期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
A Stochastic Concession Model for Infrastructure Projects Under Build-Operate-Transfer Schemes
1
作者 朱莹华 徐峰 胡昊 《Journal of Shanghai Jiaotong university(Science)》 EI 2016年第3期320-327,共8页
Concession period is a key factor in the arrangement of a build-operate-transfer(BOT) contract. This paper proposes a stochastic concession period model for infrastructure projects under a BOT scheme, which takes into... Concession period is a key factor in the arrangement of a build-operate-transfer(BOT) contract. This paper proposes a stochastic concession period model for infrastructure projects under a BOT scheme, which takes into account the impact of risks and the risk attitudes of the private investor and the government. A hypothetical case is simulated by using the Monte Carlo simulation method to illustrate the proposed model. The results indicate that even for a project with the same estimations, the concession interval can be different and depends a lot on the risk attitudes of the private investor and the government. The proposed model provides a more reasonable concession interval based on which a specific concession period can be obtained through negotiation between the two parties. 展开更多
关键词 build-operate-transfer(BOT) infrastructure projects concession period risk attitudes Monte Carlo simulation
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部