As the climate change signs become more noticeable, the concern to prioritize sustainability within the AEC industry intensifies. This particularly pertained to issues related to the demand of resources, the excessive...As the climate change signs become more noticeable, the concern to prioritize sustainability within the AEC industry intensifies. This particularly pertained to issues related to the demand of resources, the excessive consumption of raw materials, and the associated generated waste. Presently, the construction industry is ranked among the industries that are accountable for the global generation of solid waste and energy consumption, leading to detrimental environmental effects. Nonetheless, over the years, construction methods, technological innovations, and building practices have made considerable progress, influenced by a growing emphasis on sustainability, especially in energy conservation and in adopting the Industrialized Production layer of Construction 4.0 (i.e., modular prefabrication, 3D concrete printing, and BIM). The concept of Circular Economy (CE) has been identified as a potential solution to achieve sustainability in building construction through the design, construction, and end-of-life deconstruction processes that enhance the management of waste based on the framework that is related to reducing, reusing, and recycling. Moreover, information and data related to geolocation complement advanced digital technologies by providing a collaborative platform that supports the application of CE as a practical approach to sustainability. Thus, this study will provide a straightforward methodology for developing a model that integrates BIM and sustainable design with Circular Economy’s concept to enhance the sustainability of construction projects to minimize their waste based on various construction methods (i.e., conventional, modular, and 3D concrete printing). The proposed model interrelates tools and data for the evaluation and planning strategies for the construction and deconstruction waste (CDW) management at the design stage, including estimating the quantities of the wasted materials, quantifying the production rates of selected equipment for the waste handling (loading and hauling) at the various stages of a project as well their associated cost. The proposed model will help users to calculate the quantity of construction and deconstruction waste (CDW) during the design of buildings based on their different construction methods at the early stage by using the concept of Design for Deconstruction (DfD);sustainable construction methods;and deconstruction process for waste management, which will lead to the suitable construction method.展开更多
Rail transit is considered one of the safest and most efficient modes of transportation.Ticketing,vehicle dispatching,and passenger flow control during rail transit operations in China have been improving over the yea...Rail transit is considered one of the safest and most efficient modes of transportation.Ticketing,vehicle dispatching,and passenger flow control during rail transit operations in China have been improving over the years.Smart city construction and intelligent management models has also been increasingly emphasized with the rapid development of information and internet technology.Therefore,it is essential to conduct relevant research and discussions to improve the overall efficiency and quality of urban rail transit operation and management.This article provides an overview of smart city rail transit operation and management informatization,the principles of construction,and the functions of smart city rail transit operation and management informatization.Additionally,it discusses the strategies for the construction of smart city rail transit operation and management information and its development prospects.展开更多
The rapid development and popularization of Internet technology has provided important support for the informatization reform of various industries.University books and materials have the characteristics of large quan...The rapid development and popularization of Internet technology has provided important support for the informatization reform of various industries.University books and materials have the characteristics of large quantities and difficult storage and management.Its digital storage and management platform construction can effectively realize the digital storage and real-time retrieval of books and materials,and help students and teachers to find and use books and materials more quickly.Especially in recent years,with the update of intelligent platforms and other technologies,the resource-sharing platform of university books and materials can realize more convenient book information retrieval without the limitation of time and space.This paper mainly explores the optimization path and platform construction scheme of university libraries and information management under the background of the Internet,hoping to provide some theoretical references for university library managers.展开更多
The“one-stop”student community is an important component of the education system in the new era of universities,and is an important practical base for university students to carry out practical education and moral e...The“one-stop”student community is an important component of the education system in the new era of universities,and is an important practical base for university students to carry out practical education and moral education.However,the construction of student communities still faces practical problems such as insufficient strength and lack of effective support in the current education system.Therefore,building a reasonable“one-stop”student community operation mode and exploring effective practical methods are the key to promoting student growth and development,stimulating learning willingness,and enhancing service awareness.They are also a powerful development and key force for highquality construction of student communities and the effectiveness of university education.展开更多
Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of exp...Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely.展开更多
