To treat the relationship between project construction and ecological environment and effectively prevent new soil erosion during the construction, according to the project layout, soil erosion distribution as well as...To treat the relationship between project construction and ecological environment and effectively prevent new soil erosion during the construction, according to the project layout, soil erosion distribution as well as natural and socio-economic conditions, the control measures of newly increased soil erosion along the project were carried out based on site survey and analysis of relevant information. In addition, adhering to the prin- ciple of partition prevention and treatment, some guiding prevention and control measures of the natural zone passed by the project and soil erosion control district were determined, which provided scientific references and technical support for the rational layout of water and soil conservation and ecological restoration measures in Dina 2 gas field.展开更多
In the research, problems and damages of soil erosions in West -East Natural Gas Transmission were analyzed; the reasons were summarized and the characteristics of soil erosion were researched in order to explore prin...In the research, problems and damages of soil erosions in West -East Natural Gas Transmission were analyzed; the reasons were summarized and the characteristics of soil erosion were researched in order to explore principles of pipeline prevention and seek countermeasures.展开更多
Being controlled by the gas content of the reservoir, the productivity of CBM well is also mainly determined by its engineering quality and the physical property of the reservoir. In Dafosi mine field, 22 vertical wel...Being controlled by the gas content of the reservoir, the productivity of CBM well is also mainly determined by its engineering quality and the physical property of the reservoir. In Dafosi mine field, 22 vertical wells from the “26 + 1” CBM wells project that was implemented since 2014 showed great difference in productivity after fracturing construction. With the consistent geological condition of coal reservoirs, fracturing construction parameters are suggested as the priority factor that controlling the well productivity. In this study, being combined with historical production and geological data, an optimized designation of fracturing construction parameters was established based on systematically comparative analysis of construction parameters such as discharge, the total volume of fracturing fluid, the quality of sand, sand ratio, which provides engineering basis for further fracturing construction of CBM wells.展开更多
文摘To treat the relationship between project construction and ecological environment and effectively prevent new soil erosion during the construction, according to the project layout, soil erosion distribution as well as natural and socio-economic conditions, the control measures of newly increased soil erosion along the project were carried out based on site survey and analysis of relevant information. In addition, adhering to the prin- ciple of partition prevention and treatment, some guiding prevention and control measures of the natural zone passed by the project and soil erosion control district were determined, which provided scientific references and technical support for the rational layout of water and soil conservation and ecological restoration measures in Dina 2 gas field.
基金Supported by Scientific Research Program of Water Resources Department of the Xinjiang Uygur Autonomous Region (xjsl-2011-11)Young Core Project of Northwest A&F University (KZCXI-10-4-1)~~
文摘In the research, problems and damages of soil erosions in West -East Natural Gas Transmission were analyzed; the reasons were summarized and the characteristics of soil erosion were researched in order to explore principles of pipeline prevention and seek countermeasures.
文摘Being controlled by the gas content of the reservoir, the productivity of CBM well is also mainly determined by its engineering quality and the physical property of the reservoir. In Dafosi mine field, 22 vertical wells from the “26 + 1” CBM wells project that was implemented since 2014 showed great difference in productivity after fracturing construction. With the consistent geological condition of coal reservoirs, fracturing construction parameters are suggested as the priority factor that controlling the well productivity. In this study, being combined with historical production and geological data, an optimized designation of fracturing construction parameters was established based on systematically comparative analysis of construction parameters such as discharge, the total volume of fracturing fluid, the quality of sand, sand ratio, which provides engineering basis for further fracturing construction of CBM wells.