期刊文献+
共找到2,884篇文章
< 1 2 145 >
每页显示 20 50 100
Model for Bidding and Tendering with Bill of Quantities Based on Bid-Winning Estimate at Reasonable Low Price 被引量:2
1
作者 宋吉荣 钟胜 郭耀煌 《Journal of Southwest Jiaotong University(English Edition)》 2006年第4期387-393,共7页
The possibility and rationality of introducing an bid-winning estimate based on a reasonable low price into construction bidding mode with bill of quantities were analyzed by setting up a model for bidding and tenderi... The possibility and rationality of introducing an bid-winning estimate based on a reasonable low price into construction bidding mode with bill of quantities were analyzed by setting up a model for bidding and tendering, and the functions of the estimate of reasonable low price in the bidding were revealed. On this basis, a new bidding mode of the project with bill of quantities was pro- posed. The application of the new mode will be advantageous to the promotion of the bill of quantities in China. 展开更多
关键词 Bill of quantifies Reasonable low price Model for bidding and tendering
下载PDF
Penalty model for delay of bidding section construction period in South-to-North Water Diversion Eastern Route Project from perspective of programs 被引量:2
2
作者 Jing-chun FENG Ya-fang REN +2 位作者 Zhong-nan DUAN Zhan-jun LIU Hai-yang LI 《Water Science and Engineering》 EI CAS 2012年第3期350-360,共11页
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio... According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably, 展开更多
关键词 program establishment program management bidding section construction period critical path method (CPM) penaly model South-to-North Water Diversion Project
下载PDF
Synthetic Evaluation on Decision of Public Bidding for Construction Project
3
作者 孙涛 颜秋许 《Journal of China University of Mining and Technology》 2002年第1期48-51,56,共5页
Public bidding is the international current practice to contract construction project. But the decision on the bidding often is made according to the qualitative evaluation based on the subjective opinion of specialis... Public bidding is the international current practice to contract construction project. But the decision on the bidding often is made according to the qualitative evaluation based on the subjective opinion of specialists. Therefore, the fuzzy mathematics principle was applied and a synthetic evaluation model was established to provide an effective method for the development of quantitative bidding decision in this paper. 展开更多
关键词 construction project public bidding DECISION evaluation method
下载PDF
Construction Project Bidding Prices and Price Control Mechanism
4
作者 Rongfeng Mo 《International English Education Research》 2014年第10期65-67,共3页
In the 21st century, especially after the accession to WTO, Construction project bidding price formation mechanism is the main characteristics of the market price of the Construction project is divided in a unified, u... In the 21st century, especially after the accession to WTO, Construction project bidding price formation mechanism is the main characteristics of the market price of the Construction project is divided in a unified, uniform measurement unit, unified in terms of engineering and consumption of fixed rules on the basis of the implementation of market, competition fees.The first to be carried out not only the financial decision-making, corporate contractors in accordance with the different ways, according to market conditions, its technology, economic strength, through the financial decision-making self-quotation. Second, it is necessary to exercise effective control, both the Construction project bidding price by the form of the contract price is fixed.By design, material procurement, construction management on the implementation of bidding for the effective control of prices. 展开更多
关键词 construction project bidding prices Price control mechanism.