To solve the problem of delayed update of spectrum information(SI) in the database assisted dynamic spectrum management(DB-DSM), this paper studies a novel dynamic update scheme of SI in DB-DSM. Firstly, a dynamic upd...To solve the problem of delayed update of spectrum information(SI) in the database assisted dynamic spectrum management(DB-DSM), this paper studies a novel dynamic update scheme of SI in DB-DSM. Firstly, a dynamic update mechanism of SI based on spectrum opportunity incentive is established, in which spectrum users are encouraged to actively assist the database to update SI in real time. Secondly, the information update contribution(IUC) of spectrum opportunity is defined to describe the cost of accessing spectrum opportunity for heterogeneous spectrum users, and the profit of SI update obtained by the database from spectrum allocation. The process that the database determines the IUC of spectrum opportunity and spectrum user selects spectrum opportunity is mapped to a Hotelling model. Thirdly, the process of determining the IUC of spectrum opportunities is further modelled as a Stackelberg game by establishing multiple virtual spectrum resource providers(VSRPs) in the database. It is proved that there is a Nash Equilibrium in the game of determining the IUC of spectrum opportunities by VSRPs. Finally, an algorithm of determining the IUC based on a genetic algorithm is designed to achieve the optimal IUC. The-oretical analysis and simulation results show that the proposed method can quickly find the optimal solution of the IUC, and ensure that the spectrum resource provider can obtain the optimal profit of SI update.展开更多
BACKGROUND Nutritional support for patients hospitalized in the intensive care unit(ICU)is an important part of clinical treatment and care,but there are significant implementation difficulties.AIM To introduce a modi...BACKGROUND Nutritional support for patients hospitalized in the intensive care unit(ICU)is an important part of clinical treatment and care,but there are significant implementation difficulties.AIM To introduce a modified nutritional support management system for ICU patients based on closed-loop information management and psychological counseling.METHODS The division of functions,personnel training,system construction,development of an intelligent decision-making software system,quality control,and improvement of the whole process were carried out to systematically manage nutritional support for ICU patients.RESULTS Following the implementation of the whole process management system,the scores of ICU medical staff’s knowledge,attitudes/beliefs,and practices regarding nutritional support were comprehensively enhanced.The proportion of hospital bed-days of total enteral nutrition(EN)in ICU patients increased from 5.58%to 11.46%,and the proportion of EN plus parenteral nutrition increased from 42.71%to 47.07%.The rate of EN initiation within 48 h of ICU admission increased from 37.50%to 48.28%,and the EN compliance rate within 72 h elevated from 20.59%to 31.72%.After the implementation of the project,the Self-rating Anxiety Scale score decreased from 61.07±9.91 points to 52.03±9.02 points,the Self-rating Depression Scale score reduced from 62.47±10.50 points to 56.34±9.83 points,and the ICU stay decreased from 5.76±2.77 d to 5.10±2.12 d.CONCLUSION The nutritional support management system based on closed-loop information management and psychological counseling achieved remarkable results in clinical applications in ICU patients.展开更多
This study aims to determine the key and underlying Leadership and Top Management (LTM) factors that have a significant impact on sustaining the implementation of Total Quality Management (TQM) within the construction...This study aims to determine the key and underlying Leadership and Top Management (LTM) factors that have a significant impact on sustaining the implementation of Total Quality Management (TQM) within the construction industry in Ghana. The research methodology employed in this study was a quantitative technique. Questionnaires were distributed to 641 participants within construction industry in Ghana. Questionnaires retrieved for the analysis were 536. Three steps approached were used for the data analysis. These include Exploratory Factor Analysis (EFA), Confirmatory Factor Analysis (CFA), and Structural Equation Modeling (SEM) analysis. After conducting the EFA and CFA, SEM was also used to analyze the construct validity. The SEM analysis helps to determine four key indicator variables for the leadership and top management construct. These include Leadership/Top Management approach to employees’ management, Leadership/Top Management understanding of TQM, Leadership/Top Management empowerment of employees to resolve quality issues, and Leadership/Top Management endorsement of TQM. All the four indicator variables were found to be good of fit and closely associated with the dependent variable. The study adds to the body of knowledge by using EFA, CFA and SEM techniques to establish key leadership and top management factors affecting TQM implementation in Ghana’s construction industry. The findings in general suggested that leadership and top Management factors identified have a direct positive impact on sustaining TQM implementation in the Ghanaian construction industry. Consequently, the leadership and top management factors identified in this study can help improve TQM in the Ghanaian construction industry.展开更多
Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering ...Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering construction,the energy-saving properties of the building should also be considered.Therefore,a scientific management approach should be adopted to improve green building management.This paper primarily examines the importance of quality management in green building construction,along with the factors influencing it.It also identifies the quality issues present in current green building construction.Finally,it proposes measures for quality management in the green building construction process to facilitate the industry’s healthy development.展开更多
With the gradual acceleration of the urbanization process,the construction industry has been developing rapidly.As the key link to ensure the quality and safety of the project,construction management and construction ...With the gradual acceleration of the urbanization process,the construction industry has been developing rapidly.As the key link to ensure the quality and safety of the project,construction management and construction quality control are of great significance to enhance the competitiveness of construction enterprises and realize sustainable development.In this paper,the effective strategy of construction management and the effective strategy of construction quality control will be discussed in depth,aiming at providing useful management and quality control strategies for construction enterprises.展开更多
