AIM To report on the efficacy, safety and tolerability of interferon alfa-2a combined with a "low dose" of ribavirin for relapsers and non responders to alpha interferon monotherapy.METHODS Thirty-four chron...AIM To report on the efficacy, safety and tolerability of interferon alfa-2a combined with a "low dose" of ribavirin for relapsers and non responders to alpha interferon monotherapy.METHODS Thirty-four chronic hepatitis C virus-infected non-responders to interferon alfa2a monotherapy (a course of at least 3 months treatment) and 13 relapsers to interferon alfa 2a monotherapy (a dose of 3 to 6 million units three times per week for at least 20 weeks but not more than 18 months) were treated with the same dose of interferon alfa-2a used before (3 to 6 million units three times per week) and ribavirin (10 mg/ kg daily) for 6 months. In complete responders, interferon alfa-2a was administered for further 6 months at the same dose used before as monotherapy.RESULTS Seven (20.6%) of 34 non-responders stopped the combined therapy due to adverse events, including two patients with histological and clinical Child A cirrhosis. In 17/27 (63%)non-responders, the combined therapy was stopped after three months because of non-response. Ten of the 27 non-responders completed the 1;2-month treatment course. At a mean follow up of 28 months (16- 37 months)after the treatment, 4/10 (15%) previous non-responders still remained complete responders,All 13 previous relapsers completed the 12-month treatment course. At a mean follow up of 22months (9 - 36 months) after treatment, 6/13(46%) the previous relapsers were stillsustained complete responders.CONCLUSION Our treatment schedule of the combined therapy for 6 months of interferon alfa2a with a low dose of ribavirin (10 mg/kg/day)followed by 6 months of interferon alfa-2amonotherapy is able to induce a sustainedcomplete response rate in 15% of non-responders and 46% of relapsers with chronic hepatitis C virus-related liver diseases comparable to those obtained with the standarddoses of ribavirin 1000 - 1200 mg/day.Randomized prospective controlled trials using lower total amounts of ribavirin in combination with interferon should be performed.展开更多
The objective was to create an Egyptian database on the contributors of fruit and vegetables in the diets of preschool children and to estimate the usual daily intakes of fruits, vegetables and vitamin C. A total of 5...The objective was to create an Egyptian database on the contributors of fruit and vegetables in the diets of preschool children and to estimate the usual daily intakes of fruits, vegetables and vitamin C. A total of 59 healthy boys and girls aged 2.5 - 6 years attending day care centers in urban Giza governorate completed the study by interviewing their mothers on 6x non-consecutive days using the 24 h dietary recall. Participants were classified according to age, gender and socioeconomic class. Prevalence of daily consumptions of fruits and vegetables amounted to 22% and 54%, respectively of the total children. The daily intakes of fruits and vegetables averaged 117.5 and 56.4 g, respectively. The consumption of different types of fruits and vegetables was unevenly distributed by different personal and social variables. Estimated daily vitamin C supply from the diet was 38 mg per child, which satisfied the respective recommended nutrient intake (RNI) of 30 mg for the first six years of life. However, the diet of 15% of the children covered less than 75% of RNI. Top fruits contributing to vitamin C were oranges, guava, watermelon, pears and grapes. Extra foods such as chipsy was consumed by 81% of the children, contributed 18% to daily vitamin C supply and also 58.6 mg sodium. A multilevel intervention strategy is warranted for promoting daily fruit and vegetable intake and healthy eating in early childhood.展开更多
Use of water-borne wood preservatives began in approximately the 1950s. Residential and commercial uses rapidly developed for products such as decking, fences, and other outdoor structures. Nearly all such products we...Use of water-borne wood preservatives began in approximately the 1950s. Residential and commercial uses rapidly developed for products such as decking, fences, and other outdoor structures. Nearly all such products were treated by preservatives using arsenic as a major ingredient. The most common preservative was chromated copper arsenate (CCA). A smaller volume used ammoniacal copper zinc arsenate (ACZA). Preservative label changes made in 2003 limited uses of these arsenical treatments to industrial or agricultural type uses, such as poles, piles, ties, bridges, and fencing. Use volumes of preservative-treated wood continued to grow after the label change, but the types of preservatives used changed greatly. The amounts of water-borne treated wood reaching end-of-life and being disposed also continued to grow, reflecting the increasing inventory of volume in service. However, the volume of arsenical-treated wood being disposed peaked in approximately 2008 and is now only approximately one-quarter of that volume. Most of the arsenical-treated wood now being disposed consists of large, easily identified and separated pieces, such as round poles, piles, and fence posts and timbers, which can be easily managed separated from other wood construction and demolition (C & D) waste. Thus, managing C & D waste to limit arsenic contamination of potential products, such as mulch, will be much more practical than some have feared.展开更多
