期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Evaluation of Common Delay Causes of Construction Projects in Singapore
1
《Journal of Civil Engineering and Architecture》 2011年第11期1027-1034,共8页
The objectives of this paper were to identify and evaluating the common delay factors among owners, consultants and main contractors in building projects in Singapore. The interview and questionnaire method were used ... The objectives of this paper were to identify and evaluating the common delay factors among owners, consultants and main contractors in building projects in Singapore. The interview and questionnaire method were used in this research. Randomly distributed questionnaire technique was applied to select samples of 74 various construction practitioners consisting of owners, consultants and main contractors to evaluat the severity of the 35 identified delay factors. The project investigated in this study included residential building and office building projects. The results found that delay in progress payment by owner, adverse weather conditions, main contractor financial problems, evaluation of completed works and act of god factor caused mostly severe delay in building construction project. 展开更多
关键词 construction delays building construction Singapore.
下载PDF
Analysing Delay Impact from Potential Risk Factors on Project Delivery of Oil and Gas Pipeline:A Case Study in IRAQ
2
作者 LAYTH KRAIDI RAJ SHAH +1 位作者 WILFRED MATIPA FIONA BORTHWICK 《Journal of Construction Research》 2020年第2期42-55,共14页
The aim of this paper is to present the design and specifications of an integrated Delay Analysis Framework(DAF),which could be used to quantify the delay caused by the Risk Factors(RFs)in Oil and Gas Pipelines(OGPs)p... The aim of this paper is to present the design and specifications of an integrated Delay Analysis Framework(DAF),which could be used to quantify the delay caused by the Risk Factors(RFs)in Oil and Gas Pipelines(OGPs)projects in a simple and systematic way.The main inputs of the DAF are(i)the potential list of RFs in the projects and their impact levels on the projects and the estimated maximum and minimum duration of each task.Monte Carlo Simulation integrated within@Risk simulator was the key process algorithm that used to quantify the impact of delay caused by the associated RFs.The key output of the DAF is the amount of potential delay caused by RFs in the OGP project.The functionalities of the developed DAF were evaluated using a case study of newly developed OGP project,in the south of Iraq.It is found that the case study project might have delayed by 45 days if neglected the consideration of the RFs associated with the project at the construction stage.The paper concludes that identifying the associated RFs and analysing the potential delay in advance will help in reducing the construction delay and improving the effectiveness of the project delivery by taking suitable risk mitigation measures. 展开更多
关键词 Oil and gas pipelines Risk factors Risk analyses delay analysis framework @Risk Monte carlo simulation construction delay Time impact
下载PDF
Bending behavior of double-row stabilizing piles with constructional time delay 被引量:11
3
作者 Yang YU Yue-quan SHANG Hong-yue SUN 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2012年第8期596-609,共14页
The bending behavior of double-row stabilizing plies is associated with the constructional time delay(CTD),which can be defined as the time interval between the installations of the front stabilizing pile and the rear... The bending behavior of double-row stabilizing plies is associated with the constructional time delay(CTD),which can be defined as the time interval between the installations of the front stabilizing pile and the rear stabilizing pile.This paper investigates the effect of CTD on the bending moments of double-row stabilizing piles and a method for determining the optimal CTD is proposed.The stabilizing pile is modeled as a cantilever pile embedded in the Winkler elastic foundation.A triangular distributed earth pressure is assumed on the pile segment in the sliding layer.The front stabilizing pile and the rear stabilizing pile are connected by a beam with pinned joints.The analytical solutions of bending moments on the front and the rear stabilizing piles are derived and the accuracy of bending moment solutions is validated by comparing the tensile strain measured from the Hongyan landslide project,Taizhou,Zhejiang,China.It is concluded that CTD has a significant influence on the bending moments of double-row stabilizing piles.An optimal CTD can be obtained when the maximum tensile stress in the front stabilizing pile is equal to that in the rear stabilizing pile,which is 1.4 months for the Hongyan landslide project. 展开更多
关键词 Subgrade reaction LANDSLIDE Stabilizing pile constructional time delay (CTD) Bending moment
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部