During the 13th Five-Year Plan period,to improve medical and health services,the Guangzhou Municipal government invested billions in medical construction.During that time,Guangzhou was renewing its approval procedures...During the 13th Five-Year Plan period,to improve medical and health services,the Guangzhou Municipal government invested billions in medical construction.During that time,Guangzhou was renewing its approval procedures for construction projects,and the COVID-19 outbreak changed the requirements of hospital construction.In addition to focusing more on spatial planning and layout,the integration of specialized departments,large-scale medical equipment,and numerous intelligent systems increased the complexity of hospital construction projects.The success of these projects often hinges on the quality of the management team.If a hospital construction project manager lacks experience and an understanding of the project’s key aspects,they may struggle with organization,management,and problem-solving,leading to rework,resource waste,and delays.This paper uses the construction of a new Guangzhou 12th People’s Hospital branch as an example to describe the key points and difficulties in each stage of project construction and proposes solutions for the management of similar projects in the future.展开更多
Life Cycle Cost Analysis (LCCA) provides a systematic approach to assess the total cost associated with owning, operating, and maintaining assets throughout their entire life. BIM empowers architects and designers to ...Life Cycle Cost Analysis (LCCA) provides a systematic approach to assess the total cost associated with owning, operating, and maintaining assets throughout their entire life. BIM empowers architects and designers to perform real-time evaluations to explore various design options. However, when integrated with LCCA, BIM provides a comprehensive economic perspective that helps stakeholders understand the long-term financial implications of design decisions. This study presents a methodology for developing a model that seamlessly integrates BIM and LCCA during the conceptual design stage of buildings. This integration allows for a comprehensive evaluation and analysis of the design process, ensuring that the development aligns with the principles of low carbon emissions by employing modular construction, 3D concrete printing methods, and different building design alternatives. The model considers the initial construction costs in addition to all the long-term operational, maintenance, and salvage values. It combines various tools and data through different modules, including energy analysis, Life Cycle Assessment (LCA), and Life Cycle Cost Analysis (LCCA) to execute a comprehensive assessment of the financial implications of a specific design option throughout the lifecycle of building projects. The development of the said model and its implementation involves the creation of a new plug-in for the BIM tool (i.e., Autodesk Revit) to enhance its functionalities and capabilities in forecasting the life-cycle costs of buildings in addition to generating associated cash flows, creating scenarios, and sensitivity analyses in an automatic manner. This model empowers designers to evaluate and justify their initial investments while designing and selecting potential construction methods for buildings, and enabling stakeholders to make informed decisions by assessing different design alternatives based on long-term financial considerations during the early stages of design.展开更多
Performance Management is the core course of human resource management major,but its knowledge points lack multi-dimensional correlations.There are problems such as scattered content and unclear system,and it is urgen...Performance Management is the core course of human resource management major,but its knowledge points lack multi-dimensional correlations.There are problems such as scattered content and unclear system,and it is urgent to reconstruct the content system of the course.Knowledge graph technology can integrate massive and scattered information into an organic structure through semantic correlation and reasoning.The application of knowledge graph to education and teaching can promote scientific and personalized teaching evaluation and better realize individualized teaching.This paper systematically combs the knowledge points of Performance Management course and forms a comprehensive knowledge graph.The knowledge point is associated with specific questions to form the problem map of the course,and then the knowledge point is further associated with the ability target to form the ability map of the course.Then,the knowledge point is associated with teaching materials,question bank and expansion resources to form a systematic teaching database,thereby giving the method of building the content system of Performance Management course based on the knowledge map.This research can be further extended to other core management courses to realize the deep integration of knowledge graph and teaching.展开更多
To further enhance the overall service quality of China’s hospitals and improve the trust of the majority of patients in hospitals,this paper takes intelligent hospital management as the object of study,analyzes the ...To further enhance the overall service quality of China’s hospitals and improve the trust of the majority of patients in hospitals,this paper takes intelligent hospital management as the object of study,analyzes the importance of electronic information engineering technology applied in hospital management,and discusses the specific application methods of electronic information engineering in hospital management.This aims the existing problems in the current hospital management,such as insufficient degree of informatization,data sharing difficulties,lack of professionals,etc.Corresponding improvement measures are proposed,including strengthening the construction of informatization,promoting data sharing,and cultivating professionals.It is hoped that this study will enable the majority of hospital managers to make better use of electronic information engineering technology to effectively solve the current problems faced by hospitals and to continuously improve the comprehensive competitiveness of China’s hospitals.展开更多
The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s...The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s economic benefits,minimize unnecessary costs,and provide decision-makers with a robust financial foundation.Additionally,implementing an effective cash flow control mechanism and conducting a comprehensive assessment of potential project risks can ensure financial stability and mitigate the risk of fund shortages.Developing a practical and feasible fundraising plan,along with stringent fund management practices,can prevent fund wastage and optimize fund utilization efficiency.These measures not only facilitate smooth project progression and improve project management efficiency but also enhance the project’s economic and social outcomes.展开更多
