期刊文献+
共找到14,448篇文章
< 1 2 250 >
每页显示 20 50 100
Simulation of Corrosion-Induced Cracking of Reinforced Concrete Based on Fracture Phase Field Method
1
作者 Xiaozhou Xia Changsheng Qin +2 位作者 Guangda Lu Xin Gu Qing Zhang 《Computer Modeling in Engineering & Sciences》 SCIE EI 2024年第3期2257-2276,共20页
Accurate simulation of the cracking process caused by rust expansion of reinforced concrete(RC)structures plays an intuitive role in revealing the corrosion-induced failure mechanism.Considering the quasi-brittle frac... Accurate simulation of the cracking process caused by rust expansion of reinforced concrete(RC)structures plays an intuitive role in revealing the corrosion-induced failure mechanism.Considering the quasi-brittle fracture of concrete,the fracture phase field driven by the compressive-shear term is constructed and added to the traditional brittle fracture phase field model.The rationality of the proposed model is verified by a mixed fracture example under a shear displacement load.Then,the extended fracture phase model is applied to simulate the corrosion-induced cracking process of RC.The cracking patterns caused by non-uniform corrosion expansion are discussed for RC specimens with homogeneous macroscopically or heterogeneous with different polygonal aggregate distributions at the mesoscopic scale.Then,the effects of the protective layer on the crack propagation trajectory and cracking resistance are investigated,illustrating that the cracking angle and cracking resistance increase with the increase of the protective layer thickness,consistent with the experimental observation.Finally,the corrosion-induced cracking process of concrete specimens with large and small spacing rebars is simulated,and the interaction of multiple corrosion cracking is easily influenced by the reinforcement spacing,which increases with the decrease of the steel bar interval.These conclusions play an important role in the design of engineering anti-corrosion measures.The fracture phase field model can provide strong support for the life assessment of RC structures. 展开更多
关键词 Fracture phase field corrosion-induced cracking non-uniform corrosion expansion protective layer thickness reinforcement concrete
下载PDF
Effect of Shrinkage Reducing Agent and Steel Fiber on the Fluidity and Cracking Performance of Ultra-High Performance Concrete
2
作者 Yong Wan Li Li +4 位作者 Jiaxin Zou Hucheng Xiao Mengdi Zhu Ying Su Jin Yang 《Fluid Dynamics & Materials Processing》 EI 2024年第9期1941-1956,共16页
Due to the low water-cement ratio of ultra-high-performance concrete(UHPC),fluidity and shrinkage cracking are key aspects determining the performance and durability of this type of concrete.In this study,the effects ... Due to the low water-cement ratio of ultra-high-performance concrete(UHPC),fluidity and shrinkage cracking are key aspects determining the performance and durability of this type of concrete.In this study,the effects of different types of cementitious materials,chemical shrinkage-reducing agents(SRA)and steel fiber(SF)were assessed.Compared with M2-UHPC and M3-UHPC,M1-UHPC was found to have better fluidity and shrinkage cracking performance.Moreover,different SRA incorporation methods,dosage and different SF types and aspect ratios were implemented.The incorporation of SRA and SF led to a decrease in the fluidity of UHPC.SRA internal content of 1%(NSRA-1%),SRA external content of 1%(WSRA-1%),STS-0.22 and STE-0.7 decreased the fluidity of UHPC by 3.3%,8.3%,9.2%and 25%,respectively.However,SRA and SF improved the UHPC shrinkage cracking performance.NSRA-1%and STE-0.7 reduced the shrinkage value of UHPC by 40%and 60%,respectively,and increased the crack resistance by 338%and 175%,respectively.In addition,the addition of SF was observed to make the microstructure of UHPC more compact,and the compressive strength and flexural strength of 28 d were increased by 26.9%and 19.9%,respectively. 展开更多
关键词 Ultra-high performance concrete chemical shrinkage reducing agent steel fiber shrinkage cracking repair and reinforcement
下载PDF
Analysis of Concrete Crack Treatment Technologies in Buildings
3
作者 Wenyu Zheng 《Journal of Architectural Research and Development》 2023年第4期57-63,共7页