IEEE 1012 [1] describes the SDLC phase activities for software independent verification and validation (IV & V) for nuclear power plant in truly general and conceptual manner, which requires the upward and/or down...IEEE 1012 [1] describes the SDLC phase activities for software independent verification and validation (IV & V) for nuclear power plant in truly general and conceptual manner, which requires the upward and/or downward tailoring on its interpretation for practical IV & V. It contains crucial and encompassing check points and guidelines to analyze the design integrity, without addressing the formalized and the specific criteria for IV & V activities confirming the technical integrity. It is necessary to list up the inspection viewpoint via interpretation of the standard that is practical review points checking design consistency. For fruitful IV & V of Control Element Driving Mechanism Control System (CEDMCS) software for Yonggwang Nuclear Power Plant unit 3 & 4, the specific viewpoints and approach are necessary based on the guidelines of IEEE 1012 to enhance the system quality by considering the level of implementation of the theoretical and the practical IV & V. Additionally IV & V guideline of IEEE 1012 does not specifically provide the concrete measure considering the system characteristics of CEDMCS. This paper provides the seven (7) characteristic criteria for CEDMCS IV & V, and by applying these viewpoints, the design analysis such as function, performance, interface and exception, backward and forward requirement traceability analysis has been conducted. The requirement, design, implementation, and test phase were only considered for IV & V in this project. This article also provides the translation of code to map theoretical verification and validation into practical verification and validation. This paper emphasizes the necessity of the intensive design inspection and walkthrough for requirement phase to resolve the design faults because the IV & V of early phase of SDLC obviously contributes to find out most of critical design inconsistency. Especially for test phase IV & V, it is strongly recommended to prepare the test plan document which is going to be the basis for the test coverage selection and test strategy. This test plan document should be based on the critical characteristics of function and performance of CEDMCS. Also to guarantee the independency of V & V organization participating in this project, and to acquire the full package of design details for IV & V, the systematic approach and efforts with an aspect of management is highlighted among the participants.展开更多
针对电子财务会计信息电算化系统在复杂环境下存在的工作时效性差和运营成本高等问题,文中提出一种新的ERP环境下电子财务会计信息电算化系统。首先,该系统选择C/S方式、B/S模式和Web服务器,并且采用Interface Package作为数据接口构建...针对电子财务会计信息电算化系统在复杂环境下存在的工作时效性差和运营成本高等问题,文中提出一种新的ERP环境下电子财务会计信息电算化系统。首先,该系统选择C/S方式、B/S模式和Web服务器,并且采用Interface Package作为数据接口构建混合模式结构,完成电算化系统编码;其次,结合三层结构构建数据访问层与业务逻辑层,分离数据实体与业务逻辑;最后,考虑到数据访问的便捷性和安全性,通过SQL Server 2018数据库完成科目编码设计与实体关系描述,采用可视化工具优化数据库,设计数据库视图功能,完成ERP环境下电子财务会计信息电算化系统的设计。实验结果表明,所设计系统的运营成本中,支出仅为500万元,收入为923万元,相比于企业未应用该系统前,支出降低329万元,收入增加521万元,且时效均在2天以内。该系统能够大幅度降低运营成本,显著地提升会计信息的时效性。展开更多
文摘AIM To report on the efficacy, safety and tolerability of interferon alfa-2a combined with a "low dose" of ribavirin for relapsers and non responders to alpha interferon monotherapy.METHODS Thirty-four chronic hepatitis C virus-infected non-responders to interferon alfa2a monotherapy (a course of at least 3 months treatment) and 13 relapsers to interferon alfa 2a monotherapy (a dose of 3 to 6 million units three times per week for at least 20 weeks but not more than 18 months) were treated with the same dose of interferon alfa-2a used before (3 to 6 million units three times per week) and ribavirin (10 mg/ kg daily) for 6 months. In complete responders, interferon alfa-2a was administered for further 6 months at the same dose used before as monotherapy.RESULTS Seven (20.6%) of 34 non-responders stopped the combined therapy due to adverse events, including two patients with histological and clinical Child A cirrhosis. In 17/27 (63%)non-responders, the combined therapy was stopped after three months because of non-response. Ten of the 27 non-responders completed the 1;2-month treatment course. At a mean follow up of 28 months (16- 37 months)after the treatment, 4/10 (15%) previous non-responders still remained complete responders,All 13 previous relapsers completed the 12-month treatment course. At a mean follow up of 22months (9 - 36 months) after treatment, 6/13(46%) the previous relapsers were stillsustained complete responders.CONCLUSION Our treatment schedule of the combined therapy for 6 months of interferon alfa2a with a low dose of ribavirin (10 mg/kg/day)followed by 6 months of interferon alfa-2amonotherapy is able to induce a sustainedcomplete response rate in 15% of non-responders and 46% of relapsers with chronic hepatitis C virus-related liver diseases comparable to those obtained with the standarddoses of ribavirin 1000 - 1200 mg/day.Randomized prospective controlled trials using lower total amounts of ribavirin in combination with interferon should be performed.