As a cultural concept refl ecting the relationship between humans and forests,forest culture plays an active role in sustainable forest management.Forest parks provide a wide range of ecosystem services essential for ...As a cultural concept refl ecting the relationship between humans and forests,forest culture plays an active role in sustainable forest management.Forest parks provide a wide range of ecosystem services essential for the sustainable development of society,and the relationships between forest culture,green construction and management of forest parks have practical signifi cance.This study aimed to understand the interaction and process of forest culture infl uencing green construction and management in forest parks with the models Knowledge-Attitude-Practice(KAP)and Theory of Planned Behavior(TPB)by proposing a theoretical model.Four hypotheses were tested using data collected from 193 forest park employees in Heilongjiang Province,China.Our results show that forest culture had a signifi cant infl uence on green construction and forest management.In addition,subjective norm and perceived behavioral control directly impacted behavior in green construction and management of the forest park,whereas attitude did not have an impact.Subjective norm had a direct eff ect on attitude.Results between constructs show that forest culture had an indirect eff ect on planning and construction,and on ecological and economic management.Consequently,it supported three of four hypotheses within the proposed model in determining the infl uence of forest culture on green construction and management.展开更多
The limitations of MARC and the advantages of applying XML in the library are analyzed. We also have made partial reconstruction to the existing Information Management System of the HIT library and implementation of t...The limitations of MARC and the advantages of applying XML in the library are analyzed. We also have made partial reconstruction to the existing Information Management System of the HIT library and implementation of the prototype system. This research work will significantly influence the coordination of international library resource databases and the achievement of global information sharing.展开更多
System-wide information management(SWIM)is a complex distributed information transfer and sharing system for the next generation of Air Transportation System(ATS).In response to the growing volume of civil aviation ai...System-wide information management(SWIM)is a complex distributed information transfer and sharing system for the next generation of Air Transportation System(ATS).In response to the growing volume of civil aviation air operations,users accessing different authentication domains in the SWIM system have problems with the validity,security,and privacy of SWIM-shared data.In order to solve these problems,this paper proposes a SWIM crossdomain authentication scheme based on a consistent hashing algorithm on consortium blockchain and designs a blockchain certificate format for SWIM cross-domain authentication.The scheme uses a consistent hash algorithm with virtual nodes in combination with a cluster of authentication centers in the SWIM consortium blockchain architecture to synchronize the user’s authentication mapping relationships between authentication domains.The virtual authentication nodes are mapped separately using different services provided by SWIM to guarantee the partitioning of the consistent hash ring on the consortium blockchain.According to the dynamic change of user’s authentication requests,the nodes of virtual service authentication can be added and deleted to realize the dynamic load balancing of cross-domain authentication of different services.Security analysis shows that this protocol can resist network attacks such as man-in-the-middle attacks,replay attacks,and Sybil attacks.Experiments show that this scheme can reduce the redundant authentication operations of identity information and solve the problems of traditional cross-domain authentication with single-point collapse,difficulty in expansion,and uneven load.At the same time,it has better security of information storage and can realize the cross-domain authentication requirements of SWIM users with low communication costs and system overhead.KEYWORDS System-wide information management(SWIM);consortium blockchain;consistent hash;cross-domain authentication;load balancing.展开更多
To guarantee a unified response to disasters, humanitarian organizations work together via the United Nations Office for the Coordination of Humanitarian Affairs (OCHA). Although the OCHA has made great strides to imp...To guarantee a unified response to disasters, humanitarian organizations work together via the United Nations Office for the Coordination of Humanitarian Affairs (OCHA). Although the OCHA has made great strides to improve its information management and increase the availability of accurate, real-time data for disaster and humanitarian response teams, significant gaps persist. There are inefficiencies in the emergency management of data at every stage of its lifecycle: collection, processing, analysis, distribution, storage, and retrieval. Disaster risk reduction and disaster risk management are the two main tenets of the United Nations’ worldwide plan for disaster management. Information systems are crucial because of the crucial roles they play in capturing, processing, and transmitting data. The management of information is seldom discussed in published works. The goal of this study is to employ qualitative research methods to provide insight by facilitating an expanded comprehension of relevant contexts, phenomena, and individual experiences. Humanitarian workers and OCHA staffers will take part in the research. The study subjects will be chosen using a random selection procedure. Online surveys with both closed- and open-ended questions will be used to compile the data. UN OCHA offers a structure for the handling of information via which all humanitarian actors may contribute to the overall response. This research will enable the UN Office for OCHA better gather, process, analyze, disseminate, store, and retrieve data in the event of a catastrophe or humanitarian crisis.展开更多