With the continuous development of civil engineering,concrete crack treatment technology has become an important research field.This paper proposes treatment techniques for different types of cracks,including the prev... With the continuous development of civil engineering,concrete crack treatment technology has become an important research field.This paper proposes treatment techniques for different types of cracks,including the prevention and repair of surface cracks,the reinforcement and grouting of structural cracks,and the design and construction of controlled cracks through the analysis of the causes and classification of concrete cracks.The methods and suggestions proposed in this paper are practical and can improve the quality and safety of buildings. 展开更多
关键词 Civil engineering concrete cracks Construction treatment technology Structural damage Safety hazards
下载PDF
Analytic model of non-uniform corrosion induced cracking of reinforced concrete structure 被引量:4
4
作者 张小刚 王学志 +1 位作者 卢朝辉 邢锋 《Journal of Central South University》 SCIE EI CAS 2011年第3期940-945,共6页
In order to perfectly reflect the dynamic corrosion of reinforced concrete (RC) cover in practical engineering,an analytic model of non-uniform corrosion induced cracking was presented based on the elastic-plastic fra... In order to perfectly reflect the dynamic corrosion of reinforced concrete (RC) cover in practical engineering,an analytic model of non-uniform corrosion induced cracking was presented based on the elastic-plastic fracture mechanics theory.Comparisons with the published experimental data show that the predictions given by the present model are in good agreement with the results both for natural exposed experiments and short-time indoor tests (the best difference is about 2.7%).Also it obviously provides much better precision than those models under the assumption of uniform corrosion (the maximal improved precision is about 48%).Therefore,it is pointed out that the so-called uniform corrosion models to describe the cover cracking of RC should be adopted cautiously.Finally,the influences of thickness of local rusty layer around the reinforcing steel bar on the critical corrosion-induced crack indexes were investigated.It is found that the thickness of local rusty layer has great effect on the critical mass loss of reinforcing steel,threshold expansion pressure,and time to cover cracking.For local rusty layer thickness with a size of a=0.5 mm,the time to cover cracking will increase by about one times when a/b (a,semi-minor axis;b,semi-major axis) changes from 0.1 to 1 mm. 展开更多
关键词 reinforced concrete non-uniform corrosion induced cracking dynamic cracking local rusty layer stress intensity factor
下载PDF
Probabilistic Lifetime Assessment of Marine Reinforced Concrete with Steel Corrosion and Cover Cracking 被引量:10
5
作者 陆春华 金伟良 刘荣桂 《China Ocean Engineering》 SCIE EI 2011年第2期305-318,共14页
In order to study the durability behavior of marine reinforced concrete structure suffering from chloride attack, the structural service life is assumed to be divided into three critical stages, which can be character... In order to study the durability behavior of marine reinforced concrete structure suffering from chloride attack, the structural service life is assumed to be divided into three critical stages, which can be characterized by steel corrosion and cover cracking. For each stage, a calculated model used to predict the lifetime is developed. Based on the definition of durability limit state, a probabilistic lifetime model and its time-dependent reliability analytical method are proposed considering the random natures of influencing factors. Then, the probabilistic lifetime prediction models are applied to a bridge pier located in the Hangzhou Bay with Monte Carlo simulation. It is found that the time to corrosion initiation to follows a lognormal distribution, while that the time from corrosion initiation to cover cracking t~ and the time for crack to develop from hairline crack to a limit crack width t2 can be described by Weibull distributions. With the permitted failure probability of 5.0%, it is also observed that the structural durability lifetime mainly depends on the durability life to and that the percentage of participation of the life to to the total service life grows from 61.5% to 83.6% when the cover thickness increases from 40 mm to 80 mm. Therefore, for any part of the marine RC bridge, the lifetime predictions and maintenance efforts should also be directed toward controlling the stage of corrosion initiation induced by chloride ion. 展开更多