文摘The objective was to create an Egyptian database on the contributors of fruit and vegetables in the diets of preschool children and to estimate the usual daily intakes of fruits, vegetables and vitamin C. A total of 59 healthy boys and girls aged 2.5 - 6 years attending day care centers in urban Giza governorate completed the study by interviewing their mothers on 6x non-consecutive days using the 24 h dietary recall. Participants were classified according to age, gender and socioeconomic class. Prevalence of daily consumptions of fruits and vegetables amounted to 22% and 54%, respectively of the total children. The daily intakes of fruits and vegetables averaged 117.5 and 56.4 g, respectively. The consumption of different types of fruits and vegetables was unevenly distributed by different personal and social variables. Estimated daily vitamin C supply from the diet was 38 mg per child, which satisfied the respective recommended nutrient intake (RNI) of 30 mg for the first six years of life. However, the diet of 15% of the children covered less than 75% of RNI. Top fruits contributing to vitamin C were oranges, guava, watermelon, pears and grapes. Extra foods such as chipsy was consumed by 81% of the children, contributed 18% to daily vitamin C supply and also 58.6 mg sodium. A multilevel intervention strategy is warranted for promoting daily fruit and vegetable intake and healthy eating in early childhood.
文摘Use of water-borne wood preservatives began in approximately the 1950s. Residential and commercial uses rapidly developed for products such as decking, fences, and other outdoor structures. Nearly all such products were treated by preservatives using arsenic as a major ingredient. The most common preservative was chromated copper arsenate (CCA). A smaller volume used ammoniacal copper zinc arsenate (ACZA). Preservative label changes made in 2003 limited uses of these arsenical treatments to industrial or agricultural type uses, such as poles, piles, ties, bridges, and fencing. Use volumes of preservative-treated wood continued to grow after the label change, but the types of preservatives used changed greatly. The amounts of water-borne treated wood reaching end-of-life and being disposed also continued to grow, reflecting the increasing inventory of volume in service. However, the volume of arsenical-treated wood being disposed peaked in approximately 2008 and is now only approximately one-quarter of that volume. Most of the arsenical-treated wood now being disposed consists of large, easily identified and separated pieces, such as round poles, piles, and fence posts and timbers, which can be easily managed separated from other wood construction and demolition (C & D) waste. Thus, managing C & D waste to limit arsenic contamination of potential products, such as mulch, will be much more practical than some have feared.
文摘IEEE 1012 [1] describes the SDLC phase activities for software independent verification and validation (IV & V) for nuclear power plant in truly general and conceptual manner, which requires the upward and/or downward tailoring on its interpretation for practical IV & V. It contains crucial and encompassing check points and guidelines to analyze the design integrity, without addressing the formalized and the specific criteria for IV & V activities confirming the technical integrity. It is necessary to list up the inspection viewpoint via interpretation of the standard that is practical review points checking design consistency. For fruitful IV & V of Control Element Driving Mechanism Control System (CEDMCS) software for Yonggwang Nuclear Power Plant unit 3 & 4, the specific viewpoints and approach are necessary based on the guidelines of IEEE 1012 to enhance the system quality by considering the level of implementation of the theoretical and the practical IV & V. Additionally IV & V guideline of IEEE 1012 does not specifically provide the concrete measure considering the system characteristics of CEDMCS. This paper provides the seven (7) characteristic criteria for CEDMCS IV & V, and by applying these viewpoints, the design analysis such as function, performance, interface and exception, backward and forward requirement traceability analysis has been conducted. The requirement, design, implementation, and test phase were only considered for IV & V in this project. This article also provides the translation of code to map theoretical verification and validation into practical verification and validation. This paper emphasizes the necessity of the intensive design inspection and walkthrough for requirement phase to resolve the design faults because the IV & V of early phase of SDLC obviously contributes to find out most of critical design inconsistency. Especially for test phase IV & V, it is strongly recommended to prepare the test plan document which is going to be the basis for the test coverage selection and test strategy. This test plan document should be based on the critical characteristics of function and performance of CEDMCS. Also to guarantee the independency of V & V organization participating in this project, and to acquire the full package of design details for IV & V, the systematic approach and efforts with an aspect of management is highlighted among the participants.
文摘针对电子财务会计信息电算化系统在复杂环境下存在的工作时效性差和运营成本高等问题,文中提出一种新的ERP环境下电子财务会计信息电算化系统。首先,该系统选择C/S方式、B/S模式和Web服务器,并且采用Interface Package作为数据接口构建混合模式结构,完成电算化系统编码;其次,结合三层结构构建数据访问层与业务逻辑层,分离数据实体与业务逻辑;最后,考虑到数据访问的便捷性和安全性,通过SQL Server 2018数据库完成科目编码设计与实体关系描述,采用可视化工具优化数据库,设计数据库视图功能,完成ERP环境下电子财务会计信息电算化系统的设计。实验结果表明,所设计系统的运营成本中,支出仅为500万元,收入为923万元,相比于企业未应用该系统前,支出降低329万元,收入增加521万元,且时效均在2天以内。该系统能够大幅度降低运营成本,显著地提升会计信息的时效性。