Municipal civil engineering is the key content of municipal construction,and the construction scale is usually large.The quality of the project plays an important role in the development of urban economy.Due to the ra...Municipal civil engineering is the key content of municipal construction,and the construction scale is usually large.The quality of the project plays an important role in the development of urban economy.Due to the rapid increase of high-rise buildings,skyscrapers and underground buildings,the construction technology of deep foundation pit support has gradually become an indispensable construction technology.Therefore,the selection of foundation pit support construction technology is crucial in ensuring that whether the foundation is firm and stable,and whether the subsequent construction activities can be carried out smoothly.In view of this,the article discusses the application of deep foundation pit support construction technology in municipal civil engineering,aiming to provide reference for subsequent projects.展开更多
Deep foundation pit excavation is a basic and key step involved in modern building construction.In order to ensure the construction quality and safety of deep foundation pits,this paper takes a project as an example t...Deep foundation pit excavation is a basic and key step involved in modern building construction.In order to ensure the construction quality and safety of deep foundation pits,this paper takes a project as an example to analyze deep foundation pit excavation technology,including the nature of this construction project,the main technical measures in the construction of deep foundation pit,and the analysis of the safety risk prevention and control measures.The purpose of this analysis is to provide scientific reference for the construction quality and safety of deep foundation pits.展开更多
The spatial and temporal deformation patterns and deformation control indicators of highfill foundations directly affect the design,construction and operational safety of high-fill projects.In situ monitoring can comp...The spatial and temporal deformation patterns and deformation control indicators of highfill foundations directly affect the design,construction and operational safety of high-fill projects.In situ monitoring can comprehensively reflect the deformation of high-fill during and after construction.In this paper,we have first designed and installed an integrated wireless remote monitoring system for high-fill to achieve real-time dynamic monitoring of settlement,pore water pressure and soil pressure of the fill foundation.Based on the monitoring results of nearly one year of the construction period and two years after construction,it was found that the deformation amount and deformation rate of the high-fill foundation showed a non-linear growth relationship with the filling rate and filling height.The settlement deformation of the high-fill foundation during the loading period was mainly dominated by the original foundation soil,accounting for 54.4%of the total settlement on average;the settlement deformation during the post-construction period was mainly dominated by the filling body,accounting for 77.04%of the total settlement on average,and the settlement deformation during the post-construction period mainly occurred in the first year after construction.The analysis of the deformation mechanism suggests that the deformation of the filling body is dominated by exhaust consolidation during the loading period and drainage consolidation during the post-construction period;the deformation of the original foundation soil is dominated by drainage consolidation during the loading period and drainage consolidation develops slowly during the post-construction period.It is recommended that the original foundation should be reinforced before the large area filling construction,and that the filling rate should be strictly controlled during construction.The research results can provide a scientific basis for deformation calculation and stability assessment of high-fill foundations.展开更多
为探究地铁深基坑施工安全风险因素动态作用规律,科学预防施工安全事故,针对目前缺乏因素系统识别、因果关系量化和动态推理分析等共性问题,提出一种基于决策试验和评估实验室(Decision Making Trial and Evaluation Laboratory DEMATEL...为探究地铁深基坑施工安全风险因素动态作用规律,科学预防施工安全事故,针对目前缺乏因素系统识别、因果关系量化和动态推理分析等共性问题,提出一种基于决策试验和评估实验室(Decision Making Trial and Evaluation Laboratory DEMATEL)与模糊认知图(Fuzzy Cognitive Map,FCM)的地铁深基坑施工安全风险分析方法。首先,通过理论分析与文献梳理,采用扎根理论识别风险因素;其次,结合专家调研与量化分析,利用DEMATEL方法分析风险因素的因果关系;再次,将DEMATAL决策矩阵转化为FCM模型的交互作用矩阵,展开风险因素的预测与诊断推理分析;最后,选取案例进行实证,验证模型方法的可用性与有效性。结果显示:因素X_(1)(人员安全风险意识)对其他因素的影响程度最高;因素X_(1)(人员安全风险意识)、X_(8)(安全施工组织设计方案)和X_(7)(施工安全风险管理措施)是排名前3的关键风险因素;完善安全施工组织设计方案是最有效的管控对策。展开更多
文摘Municipal civil engineering is the key content of municipal construction,and the construction scale is usually large.The quality of the project plays an important role in the development of urban economy.Due to the rapid increase of high-rise buildings,skyscrapers and underground buildings,the construction technology of deep foundation pit support has gradually become an indispensable construction technology.Therefore,the selection of foundation pit support construction technology is crucial in ensuring that whether the foundation is firm and stable,and whether the subsequent construction activities can be carried out smoothly.In view of this,the article discusses the application of deep foundation pit support construction technology in municipal civil engineering,aiming to provide reference for subsequent projects.