下载PDF
Analysis of Existing Problems with Management of Construction Projects Bidding and Solutions to the Problems
5
作者 Meili Wu 《Journal of Architectural Research and Development》 2021年第2期30-33,共4页
Bidding is a key link during the implementation of a construction project.For the same construction project,there are usually multiple construction companies bidding together to obtain the right to contract for the pr... Bidding is a key link during the implementation of a construction project.For the same construction project,there are usually multiple construction companies bidding together to obtain the right to contract for the project.However,there are still various irregularities in the bidding stage.This article analyzed the above problems and proposed a management strategy for the optimization of bidding,looking forward to improving the quality of bidding management of construction projects,solving various illegal bidding problems,and purifying the environment of bidding management. 展开更多
关键词 construction engineering bidding management PROBLEMS SOLUTIONS
下载PDF
Computer Aided Call for Tenders: A Tool for Software Bidding
6
作者 Jorge Hochstetter Carlos Cares 《Journal of Software Engineering and Applications》 2014年第7期592-601,共10页
Under a broad comprehension of Software Engineering, it is preferred the term software life cycle instead of just software production. The reason is that cycle starts at software conception and stops when the software... Under a broad comprehension of Software Engineering, it is preferred the term software life cycle instead of just software production. The reason is that cycle starts at software conception and stops when the software is relegated. Given contemporary companies’ market strategies of focusing on their competitive advantages, most of them have externalized their software production to outsourced services. Therefore, the call for software tenders has become a common step in the software life cycle. In this paper, we present a tool which aids non-experts to specify call for software tenders. The motivation was Chile situation of most of rural and semi-urban city halls which do not have engineering teams to build call for software tenders. We describe the problem in terms of lack of competitiveness and empty biddings generated by low quality calls for tenders. As a second step, we show the technical considerations to develop the proposed tool and its features. We include an initial tool perception from a first group of users. 展开更多
关键词 CALL for tenders SOFTWARE bidding Requirements SPECIFICATIONS SOFTWARE OUTSOURCING
下载PDF
Impact of Prevailing Wages on the Cost among the Various Construction Trades
7
作者 Alan Atalah 《Journal of Civil Engineering and Architecture》 2013年第6期670-676,共7页
In 1997, the Ohio Senate passed Senate Bill 102 which established the Ohio School Facilities Commission as a separate agency to oversee the rebuilding projects of the public schools in Ohio. The bill also exempted the... In 1997, the Ohio Senate passed Senate Bill 102 which established the Ohio School Facilities Commission as a separate agency to oversee the rebuilding projects of the public schools in Ohio. The bill also exempted the construction contractors from paying prevailing wages on these projects on the hypothesis that this exemption would lower the construction cost. The purpose of this study is to investigate this hypothesis through the statistical analysis of 8,093 bids received from the years 2000 through 2007 for the schools' construction. Union contractors who paid their workers union wages and non-union contractors who did not pay prevailing wages bid these projects. The hypothesis, that prevailing wage laws