality were affected by annual average temperature and Normalized Difference Vegetation Index(NDVI),respectively,while water yield and soil conservation were more affected by digital elevation model(DEM).Therefore,attention should be paid to the spatial distribution and dynamics of trade-off and synergistic relationships between ecosystem services in future ecological management.The findings of the present study provide a reference that could facilitate the sustainable utilization of ecosystem services in the typical fragile areas of Northwest China.
文摘Based on the analysis of the development process system status of domestic and foreign civil aircraft airborne system suppliers,this paper proposes the overall construction idea of"a set of civil aircraft process system"based on IPD(Integrated product development)in the organization.The development stage,process,activity and task are the logical framework elements of the system construction."Based on process decomposition,vertical stratification,horizontal segmentation,combination of special and common,process customized to tools,role and process integration,giving full consideration to the interface between supplier management and process modules"etc.are the concrete ideas.Moreover,formulate top⁃level system construction standards,implemented by process system management tool platform,so that the process system and development work can be effectively integrated to effectively guide the development work of airborne system suppliers,and meet the quality and airworthiness requirements of civil aircraft development.Through the development application of a certain type of flight control system,the process system and tool platform were verified and optimized in practice.
基金Supported by the Achievement of Program for New Century Excellent Talents in Heilongjiang Province (1153-NCET-004)Project of Postdoctoral Scientific Research Launch Foundation in Heilongjiang Province
文摘Heilongjiang Province is an important marketable grain depot in China. Since the reform and opening up, Heilongjiang Province production capacity of foodstuff is increasingly growing into a new level. This paper started with the actuality of Heilongjiang Province integrated production capacity of foodstuff, and analyzed its major factors empirically through the mathematical model, then proposed some measures to enhance Heilongjiang Province production capacity of foodstuff which ensured China foodstuff security
基金financially supported by the National Natural Science Foundation of China (No.51274043)。
文摘This research attempts to devise a multistage and multiproduct short-term integrative production plan that can dynamically change based on the order priority and virtual occupancy for application in steel plants. Considering factors such as the delivery time, varietal compatibility between different products, production capacity of variety per hour, minimum or maximum batch size, and transfer time, we propose an available production capacity network with varietal compatibility and virtual occupancy for enhancing production plan implementation and quick adjustment in the case of dynamic production changes. Here available means the remaining production capacity after virtual occupancy.To quickly build an available production capacity network and increase the speed of algorithm solving, constraint selection and cutting methods with order priority were used for model solving. Finally, the genetic algorithm improved with local search was used to optimize the proposed production plan and significantly reduce the order delay rate. The validity of the proposed model and algorithm was numerically verified by simulating actual production practices. The simulation results demonstrate that the model and improved algorithm result in an effective production plan.
基金National Natural Science Foundation of China! 49676296National Scientific and Technical Project! 97-926-04-02.
文摘The spatial and temporal distributions of new production vary largely in different sea areas. To understand the level of new production in the sea area studied better, an estimate of new production must be obtained in large spatial and temporal scales. The ~234Th/ ~238U disequilibrium is an effective method for the study of new production. Two sampling strategies, vertically integrated sampling ap proach based on trapezoidal integration principle and discrete layer sampling approach, were compared in the studies of the xiamen Bay and the northern South China Sea. The scavenging fluxes and removal fluxes of ~234Th and the residence times for dissolved and particulate ~234Th were calculated. The coinci dent results from two Sampling approach suggest that vertically integrated sampling approach is not only effective and reliable, but also significantly reduces the number and volume of samples. It allows us to study new production by ba ^(234)Th - ^(238)U disequilibria in large spatial scale.
