This paper aims to present a comprehensive proposal for project scheduling and control by applying fuzzy earned value.It goes a step further than the existing literature:in the formulation of the fuzzy earned value we...This paper aims to present a comprehensive proposal for project scheduling and control by applying fuzzy earned value.It goes a step further than the existing literature:in the formulation of the fuzzy earned value we consider not only its duration,but also cost and production,and alternatives in the scheduling between the earliest and latest times.The mathematical model is implemented in a prototypical construction project with all the estimated values taken as fuzzy numbers.Our findings suggest that different possible schedules and the fuzzy arithmetic provide more objective results in uncertain environments than the traditional methodology.The proposed model allows for controlling the vagueness of the environment through the adjustment of the α-cut,adapting it to the specific circumstances of the project.展开更多
基金Project partially supported by the Spanish Ministry of Science and Innovation (No.BIA2011-23602)the European Community with the European Regional Development Fund (FEDER),Spain
文摘This paper aims to present a comprehensive proposal for project scheduling and control by applying fuzzy earned value.It goes a step further than the existing literature:in the formulation of the fuzzy earned value we consider not only its duration,but also cost and production,and alternatives in the scheduling between the earliest and latest times.The mathematical model is implemented in a prototypical construction project with all the estimated values taken as fuzzy numbers.Our findings suggest that different possible schedules and the fuzzy arithmetic provide more objective results in uncertain environments than the traditional methodology.The proposed model allows for controlling the vagueness of the environment through the adjustment of the α-cut,adapting it to the specific circumstances of the project.