关键词 marine reinforced concrete chloride ingress steel corrosion cover cracking probabilistic lifetime
下载PDF
Tensile Strength Characteristics of GFRP Bars in Concrete Beams with Work Cracks under Sustained Loading and Severe Environments 被引量:4
6
作者 何雄君 YANG Jingnan Charles E Bakis 《Journal of Wuhan University of Technology(Materials Science)》 SCIE EI CAS 2013年第5期934-937,共4页
To investigate the effect of different environmental conditions of GFRP bars in concrete beams with work cracks subjected to sustained loads, the beams were exposed in indoor, freeze/thaw cycles and immersed in alkali... To investigate the effect of different environmental conditions of GFRP bars in concrete beams with work cracks subjected to sustained loads, the beams were exposed in indoor, freeze/thaw cycles and immersed in alkaline solution at elevated temperature. The bars were carefully extracted from the beams and tested in order to evaluate residual tensile properties. The results show that the tensile strength decreased significantly in the highly aggressive conditions but not in the natural conditions. The effect of GFRP bars casting in concrete beams demonstrated approximately 2.5% decrease of tensile strength caused by pore water environment in concrete beams on basis of those of the original bars. The effect of sustained loading plus work cracks demonstrated about 10.5% tensile strength decrease on basis of those of the bars only casted in concrete beams. The effect of environments under sustained loading plus work cracks demonstrated about 17% tensile strength decrease caused by a saturated solution of Ca(OH)2 and 60-2 ℃ tap water (pH=12-13) and about 8% tensile strength decrease caused by freezing and thawing cycle (F/T), both on basis of those of the bars of the indoor beams only under sustained loading plus work cracks. The results demonstrate the effects of the tensile strengths under different environmental conditions of GFRP bars in concrete beams with work cracks subjected to sustained loads. 展开更多
关键词 GFRP bars concrete beams working cracks sustained loading and severe environments tensile strength
下载PDF
Assessment of early-age cracking of high-performance concrete in restrained ring specimens 被引量:2
7
作者 Quang-phu NGUYEN Lin-hua JIANG Qiao ZHU 《Water Science and Engineering》 EI CAS 2010年第1期113-120,共8页
High-performance concrete (HPC) is stronger and more durable than conventional concrete. However, shrinkage and shrinkage cracking are common phenomena in HPC, especially early-age cracking. This study assessed earl... High-performance concrete (HPC) is stronger and more durable than conventional concrete. However, shrinkage and shrinkage cracking are common phenomena in HPC, especially early-age cracking. This study assessed early-age cracking of HPC for two mixtures using restrained ring tests. The two mixtures were produced with water/binder mass ratio (mw/mB) of 0.22 and 0.40, respectively. The results show that, with greater steel thickness, the higher degree of restraint resulted in a higher interface pressure and earlier cracking. With steel thickness of 6 mm, 19 mm, and 30 mm, the age of cracking were, respectively, 12 days, 8 days, and 5.4 days with the mw/mB = 0.22 mixture; and 22.5 days, 12.6 days, and 7.1 days with the mw/mB= 0.40 mixture. Cases of the same steel thickness show that the ring specimens with a thicker concrete wall crack later. With the mw/mB = 0.22 mixture, concrete walls with thicknesses of 37.5 mm, 75 mm, and 112.5 mm cracked at 3.4 days, 8.0 days, and 9.8 days, respectively; with the mw/mB = 0.40 mixture, the ages of cracking were 7.1 days, 12.6 days, and 16.0 days, respectively. 展开更多
关键词 high-performance concrete SHRINKAGE early-age cracking restrained ring test
下载PDF
Seismic stability analysis of concrete gravity dams with penetrated cracks 被引量:2
8
作者 Shou-yan JIANG Cheng-bin DU 《Water Science and Engineering》 EI CAS 2012年第1期105-119,共15页
