Being different from testing for popular GUI software, the “instruction-category” approach is proposed for testing embedded system. This approach is constructed by three steps including refining items, drawing instr...Being different from testing for popular GUI software, the “instruction-category” approach is proposed for testing embedded system. This approach is constructed by three steps including refining items, drawing instruction-brief and instruction-category, and constructing test suite. Consequently, this approach is adopted to test oven embedded system, and detail process is deeply discussed. As a result, the factual result indicates that the “instruction-category” approach can be effectively applied in embedded system testing as a black-box method for conformity testing.展开更多
In this paper, the test suite construction for GUI (Graphical User Interface) software may be executed centered on grey-box approach with the prior test design of window access controls for unit testing, including fro...In this paper, the test suite construction for GUI (Graphical User Interface) software may be executed centered on grey-box approach with the prior test design of window access controls for unit testing, including front-end method of white box and follow-up black box method for integration testing. Moreover, two key opinions are proposed for the test suite construction for GUI software, the first one is that the “Triple-step method” should be used for unit testing with the prior disposing of data boundary value testing of input controls, and another one is that the “Grey-box approach” should be applied in integration testing for GUI software with necessary testing preparation in the precondition. At the same time, the testing of baseline version and the incremental testing should be considered for the test case construction to coordinate with the whole evolution of software product today. Additionally, all our opinion and thought are verified and tested with a typical case of GUI software—PQMS (Product Quality Monitoring Software/System), and results indicate that these methods and specific disposing are practical and effective.展开更多
The construction of the UHVAC test base of SGCC is an important component of the pilot project on UHVAC power transmission and transformation in China. This paper introduces the layout, technical requirements and main...The construction of the UHVAC test base of SGCC is an important component of the pilot project on UHVAC power transmission and transformation in China. This paper introduces the layout, technical requirements and main test functions of the UHVAC test base as well as difficulties during construction. It lays stress on the characterization of a 1 000-kV single-circuit test line, a 1 000-kV one-tower double-circuit test line, a full voltage test site for UHV equipment, a climate laboratory, a corona cage and a long-wave-front impulse voltage generator.展开更多
文摘Being different from testing for popular GUI software, the “instruction-category” approach is proposed for testing embedded system. This approach is constructed by three steps including refining items, drawing instruction-brief and instruction-category, and constructing test suite. Consequently, this approach is adopted to test oven embedded system, and detail process is deeply discussed. As a result, the factual result indicates that the “instruction-category” approach can be effectively applied in embedded system testing as a black-box method for conformity testing.
文摘In this paper, the test suite construction for GUI (Graphical User Interface) software may be executed centered on grey-box approach with the prior test design of window access controls for unit testing, including front-end method of white box and follow-up black box method for integration testing. Moreover, two key opinions are proposed for the test suite construction for GUI software, the first one is that the “Triple-step method” should be used for unit testing with the prior disposing of data boundary value testing of input controls, and another one is that the “Grey-box approach” should be applied in integration testing for GUI software with necessary testing preparation in the precondition. At the same time, the testing of baseline version and the incremental testing should be considered for the test case construction to coordinate with the whole evolution of software product today. Additionally, all our opinion and thought are verified and tested with a typical case of GUI software—PQMS (Product Quality Monitoring Software/System), and results indicate that these methods and specific disposing are practical and effective.
文摘The construction of the UHVAC test base of SGCC is an important component of the pilot project on UHVAC power transmission and transformation in China. This paper introduces the layout, technical requirements and main test functions of the UHVAC test base as well as difficulties during construction. It lays stress on the characterization of a 1 000-kV single-circuit test line, a 1 000-kV one-tower double-circuit test line, a full voltage test site for UHV equipment, a climate laboratory, a corona cage and a long-wave-front impulse voltage generator.