基金Supported by Fundamental Research Funds for the Central Universities of China Pharmaceutical University(2015PYW01)
文摘The fundamental task of well-facilitated farmland construction is to continuously lift the integrated production capacity. External project construction for well-facilitated farmland can not completely solve existing problems in improvement of intrinsic quality of farmland.Based on research findings of integrated production capacity of farmland,starting from basic elements such as water,soil,seed,fertilizer,and pesticide,this paper introduced factors influencing the integrated production capacity of well-facilitated farmland,including natural quality of farmland,supporting infrastructure,agricultural technology level and management level,and labor quality. Besides,it establish an evaluation system for integrated production capacity of well-facilitated farmland in Jiangsu Province by Analytic Hierarchy Process( AHP),and made an empirical study using indicator data of 2010- 2014. Results indicated that the general index of integrated production capacity of farmland in Jiangsu Province in 2010- 2014 was ascending,reflecting improvement of integrated production capacity of farmland. With the aid of radar map,it further found that the coupling between water,soil,seed,fertilizer,and pesticide and other elements play a crucial role in lifting the integrated production capacity of farmland. Finally,based on existing problems in construction of well-facilitated farmland in Jiangsu Province,it came up with some pertinent recommendations from the perspective of coordinated development of all elements.
基金This paper is supported by National High-Tech Research and Development Plan Foundation in China(2005AA4Z3060) and Electronic Development Fund in 2003.
文摘This paper addresses some key issues in supporting product family design in a 3 D CAD/ PDM integrated system and introduces the techniques developed or adopted in building the integrated system. The general architecture of a 3D CAD/PDM integrated system is organized as five tiers. Multi-agent technology is applied with a collaborative design environment. The rule-based product family architecture ( PFA ) and tabular layouts of article characteristics (TLAC) technique are applied to represent the knowledge for product families. They make the knowledge understandable, simplified and can be exchanged among heterogeneous information systems. A transparently concentric integrated mode is put forward to enable the heterogeneous processes to interact and communicate regardless of the language used to construct each process. With the mode, function calling and information exchanging among different processes are carried out via message translation/parse approach. Currently, the integrated system is implemented in the platform of Windows NT and 2000.
文摘Hong Kong knitwear manufacturers were among the pioneers to invest in the Pearl River Delta region of Guang-dong,China.Owing to limitations on technological levelat the time of the initial investments,the content of pro-duction-sharing for the Inland in China were basically of simple technology and labour intensive in nature.Through venturing hardships,the investment has been able to boost the economy of Guangdong and foster close trade relationship,especially in outward processing trade,By now,the co-operative production
文摘The necessi ty of product oriented integrated computer aided process planning (CAPP) is analy zed, and the system architecture and the main functions are described in detail. The key issues of the system, such as the product oriented process planning me thod, the human machine cooperation in process planning, the generation of manu facture bill of material (MBOM) and the dynamic data exchanging technology betwe en CAPP and enterprise resource planning (ERP), are discussed. The CAPP system h as been applied at a CIMS environment corporation successfully.
基金Supported by National Natural Science Foundation of China (52104029,U2139204)PetroChina Science and Technology Innovation Foundation (2021 DQ02-0501)。
文摘According to the variable toe-to-heel well spacing, combined with the dislocation theory, discrete lattice method, and finite-element-method(FEM) based fluid-solid coupling, an integrated geological-engineering method of volume fracturing for fan-shaped well pattern is proposed considering the geomechanical modeling, induced stress calculation, hydraulic fracturing simulation, and post-frac productivity evaluation. Besides, we propose the differential fracturing design for the conventional productivity-area and the potential production area for fan-shaped horizontal wells. After the fracturing of the conventional production area for H1 fan-shaped well platform, the research shows that the maximum reduction of the horizontal principal stress difference in the potential productivity-area is 0.2 MPa, which cannot cause the stress reversal, but this reduction is still conducive to the lateral propagation of hydraulic fractures. According to the optimized fracturing design, in zone-Ⅰ of the potential production area, only Well 2 is fractured, with a cluster spacing of 30 m and an injection rate of 12 m^(3)/min per stage;in zone-Ⅱ, Well 2 is fractured before Well 3, with a cluster spacing of 30 m and an injection rate of 12 m^(3)/min per stage. The swept area of the pore pressure drop in the potential production area is small, showing that the reservoir is not well developed. The hydraulic fracturing in the toe area can be improved by, for example, properly densifying the fractures and adjusting the fracture distribution, in order to enhance the swept volume and increase the reservoir utilization.