The seismic stability of a cracked dam was examined in this study. Geometric nonlinearity and large deformations, as well as the contact condition at the crack site, were taken into consideration. The location of pene... The seismic stability of a cracked dam was examined in this study. Geometric nonlinearity and large deformations, as well as the contact condition at the crack site, were taken into consideration. The location of penetrated cracks was first identified using the concrete plastic-damage model based on the nonlinear finite element method (FEM). Then, the hard contact algorithm was used to simulate the crack interaction in the normal direction, and the Coloumb friction model was used to simulate the crack interaction in the tangential direction. After verification of numerical models through a case study, the seismic stability of the Koyna Dam with two types of penetrated cracks is discussed in detail with different seismic peak accelerations, and the collapse processes of the cracked dam are also presented. The results show that the stability of the dam with two types of penetrated cracks can be ensured in an earthquake with a magnitude of the original Koyna earthquake, and the cracked dam has a large earthquake-resistant margin. The failure processes of the cracked dam in strong earthquakes can be divided into two stages: the sliding stage and the overturning stage. The sliding stage ends near the peak acceleration, and the top block slides a long distance along the crack before the collapse occurs. The maximum sliding displacement of the top block will decrease with an increasing friction coefficient at the crack site. 展开更多
关键词 seismic stability concrete gravity dam penetrated crack plastic-damage model hard contact algorithm Coloumb friction model joint opening
下载PDF
Effect of Concrete Cracks on Dynamic Characteristics of Powerhouse for Giant-Scale Hydrostation 被引量:2
9
作者 田子勤 张运良 +1 位作者 马震岳 陈婧 《Transactions of Tianjin University》 EI CAS 2008年第4期307-312,共6页
With the increase of capacity and size of the hydro-generator unit, the spiral case becomes a more super-giant hydraulic structure with very high HD value, where H and D denote water head and maximum intake diameter o... With the increase of capacity and size of the hydro-generator unit, the spiral case becomes a more super-giant hydraulic structure with very high HD value, where H and D denote water head and maximum intake diameter of spiral case, respectively. Due to the induced lower stiffness by the more giant size and adverse operation conditions, dynamic performances of the powerhouse and the supporting structure for the giant units have become more important and attracted much attention. If the manner of steel spiral case embedded directly in concrete is adopted, on some locations of the concrete surrounding the spiral case, distributed and concentrated cracks will emerge due to high tensile stress. Although the concrete is reinforced well to control the maximum crack width, definitely these cracks will reduce the local and entire stiffness of the powerhouse. Under dynamic loads such as hydraulic forces including water pressure pulsation in flow passage acting on the structure, effect of the cracks on the dynamic characteristics of the local members and entire structure needs to be evaluated. However, research on this subject is few in hydroelectric engineering. In this paper, Three-Gorge Project was taken as an example to evaluate effect of such cracks on natural frequencies and the vibration responses of the powerhouse under hydraulic and earthquake forces in detail. Results show that cracks only reduce the local structural stiffness greatly but have little effect on the entire powerhouse especially the superstructure; vibrations of powerhouse with cracks in concrete surrounding the spiral case are still under the design limits. Results in this paper have been verified by practice of Three-Gorge Project. 展开更多
关键词 giant-scale hydrostation POWERHOUSE concrete crack dynamic characteristics numerical simulation
下载PDF
Finite element analysis of road structure containing top-down crack within asphalt concrete layer 被引量:2
10
作者 PIRMOHAMMAD Sadjad MAJD-SHOKORLOU Yousef 《Journal of Central South University》 SCIE EI CAS CSCD 2020年第1期242-255,共14页
