期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Power Sources Planning, Construction and Operation
1
《Electricity》 2001年第3期26-40,共15页
关键词 construction and operation Power Sources Planning
下载PDF
Synchronous Construction and Operation of Coal Mine and Power Plant in Mining Area
2
作者 Zheng Yonglian (Diector ,Power under Yongxia Area Management Committee ,Henan)Wang Jiawer (Yongxia Mining Area Management Committee ,Henan) 《China Coal》 1997年第S1期34-35,共2页
In accordance with the experience withSynchronous construction of coal mine andpower plant in Yongxia mining area, thispaper discusses the existing issues regardingmine mouth power plant including capital,power grid c... In accordance with the experience withSynchronous construction of coal mine andpower plant in Yongxia mining area, thispaper discusses the existing issues regardingmine mouth power plant including capital,power grid connection, electricity price for gridconnection, installed capacity generation setselection as well as self- protection of coalindustry. It is regarded that under marketeconomy as long as the benefits of the threesectors of coal, electricity and the local arecomprehensively considered, a suitable waycan be arrived for conl industry to operate electricity business. 展开更多
关键词 Synchronous construction and operation of Coal Mine and Power Plant in Mining Area
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部