Objective To study how to improve and perfect the information platform and processing mechanism of drug shortages in China.Methods By searching the relevant policies from official websites of FDA,European Medicines Ag...Objective To study how to improve and perfect the information platform and processing mechanism of drug shortages in China.Methods By searching the relevant policies from official websites of FDA,European Medicines Agency(EMA),Health Canada(HC)and National Health Commission,the good experience of the United States,the European Union and Canada in the construction of information platform and processing mechanism of drug shortages was summarized for reference in China.Results and Conclusion China has initially established the processing mechanism of drug shortages,but the platform construction should be improved,and the information disclosure of drug shortages varies from province to province.We should improve the information platform of drug shortages,strengthen the disclosure and communication of information,enrich the processing tools and measures after the drug shortages occurs,and strengthen the cooperation with relevant associations and other non-governmental departments.展开更多
文摘As the climate change signs become more noticeable, the concern to prioritize sustainability within the AEC industry intensifies. This particularly pertained to issues related to the demand of resources, the excessive consumption of raw materials, and the associated generated waste. Presently, the construction industry is ranked among the industries that are accountable for the global generation of solid waste and energy consumption, leading to detrimental environmental effects. Nonetheless, over the years, construction methods, technological innovations, and building practices have made considerable progress, influenced by a growing emphasis on sustainability, especially in energy conservation and in adopting the Industrialized Production layer of Construction 4.0 (i.e., modular prefabrication, 3D concrete printing, and BIM). The concept of Circular Economy (CE) has been identified as a potential solution to achieve sustainability in building construction through the design, construction, and end-of-life deconstruction processes that enhance the management of waste based on the framework that is related to reducing, reusing, and recycling. Moreover, information and data related to geolocation complement advanced digital technologies by providing a collaborative platform that supports the application of CE as a practical approach to sustainability. Thus, this study will provide a straightforward methodology for developing a model that integrates BIM and sustainable design with Circular Economy’s concept to enhance the sustainability of construction projects to minimize their waste based on various construction methods (i.e., conventional, modular, and 3D concrete printing). The proposed model interrelates tools and data for the evaluation and planning strategies for the construction and deconstruction waste (CDW) management at the design stage, including estimating the quantities of the wasted materials, quantifying the production rates of selected equipment for the waste handling (loading and hauling) at the various stages of a project as well their associated cost. The proposed model will help users to calculate the quantity of construction and deconstruction waste (CDW) during the design of buildings based on their different construction methods at the early stage by using the concept of Design for Deconstruction (DfD);sustainable construction methods;and deconstruction process for waste management, which will lead to the suitable construction method.
文摘Rail transit is considered one of the safest and most efficient modes of transportation.Ticketing,vehicle dispatching,and passenger flow control during rail transit operations in China have been improving over the years.Smart city construction and intelligent management models has also been increasingly emphasized with the rapid development of information and internet technology.Therefore,it is essential to conduct relevant research and discussions to improve the overall efficiency and quality of urban rail transit operation and management.This article provides an overview of smart city rail transit operation and management informatization,the principles of construction,and the functions of smart city rail transit operation and management informatization.Additionally,it discusses the strategies for the construction of smart city rail transit operation and management information and its development prospects.
文摘The rapid development and popularization of Internet technology has provided important support for the informatization reform of various industries.University books and materials have the characteristics of large quantities and difficult storage and management.Its digital storage and management platform construction can effectively realize the digital storage and real-time retrieval of books and materials,and help students and teachers to find and use books and materials more quickly.Especially in recent years,with the update of intelligent platforms and other technologies,the resource-sharing platform of university books and materials can realize more convenient book information retrieval without the limitation of time and space.This paper mainly explores the optimization path and platform construction scheme of university libraries and information management under the background of the Internet,hoping to provide some theoretical references for university library managers.
基金2023 Research Project on“Cultivating Virtue and Talents”at Xi'an Shiyou University(LD202312),2023 Excellent Student Work Project of Xi'an Shiyou University(XJYB202303).
文摘The“one-stop”student community is an important component of the education system in the new era of universities,and is an important practical base for university students to carry out practical education and moral education.However,the construction of student communities still faces practical problems such as insufficient strength and lack of effective support in the current education system.Therefore,building a reasonable“one-stop”student community operation mode and exploring effective practical methods are the key to promoting student growth and development,stimulating learning willingness,and enhancing service awareness.They are also a powerful development and key force for highquality construction of student communities and the effectiveness of university education.
文摘Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely.
