期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Analysis of Roadbed Splicing at Hub Interchanges
1
作者 Lizhao Zhao Liang Liu 《Journal of World Architecture》 2024年第1期24-30,共7页
This article discusses the roadbed splicing for hub interchanges.The article starts with a description of the characteristics of junction roadbed splicing.The application of splicing technology is explained using a su... This article discusses the roadbed splicing for hub interchanges.The article starts with a description of the characteristics of junction roadbed splicing.The application of splicing technology is explained using a subgrade splicing scheme of a project.Roadbed splicing involves stepwise excavation and preparative measures like surface cleaning and backfilling.This article serves to provide a valuable reference for road and bridge construction and improve the quality of China’s road and bridge projects,so as to achieve sustainable development of the road and bridge engineering industry. 展开更多
关键词 Hub interchange Roadbed splicing Construction preparation Stepwise excavation Roadbed filling
下载PDF
A Bidding Model for Construction Price Preparation 被引量:1
2
作者 YANG Lan\|rong,\ LU Yao\|bin,\ ZHANG Jin\|long College of Management Huazhong University of Science and Technology Hubei,China 《Systems Science and Systems Engineering》 CSCD 2000年第1期56-60,共5页
Estimation of the price of a contract project is an important task of the construction bidding price. The quality of construction management depends on accurate estimation. This paper presents a bidding model for cons... Estimation of the price of a contract project is an important task of the construction bidding price. The quality of construction management depends on accurate estimation. This paper presents a bidding model for construction bidding price preparation in a competitive bidding environment. The bidding price for a new project is prepared by using a library of data containing rate, quality and data for the elements of previous completed projects. The data of previous completed projects is used to prepare the bidding price of a new project. Three bivariate treatments are used to model the data of rate vs quality. 展开更多
关键词 BIDDING construction price preparation
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部