期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
A New Method of Transmission Network Flexible Planning Using the Connection Number
1
作者 金华征 程浩忠 《Journal of Shanghai Jiaotong university(Science)》 EI 2008年第4期436-442,共7页
Because connection number can express and process synthetic uncertainties caused by various uncertainties in the transmission network planning, a connection number model (CNM) was presented to compare the values of co... Because connection number can express and process synthetic uncertainties caused by various uncertainties in the transmission network planning, a connection number model (CNM) was presented to compare the values of connection number logically. This paper proposed a novel model for transmission network flexible planning with uncertainty. In the proposed planning model both certainty and uncertainty information were included, and the cost-benefit analysis method was used to evaluate the candidate schemes in the objective function. Its good adaptability and flexibility were illustrated through two examples. 展开更多
关键词 transmission network planning UNCERTAINTY flexible planning connection number connection number model (CNM) blind number
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部