文摘To solve the problem of delayed update of spectrum information(SI) in the database assisted dynamic spectrum management(DB-DSM), this paper studies a novel dynamic update scheme of SI in DB-DSM. Firstly, a dynamic update mechanism of SI based on spectrum opportunity incentive is established, in which spectrum users are encouraged to actively assist the database to update SI in real time. Secondly, the information update contribution(IUC) of spectrum opportunity is defined to describe the cost of accessing spectrum opportunity for heterogeneous spectrum users, and the profit of SI update obtained by the database from spectrum allocation. The process that the database determines the IUC of spectrum opportunity and spectrum user selects spectrum opportunity is mapped to a Hotelling model. Thirdly, the process of determining the IUC of spectrum opportunities is further modelled as a Stackelberg game by establishing multiple virtual spectrum resource providers(VSRPs) in the database. It is proved that there is a Nash Equilibrium in the game of determining the IUC of spectrum opportunities by VSRPs. Finally, an algorithm of determining the IUC based on a genetic algorithm is designed to achieve the optimal IUC. The-oretical analysis and simulation results show that the proposed method can quickly find the optimal solution of the IUC, and ensure that the spectrum resource provider can obtain the optimal profit of SI update.
基金Supported by Research Project of Zhejiang Provincial Department of Education,No.Y202045115.
文摘BACKGROUND Nutritional support for patients hospitalized in the intensive care unit(ICU)is an important part of clinical treatment and care,but there are significant implementation difficulties.AIM To introduce a modified nutritional support management system for ICU patients based on closed-loop information management and psychological counseling.METHODS The division of functions,personnel training,system construction,development of an intelligent decision-making software system,quality control,and improvement of the whole process were carried out to systematically manage nutritional support for ICU patients.RESULTS Following the implementation of the whole process management system,the scores of ICU medical staff’s knowledge,attitudes/beliefs,and practices regarding nutritional support were comprehensively enhanced.The proportion of hospital bed-days of total enteral nutrition(EN)in ICU patients increased from 5.58%to 11.46%,and the proportion of EN plus parenteral nutrition increased from 42.71%to 47.07%.The rate of EN initiation within 48 h of ICU admission increased from 37.50%to 48.28%,and the EN compliance rate within 72 h elevated from 20.59%to 31.72%.After the implementation of the project,the Self-rating Anxiety Scale score decreased from 61.07±9.91 points to 52.03±9.02 points,the Self-rating Depression Scale score reduced from 62.47±10.50 points to 56.34±9.83 points,and the ICU stay decreased from 5.76±2.77 d to 5.10±2.12 d.CONCLUSION The nutritional support management system based on closed-loop information management and psychological counseling achieved remarkable results in clinical applications in ICU patients.
文摘This study aims to determine the key and underlying Leadership and Top Management (LTM) factors that have a significant impact on sustaining the implementation of Total Quality Management (TQM) within the construction industry in Ghana. The research methodology employed in this study was a quantitative technique. Questionnaires were distributed to 641 participants within construction industry in Ghana. Questionnaires retrieved for the analysis were 536. Three steps approached were used for the data analysis. These include Exploratory Factor Analysis (EFA), Confirmatory Factor Analysis (CFA), and Structural Equation Modeling (SEM) analysis. After conducting the EFA and CFA, SEM was also used to analyze the construct validity. The SEM analysis helps to determine four key indicator variables for the leadership and top management construct. These include Leadership/Top Management approach to employees’ management, Leadership/Top Management understanding of TQM, Leadership/Top Management empowerment of employees to resolve quality issues, and Leadership/Top Management endorsement of TQM. All the four indicator variables were found to be good of fit and closely associated with the dependent variable. The study adds to the body of knowledge by using EFA, CFA and SEM techniques to establish key leadership and top management factors affecting TQM implementation in Ghana’s construction industry. The findings in general suggested that leadership and top Management factors identified have a direct positive impact on sustaining TQM implementation in the Ghanaian construction industry. Consequently, the leadership and top management factors identified in this study can help improve TQM in the Ghanaian construction industry.
文摘Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering construction,the energy-saving properties of the building should also be considered.Therefore,a scientific management approach should be adopted to improve green building management.This paper primarily examines the importance of quality management in green building construction,along with the factors influencing it.It also identifies the quality issues present in current green building construction.Finally,it proposes measures for quality management in the green building construction process to facilitate the industry’s healthy development.
文摘With the gradual acceleration of the urbanization process,the construction industry has been developing rapidly.As the key link to ensure the quality and safety of the project,construction management and construction quality control are of great significance to enhance the competitiveness of construction enterprises and realize sustainable development.In this paper,the effective strategy of construction management and the effective strategy of construction quality control will be discussed in depth,aiming at providing useful management and quality control strategies for construction enterprises.