increased the construction cost, was tested by comparing the bids/SF (square foot) from both groups (union and nonunion) for the different construction trades. The study indicated that there was statistical significant difference between the bids/square foot for union contractors and the bids/square foot for non-union contractors for only the following trades: earthwork, existing conditions, plumbing, electrical and HVAC (heating, ventilation and air conditioning). The averages of bids/SF from the union contractors were higher than those from the non-union contractors for earthwork, existing conditions and plumbing works, and the opposite for electrical and HVAC works. There was no statistical significant difference in the bids from the communications, concrete, conveying equipment, electronic safety and security, equipment, finishes, fire suppression, furnishings, masonry, openings, structural steel, thermal and moisture protection, plastics and composites and wood works. 展开更多
关键词 Prevailing wages UNION NON-UNION construction bids construction trades.
下载PDF
Thinking substation construction project management methods
8
作者 HU Wenmin 《International English Education Research》 2015年第10期21-23,共3页
One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical e... One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical engineering and civil construction, engineering, quality control, safety management and supervision costs control, on-site supervision over the links, these links chain, indivisible, so long as a part of the management problems, will lead the entire construction project management effectiveness be affected, so it must be every link control and management work done, in order to guarantee the quality of the entire substation, in order to make security of supply substations, electrical safety and vital interests of users are protected. In this paper, the author details the three aspects substation construction management of the project, namely the concept of substation engineering, project management and construction safety, through these three aspects, the author analyzes the construction project management substation existing problems, To solve these problems and issues proposed some measures and construction process that need attention. It launched separately from the design, schedule, quality and other aspects of security and research, and in the course of the study stressed the importance of coordination between elements of construction and construction sectors as well as cooperation between the construction, explains the importance of the project cost control. 展开更多
关键词 SUBSTATIONS construction project management cost control bidding civil engineering
下载PDF
tender(bid)用法小议
9
作者 丁玉玲 《语言教育》 1996年第7期48-49,共2页
tender(bid)可用作名词或动词,表示“投标”或“招标”,是国际贸易中常见的一种贸易形式。它常用在国家政府机构、国营企业或公用事业单位采购物资、器材或设备的交易中.更多地用于国际承包工程。在美国通常用 bid,而在英国则多用 tende... tender(bid)可用作名词或动词,表示“投标”或“招标”,是国际贸易中常见的一种贸易形式。它常用在国家政府机构、国营企业或公用事业单位采购物资、器材或设备的交易中.更多地用于国际承包工程。在美国通常用 bid,而在英国则多用 tender。现将 tender(bid)的一些常用方法分述如下: 展开更多
关键词 tender bid 国际承包工程 公用事业单位 贸易形式 政府机构 采购物资 投标人 投标价格 中标人
下载PDF
A Bidding Model for Construction Price Preparation 被引量:1
10
作者 YANG Lan\|rong,\ LU Yao\|bin,\ ZHANG Jin\|long College of Management Huazhong University of Science and Technology Hubei,China 《Systems Science and Systems Engineering》 CSCD 2000年第1期56-60,共5页
