According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio...According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,展开更多
In the 21st century, especially after the accession to WTO, Construction project bidding price formation mechanism is the main characteristics of the market price of the Construction project is divided in a unified, u...In the 21st century, especially after the accession to WTO, Construction project bidding price formation mechanism is the main characteristics of the market price of the Construction project is divided in a unified, uniform measurement unit, unified in terms of engineering and consumption of fixed rules on the basis of the implementation of market, competition fees.The first to be carried out not only the financial decision-making, corporate contractors in accordance with the different ways, according to market conditions, its technology, economic strength, through the financial decision-making self-quotation. Second, it is necessary to exercise effective control, both the Construction project bidding price by the form of the contract price is fixed.By design, material procurement, construction management on the implementation of bidding for the effective control of prices.展开更多
In 1997, the Ohio Senate passed Senate Bill 102 which established the Ohio School Facilities Commission as a separate agency to oversee the rebuilding projects of the public schools in Ohio. The bill also exempted the...In 1997, the Ohio Senate passed Senate Bill 102 which established the Ohio School Facilities Commission as a separate agency to oversee the rebuilding projects of the public schools in Ohio. The bill also exempted the construction contractors from paying prevailing wages on these projects on the hypothesis that this exemption would lower the construction cost. The purpose of this study is to investigate this hypothesis through the statistical analysis of 8,093 bids received from the years 2000 through 2007 for the schools' construction. Union contractors who paid their workers union wages and non-union contractors who did not pay prevailing wages bid these projects. The hypothesis, that prevailing wage laws increased the construction cost, was tested by comparing the bids/SF (square foot) from both groups (union and nonunion) for the different construction trades. The study indicated that there was statistical significant difference between the bids/square foot for union contractors and the bids/square foot for non-union contractors for only the following trades: earthwork, existing conditions, plumbing, electrical and HVAC (heating, ventilation and air conditioning). The averages of bids/SF from the union contractors were higher than those from the non-union contractors for earthwork, existing conditions and plumbing works, and the opposite for electrical and HVAC works. There was no statistical significant difference in the bids from the communications, concrete, conveying equipment, electronic safety and security, equipment, finishes, fire suppression, furnishings, masonry, openings, structural steel, thermal and moisture protection, plastics and composites and wood works.展开更多
基金supported by the National Science and Technology Plan of China (Major Project of the Eleventh Five-Year Plan, Grant No. 2006BAB04A13)the Philosophy and Social Science Fund of Education Department of Jiangsu Province (Grant No. 07SJD630006)+1 种基金the Third Key Discipline (Techno-Economics and Management) of the Project 211the Key Disciplines of Jiangsu Province (Engineering and Project Management)
文摘According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,
文摘In the 21st century, especially after the accession to WTO, Construction project bidding price formation mechanism is the main characteristics of the market price of the Construction project is divided in a unified, uniform measurement unit, unified in terms of engineering and consumption of fixed rules on the basis of the implementation of market, competition fees.The first to be carried out not only the financial decision-making, corporate contractors in accordance with the different ways, according to market conditions, its technology, economic strength, through the financial decision-making self-quotation. Second, it is necessary to exercise effective control, both the Construction project bidding price by the form of the contract price is fixed.By design, material procurement, construction management on the implementation of bidding for the effective control of prices.
文摘In 1997, the Ohio Senate passed Senate Bill 102 which established the Ohio School Facilities Commission as a separate agency to oversee the rebuilding projects of the public schools in Ohio. The bill also exempted the construction contractors from paying prevailing wages on these projects on the hypothesis that this exemption would lower the construction cost. The purpose of this study is to investigate this hypothesis through the statistical analysis of 8,093 bids received from the years 2000 through 2007 for the schools' construction. Union contractors who paid their workers union wages and non-union contractors who did not pay prevailing wages bid these projects. The hypothesis, that prevailing wage laws increased the construction cost, was tested by comparing the bids/SF (square foot) from both groups (union and nonunion) for the different construction trades. The study indicated that there was statistical significant difference between the bids/square foot for union contractors and the bids/square foot for non-union contractors for only the following trades: earthwork, existing conditions, plumbing, electrical and HVAC (heating, ventilation and air conditioning). The averages of bids/SF from the union contractors were higher than those from the non-union contractors for earthwork, existing conditions and plumbing works, and the opposite for electrical and HVAC works. There was no statistical significant difference in the bids from the communications, concrete, conveying equipment, electronic safety and security, equipment, finishes, fire suppression, furnishings, masonry, openings, structural steel, thermal and moisture protection, plastics and composites and wood works.