文摘During the 13th Five-Year Plan period,to improve medical and health services,the Guangzhou Municipal government invested billions in medical construction.During that time,Guangzhou was renewing its approval procedures for construction projects,and the COVID-19 outbreak changed the requirements of hospital construction.In addition to focusing more on spatial planning and layout,the integration of specialized departments,large-scale medical equipment,and numerous intelligent systems increased the complexity of hospital construction projects.The success of these projects often hinges on the quality of the management team.If a hospital construction project manager lacks experience and an understanding of the project’s key aspects,they may struggle with organization,management,and problem-solving,leading to rework,resource waste,and delays.This paper uses the construction of a new Guangzhou 12th People’s Hospital branch as an example to describe the key points and difficulties in each stage of project construction and proposes solutions for the management of similar projects in the future.
文摘Life Cycle Cost Analysis (LCCA) provides a systematic approach to assess the total cost associated with owning, operating, and maintaining assets throughout their entire life. BIM empowers architects and designers to perform real-time evaluations to explore various design options. However, when integrated with LCCA, BIM provides a comprehensive economic perspective that helps stakeholders understand the long-term financial implications of design decisions. This study presents a methodology for developing a model that seamlessly integrates BIM and LCCA during the conceptual design stage of buildings. This integration allows for a comprehensive evaluation and analysis of the design process, ensuring that the development aligns with the principles of low carbon emissions by employing modular construction, 3D concrete printing methods, and different building design alternatives. The model considers the initial construction costs in addition to all the long-term operational, maintenance, and salvage values. It combines various tools and data through different modules, including energy analysis, Life Cycle Assessment (LCA), and Life Cycle Cost Analysis (LCCA) to execute a comprehensive assessment of the financial implications of a specific design option throughout the lifecycle of building projects. The development of the said model and its implementation involves the creation of a new plug-in for the BIM tool (i.e., Autodesk Revit) to enhance its functionalities and capabilities in forecasting the life-cycle costs of buildings in addition to generating associated cash flows, creating scenarios, and sensitivity analyses in an automatic manner. This model empowers designers to evaluate and justify their initial investments while designing and selecting potential construction methods for buildings, and enabling stakeholders to make informed decisions by assessing different design alternatives based on long-term financial considerations during the early stages of design.
基金Education and Teaching Reform Research Project of Chongqing Institute of Engineering(JY2023206)。
文摘Performance Management is the core course of human resource management major,but its knowledge points lack multi-dimensional correlations.There are problems such as scattered content and unclear system,and it is urgent to reconstruct the content system of the course.Knowledge graph technology can integrate massive and scattered information into an organic structure through semantic correlation and reasoning.The application of knowledge graph to education and teaching can promote scientific and personalized teaching evaluation and better realize individualized teaching.This paper systematically combs the knowledge points of Performance Management course and forms a comprehensive knowledge graph.The knowledge point is associated with specific questions to form the problem map of the course,and then the knowledge point is further associated with the ability target to form the ability map of the course.Then,the knowledge point is associated with teaching materials,question bank and expansion resources to form a systematic teaching database,thereby giving the method of building the content system of Performance Management course based on the knowledge map.This research can be further extended to other core management courses to realize the deep integration of knowledge graph and teaching.
文摘To further enhance the overall service quality of China’s hospitals and improve the trust of the majority of patients in hospitals,this paper takes intelligent hospital management as the object of study,analyzes the importance of electronic information engineering technology applied in hospital management,and discusses the specific application methods of electronic information engineering in hospital management.This aims the existing problems in the current hospital management,such as insufficient degree of informatization,data sharing difficulties,lack of professionals,etc.Corresponding improvement measures are proposed,including strengthening the construction of informatization,promoting data sharing,and cultivating professionals.It is hoped that this study will enable the majority of hospital managers to make better use of electronic information engineering technology to effectively solve the current problems faced by hospitals and to continuously improve the comprehensive competitiveness of China’s hospitals.
文摘The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s economic benefits,minimize unnecessary costs,and provide decision-makers with a robust financial foundation.Additionally,implementing an effective cash flow control mechanism and conducting a comprehensive assessment of potential project risks can ensure financial stability and mitigate the risk of fund shortages.Developing a practical and feasible fundraising plan,along with stringent fund management practices,can prevent fund wastage and optimize fund utilization efficiency.These measures not only facilitate smooth project progression and improve project management efficiency but also enhance the project’s economic and social outcomes.
基金supported by the Natural Science Foundation of China(Grants No.71673136).