In this paper, a four-layered road structure containing a top-down crack is investigated by performing finite element analyses in ABAQUS. In this study, in addition to the vertical load of a vehicle wheel, the horizon... In this paper, a four-layered road structure containing a top-down crack is investigated by performing finite element analyses in ABAQUS. In this study, in addition to the vertical load of a vehicle wheel, the horizontal load as well as its position with respect to the crack is also considered in the analyses, and the crack tip parameters including stress intensity factors(SIFs) and T-stress are then calculated. Moreover, influence of elastic modulus and thickness of the pavement layers on the crack tip parameters is studied. Results show that the horizontal and vertical loads along with their position with respect to the crack, elastic modulus and thickness of the road layers influence the crack tip parameters(KⅠ, KⅡ and T-stress) significantly. It was also found that for the cases that the vehicle wheel is positioned near the crack plane, only the shear deformation mode is observed at the crack tip;while, for the vehicle wheel positions far from the crack, only the opening mode is observed, and between these positions, both the opening and shear deformation modes(i.e., mixed mode Ⅰ/Ⅱ) are observed at the crack tip. 展开更多
关键词 asphalt concrete top-down crack stress intensity factors T-STRESS horizontal load vertical load
下载PDF
Evaluation method of cracking resistance of lightweight aggregate concrete 被引量:7
11
作者 季韬 张彬彬 +1 位作者 陈永波 庄一舟 《Journal of Central South University》 SCIE EI CAS 2014年第4期1607-1615,共9页
The cracking behavior of lightweight aggregate concrete(LWAC) was investigated by mechanical analysis, SEM and cracking-resistant test where a shrinkage-restrained ring with a clapboard was used. The relationship betw... The cracking behavior of lightweight aggregate concrete(LWAC) was investigated by mechanical analysis, SEM and cracking-resistant test where a shrinkage-restrained ring with a clapboard was used. The relationship between the ceramsite type and the cracking resistance of LWAC was built up and compared with that of normal-weight coarse aggregate concrete(NWAC). A new method was proposed to evaluate the cracking resistance of concrete, where the concepts of cracking coefficient ζt(t) and the evaluation index Acr(t) were proposed, and the development of micro-cracks and damage accumulation were recognized. For the concrete with an ascending cracking coefficient curve, the larger Acr(t) is, the lower cracking resistance of concrete is. For the concrete with a descending cracking coefficient curve, the larger Acr(t) is, the stronger the cracking resistance of concrete is. The evaluation results show that in the case of that all the three types of coarse aggregates in concrete are pre-soaked for 24 h, NWAC has the lowest cracking resistance, followed by the LWAC with lower water absorption capacity ceramsite and the LWAC with higher water absorption capacity ceramsite has the strongest cracking resistance. The proposed method has obvious advantages over the cracking age method, because it can evaluate the cracking behavior of concrete even if the concrete has not an observable crack. 展开更多
关键词 ceramsite type cracking resistance lightweight aggregate concrete evaluation index evaluation method
下载PDF
ENERGY-SAVING MATCHING STRATEGY AND EXPERIMENTAL STUDY OF PUMPING SYSTEM FOR TRUCK-MOUNTED CONCRETE PUMP 被引量:1
12
作者 李艾民 陈飞 《Transactions of Nanjing University of Aeronautics and Astronautics》 EI 2013年第1期104-108,共5页
Aiming at the high fuel consumption and use-cost of truck-mounted concrete pump , an energy-saving matching strategy of pumping system is presented and the experimental study is conducted.Since pumping system occupies... Aiming at the high fuel consumption and use-cost of truck-mounted concrete pump , an energy-saving matching strategy of pumping system is presented and the experimental study is conducted.Since pumping system occupies most resources of engine , the matching strategy between engine and main pump is analyzed to meet the load demand and reduce the engine rational speed drop.The testing method is established to measure the fuel consumption of engine under various working conditions , and the experimental data are analyzed to find the law of the fuel consumption of engine.The system performance can be improved by adjusting the system input value.Finally , the energy-saving matching strategy is established to reduce the fuel consumption of truck for unit workload , which provides a new approach for the energy-saving of truck-mounted concrete pump. 展开更多
关键词 truck-mounted concrete pump pumping systeml energy saving speed drop of engine
下载PDF