Estimation of the price of a contract project is an important task of the construction bidding price. The quality of construction management depends on accurate estimation. This paper presents a bidding model for cons... Estimation of the price of a contract project is an important task of the construction bidding price. The quality of construction management depends on accurate estimation. This paper presents a bidding model for construction bidding price preparation in a competitive bidding environment. The bidding price for a new project is prepared by using a library of data containing rate, quality and data for the elements of previous completed projects. The data of previous completed projects is used to prepare the bidding price of a new project. Three bivariate treatments are used to model the data of rate vs quality. 展开更多
关键词 bidding construction price preparation
原文传递
Detection Tool for Unbalanced Bids
11
作者 Babak Nikpour Ahmed Senouci Neil Eldin 《Open Journal of Civil Engineering》 2017年第3期409-422,共14页
Unbalanced bidding is a cash flow management strategy that is recognized as an illegal/disqualifying practice by public owners;and unethical practice by most private owners. This practice provides the awarded bidder w... Unbalanced bidding is a cash flow management strategy that is recognized as an illegal/disqualifying practice by public owners;and unethical practice by most private owners. This practice provides the awarded bidder with unjustified advantages at the expense of the owner. Unfortunately, limited tools and techniques are currently available to identify and detect unbalanced bids during the evaluation process. This paper presents an innovative detection tool to identify unbalanced bids in unit price contracts during the bid evaluation process. The proposed technique develops BMDI graphs to visualize total markup variation patterns during the project lifetime to detect unbalanced bids. The proposed method also uses Monte Carlo simulation to take in consideration the impact of cost uncertainties and risks. An illustrative example was presented to show the capabilities and features of the proposed method in determining the status of submitted bids during the evaluation process. 展开更多
关键词 Unbalanced bidding DETECTION bid Evaluation construction PROJECTS Mon-te-Carlo Simulation
下载PDF
E-Tendering Process Within Construction:A UK Perspective
12
作者 Geoff Tindsley Paul Stephenson 《Tsinghua Science and Technology》 SCIE EI CAS 2008年第S1期273-278,共6页
E-tendering can be defined as the issue and receipt of tender documentation through electronic means which facilitates the procurement of construction work and the award of contracts. The current paper-based method of... E-tendering can be defined as the issue and receipt of tender documentation through electronic means which facilitates the procurement of construction work and the award of contracts. The current paper-based method of tendering has been commonplace within the industry for a significant number of years, but with recent technological advancements, this traditional process is rapidly becoming outdated. Several major projects within the UK are now being procured through the e-tendering process which includes the multibillion pound development for the Olympic Games in London 2012. However, while these prestigious projects are embracing e-tendering technology, it is not certain as to what extent e-tendering is used across the construction sector generally. This research is primarily concerned with establishing the current status, practicalities and resource effectiveness of e-tendering within UK construction. Results are provided from an in-dustry survey which includes both quantitative and qualitative data. A case study implementation is also in-cluded which assesses the utilisation of e-tendering software in practice. The research findings indicated that e-tendering can provide substantial resource savings to a major part of the supply chain, with the key benefits being enhanced communication, time savings and reduced costs. However, a considerable proportion of the industry remains uncertain about embracing new technologies, with reluctance to change being perceived as the greatest barrier. The findings suggest that many professionals within the UK construction industry recognise a requirement for increased implementation of e-tendering, but feel that training, education and support from senior management are essential requirements for e-tendering to become widely accepted in the future. 展开更多