文摘As a cultural concept refl ecting the relationship between humans and forests,forest culture plays an active role in sustainable forest management.Forest parks provide a wide range of ecosystem services essential for the sustainable development of society,and the relationships between forest culture,green construction and management of forest parks have practical signifi cance.This study aimed to understand the interaction and process of forest culture infl uencing green construction and management in forest parks with the models Knowledge-Attitude-Practice(KAP)and Theory of Planned Behavior(TPB)by proposing a theoretical model.Four hypotheses were tested using data collected from 193 forest park employees in Heilongjiang Province,China.Our results show that forest culture had a signifi cant infl uence on green construction and forest management.In addition,subjective norm and perceived behavioral control directly impacted behavior in green construction and management of the forest park,whereas attitude did not have an impact.Subjective norm had a direct eff ect on attitude.Results between constructs show that forest culture had an indirect eff ect on planning and construction,and on ecological and economic management.Consequently,it supported three of four hypotheses within the proposed model in determining the infl uence of forest culture on green construction and management.
文摘The limitations of MARC and the advantages of applying XML in the library are analyzed. We also have made partial reconstruction to the existing Information Management System of the HIT library and implementation of the prototype system. This research work will significantly influence the coordination of international library resource databases and the achievement of global information sharing.
基金funded by the National Natural Science Foundation of China(62172418)the Joint Funds of the National Natural Science Foundation of China and the Civil Aviation Administration of China(U2133203)+1 种基金the Education Commission Scientific Research Project of Tianjin China(2022KJ081)the Open Fund of Key Laboratory of Civil Aircraft Airworthiness Technology(SH2021111907).
文摘System-wide information management(SWIM)is a complex distributed information transfer and sharing system for the next generation of Air Transportation System(ATS).In response to the growing volume of civil aviation air operations,users accessing different authentication domains in the SWIM system have problems with the validity,security,and privacy of SWIM-shared data.In order to solve these problems,this paper proposes a SWIM crossdomain authentication scheme based on a consistent hashing algorithm on consortium blockchain and designs a blockchain certificate format for SWIM cross-domain authentication.The scheme uses a consistent hash algorithm with virtual nodes in combination with a cluster of authentication centers in the SWIM consortium blockchain architecture to synchronize the user’s authentication mapping relationships between authentication domains.The virtual authentication nodes are mapped separately using different services provided by SWIM to guarantee the partitioning of the consistent hash ring on the consortium blockchain.According to the dynamic change of user’s authentication requests,the nodes of virtual service authentication can be added and deleted to realize the dynamic load balancing of cross-domain authentication of different services.Security analysis shows that this protocol can resist network attacks such as man-in-the-middle attacks,replay attacks,and Sybil attacks.Experiments show that this scheme can reduce the redundant authentication operations of identity information and solve the problems of traditional cross-domain authentication with single-point collapse,difficulty in expansion,and uneven load.At the same time,it has better security of information storage and can realize the cross-domain authentication requirements of SWIM users with low communication costs and system overhead.KEYWORDS System-wide information management(SWIM);consortium blockchain;consistent hash;cross-domain authentication;load balancing.
文摘To guarantee a unified response to disasters, humanitarian organizations work together via the United Nations Office for the Coordination of Humanitarian Affairs (OCHA). Although the OCHA has made great strides to improve its information management and increase the availability of accurate, real-time data for disaster and humanitarian response teams, significant gaps persist. There are inefficiencies in the emergency management of data at every stage of its lifecycle: collection, processing, analysis, distribution, storage, and retrieval. Disaster risk reduction and disaster risk management are the two main tenets of the United Nations’ worldwide plan for disaster management. Information systems are crucial because of the crucial roles they play in capturing, processing, and transmitting data. The management of information is seldom discussed in published works. The goal of this study is to employ qualitative research methods to provide insight by facilitating an expanded comprehension of relevant contexts, phenomena, and individual experiences. Humanitarian workers and OCHA staffers will take part in the research. The study subjects will be chosen using a random selection procedure. Online surveys with both closed- and open-ended questions will be used to compile the data. UN OCHA offers a structure for the handling of information via which all humanitarian actors may contribute to the overall response. This research will enable the UN Office for OCHA better gather, process, analyze, disseminate, store, and retrieve data in the event of a catastrophe or humanitarian crisis.
文摘Objective To study how to improve and perfect the information platform and processing mechanism of drug shortages in China.Methods By searching the relevant policies from official websites of FDA,European Medicines Agency(EMA),Health Canada(HC)and National Health Commission,the good experience of the United States,the European Union and Canada in the construction of information platform and processing mechanism of drug shortages was summarized for reference in China.Results and Conclusion China has initially established the processing mechanism of drug shortages,but the platform construction should be improved,and the information disclosure of drug shortages varies from province to province.We should improve the information platform of drug shortages,strengthen the disclosure and communication of information,enrich the processing tools and measures after the drug shortages occurs,and strengthen the cooperation with relevant associations and other non-governmental departments.