Chloride diffusivity in flexural cracked Portland cement concrete and fly ash concrete beams 被引量:1
13
作者 陆春华 崔钊玮 +1 位作者 刘荣桂 刘奇东 《Journal of Central South University》 SCIE EI CAS 2014年第9期3682-3691,共10页
In order to examine the effect of load-induced transverse cracks on the chloride penetration in flexural concrete beams, two different concretes, Portland cement concrete(PCC) and fly ash concrete(FAC), were tested wi... In order to examine the effect of load-induced transverse cracks on the chloride penetration in flexural concrete beams, two different concretes, Portland cement concrete(PCC) and fly ash concrete(FAC), were tested with various crack widths. Total 14 reinforced concrete(RC) beams, ten of which were self-anchored in a three-point bending mode, were immersed into a 5% NaCl solution with the condition of dry-wet cycles. Then, the free chloride ion contents were determined by rapid chloride testing(RCT) method. Based on the proposed analytical models of chloride penetration in sound and cracked concrete subjected to dry-wet cycles, the apparent chloride diffusion coefficient and chloride diffusivity of concrete were discussed. It can be found that the performance of chloride diffusivity in both concretes will be improved with the increase of crack width, and that the influence of convection action will also be augmented. Based on the two samples obtained in sound concrete after 15 and 30 cycles, the time-exponent, m, for chloride diffusion coefficient was determined to be 0.58, 0.42, 0.62 and 0.77 for PCC1, PCC2, FAC1 and FAC2 specimens, respectively. Finally, two influencing factors of fly ash content and crack width on chloride diffusivity were obtained by regression analysis of test data, and it can be seen that factors kf and kw can be expressed with quadratic polynomial functions of fly ash content, f, and crack width, w, respectively. 展开更多
关键词 flexural cracked concrete fly ash chloride dry-wet cycle equivalent chloride diffusion coefficient
下载PDF
Hydration Process and Crack Tendency of Concrete Based on Resistivity and Restrained Shrinkage Crack 被引量:1
14
作者 MUAZU Bawa Samaila 魏小胜 WANG Lei 《Journal of Wuhan University of Technology(Materials Science)》 SCIE EI CAS 2016年第5期1026-1030,共5页
Hydration process, crack potential and setting time of concrete grade C30, C40 and C50 were monitored by using a non-contact electrical resistivity apparatus, a novel plastic ring mould and penetration resistance meth... Hydration process, crack potential and setting time of concrete grade C30, C40 and C50 were monitored by using a non-contact electrical resistivity apparatus, a novel plastic ring mould and penetration resistance methods, respectively. The results show the highest resistivity of C30 at the early stage until a point when C50 accelerated and overtook the others. It has been experimentally confirmed that the crossing point of C30 and C50 corresponds to the final setting time of C50. From resistivity derivative curve, four different stages were observed upon which the hydration process is classified; these are dissolution, induction, acceleration and deceleration periods. Consequently, restrained shrinkage crack and setting time results demonstrated that C50 set and cracked the earliest. The cracking time of all the samples occurred within a reasonable experimental period thus the novel plastic ring is a convenient method for predicting concrete's crack potential. The highest inflection time(t_i) obtained from resistivity curve and the final setting time(t_f) were used with crack time(t_c) in coming up with mathematical models for the prediction of concrete's cracking age for the range of concrete grade considered. Finally, an ANSYS numerical simulation supports the experimental findings in terms of the earliest crack age of C50 and the crack location. 展开更多
关键词 concrete electrical resistivity restrained shrinkage crack setting time finite element simulation
下载PDF
Effect of Pulse Parameters on Deposition in Concrete Crack using Pulse Current Electro-deposition
15
作者 储洪强 WANG Tingting +4 位作者 JIANG Linhua XU Yi SONG Zijian XU Ning ZHAO Sujing 《Journal of Wuhan University of Technology(Materials Science)》 SCIE EI CAS 2018年第4期908-914,共7页