文摘The 3D simulation in preoperative design for nasal plastic surgery was studied to help patients see the postoperative effects and reduce medical disputes.The study developed and clinically tested an innovative design for surgical guides for nasal plastic surgery,which showed positive results in patient satisfaction and accuracy in achieving the preoperative simulated effect.The study also investigated the process of designing and producing nasal prostheses and how patient feedback could be obtained using third-party social media voting.Patient satisfaction information was collected and evaluated using the Likert scale,and the data statistical analysis was carried out with the SPSS19.0 software.More than 94.1% of the patients were satisfied with the postoperative results.The study provides a good reference case for the integration of knowledge and skills from the medicine,design,and engineering fields in the development of medical devices.
文摘CAD/CAM integration is broadly viewed as tool integration. From this point of view, both CAD/CAM software and hardware are considered as tools. A great advantage of this view point is that a very flexible paradigm is introduced, in which the CAD/CAM system for a particular industrial application can be customized and built by selecting a set of tools. This paper intends to shed some lights on the principles for designing the architecture of such a tool integration environment. Although such an environment is no more than a computer program sys. tem itself, its particular characteristics arising from its unique role, i.e., tool integration, make the discussion on the designing of an environment architecture nontrivial. The paper externalizes the author's experiences in implementing an tool integration environment for production machines.In particular, the discussion renders some insights into the concepts such as tool integration models, various views of an environment architecture, classification of data into tool-data and environment data, and employment of the information relativity principle in making an environment architecture flexible. The paper will take production machines design as a target application that an environment system is developed for, owing to its extreme complexity and thus make sense of coverage of other engineering applications.
文摘Computer-integrated manufacturing (CIM) and revers e engineering (RE) have changed drastically the concept of product re-design, pla nning and manufacture of components. However, the main problems currently facing the developers of reverse engineering system, is the time consuming digitis ation of 3D data and the conversion of large amounts of data into a concise and manageable format and linking it to a CAD/CAM system. Automated 3-D profile gen eration, measurements and inspection of manufactured component represents one of the important functions in reverse engineering and in the improvements in produ ct quality in rapid product developments. The paper presents a novel methodology for the development of a reverse enginee ring technique for use in the rapid product development in a CIM environment . The system developed provides integration, data capture and manipulation, dat a transfer between a CAD, CAM, Computer-aided inspection (CAI) and a 3-D profi le scanning system. An efficient scanning strategy has been developed for scann ing and surfaces data acquisition. The products were scanned using a laser scann ing system with a dedicated scan control card and the associated software packag es. A versatile rig was developed for the ease of data gathering of the profile scanning process. The surface data collected was then used to build a mathematic al surface model, which was then used to develop a virtual 3-D model of the pro duct. The resulting surface model provides the geometrical input to the subseque nt machining operation using either a CNC system or other manufacturing operatio n e.g. dies casting/mould casting etc. The prototypes developed were inspected u sing a state-of-the art CNC-CMM that was integrated to the CAD/CAM system. Si nce the scanning/digitised data captured by laser scanning probes requires no ma nual editing, significant time saving over most non-contact probe systems was a chieved. Since the creation of an accurate CAD model of a redesigned component o r a prototype constitute a major element of the total turnaround time; maximum r eturn can be achieved by increasing the efficiency of the redesigning process. T he paper also outlines with a case study the application of the developed system . The system developed offers the flexibility of using the concept of reverse en gineering of a variety of components with the complimentary facility of integrat ion between CAD/CAM Computer-aided Inspection (CAI) systems and a scanning syst em. The developed reverse engineering application in an integrated manufacturing system can increase the consistency, improve cost-efficiency, reduce produ ct turn around and skill levels required to redesign, reengineer and prototyping components and products.
基金“Research on the Construction of Teaching Resource Library under the“4321”Industry-Education Integration System-Taking the Environmental Design Major as an Example”Chongqing Institute of Technology Education and Teaching Reform Research Project(Project number:JY2022308)。
文摘This paper studies and explores the construction of a teaching resource library for landscape engineering under the“4321”industry-education integration system,focusing on the construction objectives,construction paths,and construction contents,aiming to open-up the channel of school-enterprise cooperation,improve enterprise participation,and promote the reform of teaching mode and teaching methods.Establishing a practical resource library will connect and integrate students,teachers,and enterprises.A complete library of landscape-oriented teaching resources will be constructed according to the talent portraits of the industry to open-up the relationship between upstream and downstream courses,and further improve the precise fit between the cultivation of applied undergraduate talents and enterprises.