Job shop scheduling has become the basis and core of advanced manufacturing technology. Various differences exist between academic research and practical production. The majority of previous researches on job shop sch...Job shop scheduling has become the basis and core of advanced manufacturing technology. Various differences exist between academic research and practical production. The majority of previous researches on job shop scheduling problem (JSSP)describe the basic production environment, which have a single objective and limited constraints. However,a practical process of production is characterized by having multiple objectives,no-wait constraint,and limited storage. Thus this research focused on multiobjective,no-wait JSSP. To analyze the problem,it was further divided into two sub-problems, namely, sequencing and timetabling. Hybrid non-order strategy and modified complete local search with memory were used to solve each problem individually. A Pareto-based strategy for performing fitness assessment was presented in this study. Various experiments on benchmark problems proved the feasibility and effectiveness of the proposed algorithm.展开更多
Electromagnetic detection satellite(EDS) is a type of Earth observation satellite(EOS). Satellites observation and data down-link scheduling plays a significant role in improving the efficiency of satellite observ...Electromagnetic detection satellite(EDS) is a type of Earth observation satellite(EOS). Satellites observation and data down-link scheduling plays a significant role in improving the efficiency of satellite observation systems. However, the current works mainly focus on the scheduling of imaging satellites, little work focuses on the scheduling of EDSes for its specific requirements.And current works mainly schedule satellite resources and data down-link resources separately, not considering them in a globally optimal perspective. The EDSes and data down-link resources are scheduled in an integrated process and the scheduling result is searched globally. Considering the specific constraints of EDS, a coordinate scheduling model for EDS observation tasks and data transmission jobs is established and an algorithm based on the genetic algorithm is proposed. Furthermore, the convergence of our algorithm is proved. To deal with some specific constraints, a solution repairing algorithm of polynomial computing time is designed. Finally, some experiments are conducted to validate the correctness and practicability of our scheduling algorithms.展开更多
This paper examines the yard truck scheduling,the yard location assignment for discharging containers,and the quay crane scheduling in container terminals.Taking into account the practical situation,we paid special at...This paper examines the yard truck scheduling,the yard location assignment for discharging containers,and the quay crane scheduling in container terminals.Taking into account the practical situation,we paid special attention to the loading and discharging precedence relationships between containers in the quay crane operations.A Mixed Integer Program(MIP) model is constructed,and a two-stage heuristic algorithm is proposed.In the first stage an Ant Colony Optimization(ACO) algorithm is employed to generate the yard location assignment for discharging containers.In the second stage,the integration of the yard truck scheduling and the quay crane scheduling is a flexible job shop problem,and an efficient greedy algorithm and a local search algorithm are proposed. Extensive numerical experiments are conducted to test the performance of the proposed algorithms.展开更多
基金National Natural Science Foundations of China(Nos.61174040,61573144,11304200)Shanghai Commission of Science and Technology,China(No.12JC1403400)+1 种基金Shanghai Municipal Education Commission for Training Young Teachers,China(No.ZZSDJ15031)Shanghai Teaching and Reforming Experimental Undergraduate Majors Construction Program,China
文摘Job shop scheduling has become the basis and core of advanced manufacturing technology. Various differences exist between academic research and practical production. The majority of previous researches on job shop scheduling problem (JSSP)describe the basic production environment, which have a single objective and limited constraints. However,a practical process of production is characterized by having multiple objectives,no-wait constraint,and limited storage. Thus this research focused on multiobjective,no-wait JSSP. To analyze the problem,it was further divided into two sub-problems, namely, sequencing and timetabling. Hybrid non-order strategy and modified complete local search with memory were used to solve each problem individually. A Pareto-based strategy for performing fitness assessment was presented in this study. Various experiments on benchmark problems proved the feasibility and effectiveness of the proposed algorithm.
基金supported by the National Natural Science Foundation of China(6110118461174159)
文摘Electromagnetic detection satellite(EDS) is a type of Earth observation satellite(EOS). Satellites observation and data down-link scheduling plays a significant role in improving the efficiency of satellite observation systems. However, the current works mainly focus on the scheduling of imaging satellites, little work focuses on the scheduling of EDSes for its specific requirements.And current works mainly schedule satellite resources and data down-link resources separately, not considering them in a globally optimal perspective. The EDSes and data down-link resources are scheduled in an integrated process and the scheduling result is searched globally. Considering the specific constraints of EDS, a coordinate scheduling model for EDS observation tasks and data transmission jobs is established and an algorithm based on the genetic algorithm is proposed. Furthermore, the convergence of our algorithm is proved. To deal with some specific constraints, a solution repairing algorithm of polynomial computing time is designed. Finally, some experiments are conducted to validate the correctness and practicability of our scheduling algorithms.
基金supported by the National Nature Science Foundation of China under grant no.71102011
文摘This paper examines the yard truck scheduling,the yard location assignment for discharging containers,and the quay crane scheduling in container terminals.Taking into account the practical situation,we paid special attention to the loading and discharging precedence relationships between containers in the quay crane operations.A Mixed Integer Program(MIP) model is constructed,and a two-stage heuristic algorithm is proposed.In the first stage an Ant Colony Optimization(ACO) algorithm is employed to generate the yard location assignment for discharging containers.In the second stage,the integration of the yard truck scheduling and the quay crane scheduling is a flexible job shop problem,and an efficient greedy algorithm and a local search algorithm are proposed. Extensive numerical experiments are conducted to test the performance of the proposed algorithms.