To evaluate the effect of pulse parameters on the formation of electrodeposits in concrete cracks, five different types of pulse current were set up, and ZnSO_4 and MgSO_4 solutions were used as the electrolytes. The ... To evaluate the effect of pulse parameters on the formation of electrodeposits in concrete cracks, five different types of pulse current were set up, and ZnSO_4 and MgSO_4 solutions were used as the electrolytes. The rate of weight gain, rate of surface coating, rate of crack closure and crack filling depth were measured. Scanning electron microscopy was used to assess the morphology of the electrodeposits, and energy dispersive spectroscopy was used to analyze the mineral composition of the electrodeposits in the cracks. The experimental results demonstrate that, among five different pulse parameters, when T_(on)/T_(off)=0.8 ms/0.8 ms, the healing effect of electro-deposition is the best. The pulse mode hardly affects the mineral composition of the electrodeposits but changes the micromorphology. In addition, for both ZnSO_4 and MgSO_4 solutions, when T_(on)/T_(off)=0.8 ms/0.8 ms, the crystal structure of the electrodeposits is the most uniform and the densest. 展开更多
关键词 pulse electro-deposition repair of concrete cracks pulse parameters healing effect
下载PDF
Motion Planning of Concrete Pump Truck with End-Effector's Specified Path
16
作者 王欣 金辉 +3 位作者 吴迪 曹旭阳 明书君 孙吉胜 《Journal of Donghua University(English Edition)》 EI CAS 2016年第1期1-7,共7页
For motion planning of concrete pump truck( CPT) with end-effector's hosepipe path, this paper sets up the mathematic model,including definition of its motion planning,description of its state in C space( configur... For motion planning of concrete pump truck( CPT) with end-effector's hosepipe path, this paper sets up the mathematic model,including definition of its motion planning,description of its state in C space( configuration space) and its path length. An advanced rapidly-exploring random trees( RRT) algorithm is proposed, in which each tracing point dispersed from the end hosepipe path can map multi-states of CPT so as to make variety of motion path of CPT. For increasing search efficiency and motion path quality,this algorithm generates any random states of CPT in certain probability to trend to the initial state or target state mapped with the end hosepipe path,and to have the least cost between this random state and its parent state. A typical case and two special cases are analyzed in which the end hosepipe paths are reciprocating linear trajectory and planar or spatial sine curves respectively. Their results verify the feasibility and validity of the proposed algorithm. 展开更多
关键词 concrete pump truck(CPT) path planning rapidly-exploring random trees(RRT)
下载PDF
Lifetime Reliability Analysis of Flexural Cracking for Prestressed Concrete Bridge
17
作者 童育强 向天宇 +2 位作者 杜斌 袁新朋 赵人达 《Journal of Southwest Jiaotong University(English Edition)》 2009年第3期207-211,共5页
Time-dependant reliability is analyzed for the flexural cracking of prestressed concrete bridges under service limit state. The limit state function and random variables are derived from Chinese highway bridge design ... Time-dependant reliability is analyzed for the flexural cracking of prestressed concrete bridges under service limit state. The limit state function and random variables are derived from Chinese highway bridge design specifications. For deterioration of structural performances, chloride-induced reinforcement corrosion is emphasized. Through integrating first order reliability method (FORM) and time discretized approach, the time-variant reliability is evaluated. For illustrative propose, the reliability of a typical simply supported prestressed concrete beam is exemplified. 展开更多
关键词 Prestressed concrete bridge RELIABILITY Service limit state Flexural cracking
下载PDF
Characterisation of Bacteria⁃Based Concrete Crack Rejuvenation by Externally Applied Repair
18
作者 Jie Yuan Xin Chen +2 位作者 Mohamed Alazhari Bo Yang Guorong Zhang 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2020年第4期20-30,共11页