文摘Deep foundation pit excavation is a basic and key step involved in modern building construction.In order to ensure the construction quality and safety of deep foundation pits,this paper takes a project as an example to analyze deep foundation pit excavation technology,including the nature of this construction project,the main technical measures in the construction of deep foundation pit,and the analysis of the safety risk prevention and control measures.The purpose of this analysis is to provide scientific reference for the construction quality and safety of deep foundation pits.
基金supported by the Youth Science and Technology Fund Program in Gansu Province(20JR5RA434 and 20JR10RA200)National Natural Science Foundation of China(52168051)+1 种基金Gansu Province University Innovation Fund Project(2020A031)Gansu Provincial Science and Technology Plan Fund Project(22CX8GA112)。
文摘The spatial and temporal deformation patterns and deformation control indicators of highfill foundations directly affect the design,construction and operational safety of high-fill projects.In situ monitoring can comprehensively reflect the deformation of high-fill during and after construction.In this paper,we have first designed and installed an integrated wireless remote monitoring system for high-fill to achieve real-time dynamic monitoring of settlement,pore water pressure and soil pressure of the fill foundation.Based on the monitoring results of nearly one year of the construction period and two years after construction,it was found that the deformation amount and deformation rate of the high-fill foundation showed a non-linear growth relationship with the filling rate and filling height.The settlement deformation of the high-fill foundation during the loading period was mainly dominated by the original foundation soil,accounting for 54.4%of the total settlement on average;the settlement deformation during the post-construction period was mainly dominated by the filling body,accounting for 77.04%of the total settlement on average,and the settlement deformation during the post-construction period mainly occurred in the first year after construction.The analysis of the deformation mechanism suggests that the deformation of the filling body is dominated by exhaust consolidation during the loading period and drainage consolidation during the post-construction period;the deformation of the original foundation soil is dominated by drainage consolidation during the loading period and drainage consolidation develops slowly during the post-construction period.It is recommended that the original foundation should be reinforced before the large area filling construction,and that the filling rate should be strictly controlled during construction.The research results can provide a scientific basis for deformation calculation and stability assessment of high-fill foundations.
文摘为探究地铁深基坑施工安全风险因素动态作用规律,科学预防施工安全事故,针对目前缺乏因素系统识别、因果关系量化和动态推理分析等共性问题,提出一种基于决策试验和评估实验室(Decision Making Trial and Evaluation Laboratory DEMATEL)与模糊认知图(Fuzzy Cognitive Map,FCM)的地铁深基坑施工安全风险分析方法。首先,通过理论分析与文献梳理,采用扎根理论识别风险因素;其次,结合专家调研与量化分析,利用DEMATEL方法分析风险因素的因果关系;再次,将DEMATAL决策矩阵转化为FCM模型的交互作用矩阵,展开风险因素的预测与诊断推理分析;最后,选取案例进行实证,验证模型方法的可用性与有效性。结果显示:因素X_(1)(人员安全风险意识)对其他因素的影响程度最高;因素X_(1)(人员安全风险意识)、X_(8)(安全施工组织设计方案)和X_(7)(施工安全风险管理措施)是排名前3的关键风险因素;完善安全施工组织设计方案是最有效的管控对策。