关键词 construction project data electronic communications E-tendering
原文传递
新业态下建设工程评标典型问题与对策研究
13
作者 陈舒 《建筑经济》 2024年第2期19-24,共6页
本文通过梳理近两年政府采购投诉处理案例,探讨了建设工程评标中“允许实质性响应细微偏差澄清”“对否决投标条款外的异常内容未作审查”“不平衡报价直接作废标处理”以及“更改不合理的评分办法”四类突出典型问题,通过分析其表现形... 本文通过梳理近两年政府采购投诉处理案例,探讨了建设工程评标中“允许实质性响应细微偏差澄清”“对否决投标条款外的异常内容未作审查”“不平衡报价直接作废标处理”以及“更改不合理的评分办法”四类突出典型问题,通过分析其表现形式,援引相关法律法规,提出规范的评标处理建议。 展开更多
关键词 建设工程 评标 规范性
下载PDF
面向招投标阶段的BIM技术理论与实践研究
14
作者 陈红杰 李高锋 +3 位作者 郭红军 林宗煦 李子悦 陈震震 《价值工程》 2024年第30期94-97,共4页
伴随着计算机行业的进步和国家政策的支持,建筑工程招投标的内容和形式发生了很大变化。在招标文件的技术标中加入了BIM技术的应用,改变了传统的以“文本”为主的投标方式,要求以直观、生动的BIM模型及衍生文件为主的投标模式。在投标... 伴随着计算机行业的进步和国家政策的支持,建筑工程招投标的内容和形式发生了很大变化。在招标文件的技术标中加入了BIM技术的应用,改变了传统的以“文本”为主的投标方式,要求以直观、生动的BIM模型及衍生文件为主的投标模式。在投标过程中,投标方由于对BIM技术的理解和应用不足,导致对BIM技术标的编制流程不清晰,针对这一问题,提出BIM技术标的解决方案。 展开更多
关键词 工程招投标 BIM技术 施工组织
下载PDF
融合行业信息案例的“建设工程招投标与合同管理实务”课程改革探究
15
作者 王冠 《吉林省教育学院学报》 2024年第8期14-18,共5页
作为工程管理类专业中必修的专业课程,“建设工程招投标与合同管理实务”知识在各大工程项目中都有所应用。但由于此课程天然存在知识驳杂、文本量大、理论多、政策更新快等特征,因此在实践教学中该课程的教学难度很大,学生的学习兴趣... 作为工程管理类专业中必修的专业课程,“建设工程招投标与合同管理实务”知识在各大工程项目中都有所应用。但由于此课程天然存在知识驳杂、文本量大、理论多、政策更新快等特征,因此在实践教学中该课程的教学难度很大,学生的学习兴趣也相对较差。本文围绕将行业信息案例融合“建设工程招投标与合同管理实务”课程的具体方法进行探讨分析,意在借用职业资格考试的教学内容,解决传统教材更新较慢的问题,并拓展教师的知识储备,借助行业真实工作案例,利用信息技术创建工程招投标案例数据库,为教学过程提供更多实践机会,研究表明,该方法对于学生的课堂表现和最终成绩都有着良好的效果,具备大范围推广的条件。 展开更多
关键词 行业信息案例 建设工程招投标与合同管理实务 课程改革
下载PDF
招标文件与投标文件实质性不一致以投标文件为准的法律分析 被引量:1
16
作者 齐亮 肖可义 《唐山师范学院学报》 2024年第2期133-136,共4页
为了规范招标投标活动,确保工程质量,保护各方当事人的合法权益,根据有关法律,对于招标文件和投标文件实质性不一致应该如何处理的方法进行了法律分析,认为在招标文件与投标文件实质性不一致时应以投标文件为准。
关键词 招标文件 投标文件 实质性不一致 法律分析
下载PDF
工程招投标存在的问题及对策 被引量:1
17
作者 徐国产 高菁 《工程技术研究》 2024年第3期158-160,共3页
在建设项目管理中,招投标管理工作是一项十分重要的内容,如果在招投标过程中出现了问题,势必影响工程建设质量。文章通过分析工程招投标的意义及存在的问题,探讨了工程招投标问题的对策,如完善招投标管理相关法律法规、严格规范招投标... 在建设项目管理中,招投标管理工作是一项十分重要的内容,如果在招投标过程中出现了问题,势必影响工程建设质量。文章通过分析工程招投标的意义及存在的问题,探讨了工程招投标问题的对策,如完善招投标管理相关法律法规、严格规范招投标工作程序、夯实建设单位招投标管理工作基础等,以推进建设项目招投标工作的规范化和科学化开展,更好地服务于建设单位。 展开更多
关键词 工程招投标 招投标管理 招投标制度 建设项目
下载PDF
国有企业招投标合规管理研究 被引量:1
18
作者 孙若萱 江哲 +1 位作者 赵倩 顾向一 《市场周刊》 2024年第2期24-27,共4页
招投标作为国有企业重要的经营活动之一,也是违规行为多发的领域,有必要重点加强合规管理。国有企业招投标常见的违规情形包括规避招标、相互串通、违规组建或调整评标委员会等。因此,国有企业需要健全招投标规定,加强人员培训;政府要... 招投标作为国有企业重要的经营活动之一,也是违规行为多发的领域,有必要重点加强合规管理。国有企业招投标常见的违规情形包括规避招标、相互串通、违规组建或调整评标委员会等。因此,国有企业需要健全招投标规定,加强人员培训;政府要加大指导和监管力度,以提高国有企业招投标合规管理水平,助力国有企业规范经营。 展开更多
关键词 国有企业 招投标 合规管理
下载PDF
阴阳合同与合同变更的区分及适用——以《民法典合同编通则解释》第14条为中心 被引量:1
19
作者 吴光荣 《中国应用法学》 CSSCI 2024年第1期28-40,共13页
阴阳合同是当事人以虚假意思表示隐藏真实意思表示的行为,应依据《民法典》第146条分别认定阳合同与阴合同的效力。《招标投标法》第46条第1款第二句旨在限制当事人对中标合同的变更,其适用以中标合同有效为前提。因此,为落实该规定而... 阴阳合同是当事人以虚假意思表示隐藏真实意思表示的行为,应依据《民法典》第146条分别认定阳合同与阴合同的效力。《招标投标法》第46条第1款第二句旨在限制当事人对中标合同的变更,其适用以中标合同有效为前提。因此,为落实该规定而制定的司法解释也应仅适用于合同变更,而非阴阳合同。在阴阳合同的场合,阳合同因不是当事人真实意思表示而无效,但阴合同则应依据所规避的法律来认定其效力。当事人通过合同变更规避招投标程序,应认为当事人对实质性内容的变更无效,但客观原因引起的合同变更除外;在判断是否为实质性内容的变更时,也要注意量变和质变的辩证关系。《民法典合同编通则解释》第14条在区分阴阳合同和合同变更的基础上,就二者的法律适用问题作出了明确规定。 展开更多
关键词 《民法典合同编通则解释》 阴阳合同 合同变更 建设工程合同 招投标
下载PDF
建筑工程招标主要程序及管理要点分析 被引量:1
20
作者 陆伟 《工程建设与设计》 2024年第12期227-229,共3页
研究了建筑工程招标主要程序及管理要点,从准备工作、发布公告、发售文件、开标、评标、定标、签订合同等方面出发,分析了建筑工程招标的主要流程,同时,强调了计量与计价管理、评价指标体系管理、违法违规行为管理等控制措施,有利于降... 研究了建筑工程招标主要程序及管理要点,从准备工作、发布公告、发售文件、开标、评标、定标、签订合同等方面出发,分析了建筑工程招标的主要流程,同时,强调了计量与计价管理、评价指标体系管理、违法违规行为管理等控制措施,有利于降低招标风险,提升招标质量和效率。 展开更多
关键词 建筑工程 招标程序 管理要点 工程招标
下载PDF
上一页 1 2 145 下一页 到第
使用帮助 返回顶部