Microbiologically⁃induced calcite⁃precipitation(MICP)has been increasingly studied in structural repair including self⁃healing and external applications.Among various MICP pathways,enzymatic urea hydrolysis is suggest... Microbiologically⁃induced calcite⁃precipitation(MICP)has been increasingly studied in structural repair including self⁃healing and external applications.Among various MICP pathways,enzymatic urea hydrolysis is suggested to be applied as external repair instead of self⁃healing.This study comprehensively characterised the enzymatic urea hydrolysis pathway in physical,impermeable,and mechanical rejuvenation of concrete cracks.The visual quality of repaired structures was presented,and the importance of humidity in the remediation of cracks was demonstrated.Moreover,this study investigated the differences in the effectiveness of repair between premixing bacteria with urea and without any premixing.With premixing,there was a concern that the accelerated reactions would precipitate calcite in the shallow spaces of the cracks and impede deeper healing.However,the observed results indicated that neither physical nor impermeable rejuvenation of concrete cracks repair would be detrimentally affected.The results obtained from this study will allow further development in commercialisation since the effectiveness of repair has been confirmed with an improvement in its efficiency. 展开更多
关键词 concrete crack REJUVENATION BACTERIA repair agent relative humidity IMPERMEABILITY chloride penetration flexural strength
下载PDF
Simulation of the Cracking and Ablation Behavior of Ferrosiliceous and Siliceous Nuclear Sacrificial Concretes
19
作者 蒋金洋 YU Yingjun +3 位作者 CHU Hongyan SUN Wei GAO Yun SHE Wei 《Journal of Wuhan University of Technology(Materials Science)》 SCIE EI CAS 2016年第5期982-988,共7页
We investigated the simulation of the cracking and ablation behavior of ferro-siliceous and siliceous nuclear sacrificial concretes. To this end, four type of sacrificial concretes were fabricated, i e, the ferro-sili... We investigated the simulation of the cracking and ablation behavior of ferro-siliceous and siliceous nuclear sacrificial concretes. To this end, four type of sacrificial concretes were fabricated, i e, the ferro-siliceous(F) and siliceous(S) plain concretes, and the polypropylene fiber reinforced concretes of the above two(FF, SF). The cracking and ablation behaviors of the sacrificial concretes were investigated by simulation tests, and the simulated elevated temperature was obtained by means of thermite powder. The number and the width of the cracks were compared and the pore size distribution of sacrificial concretes was measured. In addition, the interface and chemical composition of melt at different positions were analyzed, and the ablation depth of the sacrificial concrete crucibles was also measured. It was found that the siliceous concrete shows to be more prone to cracking than the ferro-siliceous concrete due to the higher content of fly ash and lower water to binder ratio; though the ablation depth of siliceous concrete is found to be slightly larger, no clear difference can be detected for the basemat ablation rate. 展开更多
关键词 sacrificial concrete cracking ablation MCCI high temperature
下载PDF
On the treatment of thermal cracks in lining concrete of water conveyance system of Three Gorges Project permanent ship locks
20
作者 王从锋 刘德富 +1 位作者 王东东 段亚辉 《Journal of Coal Science & Engineering(China)》 2008年第1期54-57,共4页
A comprehensive investigation was performed for repairing the different types of cracks appearing on the surface or inside the concrete lining at various depths.The mate- rial properties used in grouting and two metho... A comprehensive investigation was performed for repairing the different types of cracks appearing on the surface or inside the concrete lining at various depths.The mate- rial properties used in grouting and two methods for crack repair were discussed in details, and consequently reliable repair measures were proposed and implemented.It is a better choice to adopt the hole-drilling method for the relatively regular crack.The grouting pres- sure should not be too high and it is generally between 0.4~0.6 MPa.For the second time grouting,the pressure maybe increased to 0.8 MPa.Other method is the pasting nozzles method which is more suitable for irregular cracks such as cracks with intensive density and crossing cracks.Its grouting pressure is generally between 0.6~1.0 MPa.The in-situ tests in Three Gorges Project demonstrate favorably the feasibility and applicability of the proposed methods for crack repair within the lining concrete. 展开更多
关键词 thermal cracks lining concrete Three Gorges Project permanent ship locks
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部