Research for the steelmaking and continuous-casting scheduling model algorithm and system
1
作者 SUN Ling and XU Jian Information Department,Soft Management Group,Beijing 100041,China 《Baosteel Technical Research》 CAS 2010年第S1期98-,共1页
In this paper,a steelmaking and continuous-casting production scheduling model is established according to the practical background of the Shou Gang-Qian Gang steel enterprise and then an algorithm is designed to solv... In this paper,a steelmaking and continuous-casting production scheduling model is established according to the practical background of the Shou Gang-Qian Gang steel enterprise and then an algorithm is designed to solve it.A steelmaking and continuous casting production scheduling system is developed based on the optimization model and algorithm.This system combines the optimization model,algorithm and human experience together.By using the human-machine interaction functions,the operator can modify this scheduling with his experience in the form of GANTT graph to get a schedule with high quality. 展开更多
关键词 steelmaking and continuous-casting production scheduling system GANTT
下载PDF
Molten Steel Flow in a Slab Continuous-casting Tundish 被引量:3
2
作者 Liang-cai ZHONG Rui-chao HAO +1 位作者 Jun-zhe LI Ying-xiong ZHU 《Journal of Iron and Steel Research International》 SCIE EI CAS CSCD 2014年第S1期10-16,共7页
Fields of fluid flow and temperature, and residence time distribution(RTD) curves were investigated by mathematical simulation in a one-strand tundish for continuous casting. It was known from the investigation that a... Fields of fluid flow and temperature, and residence time distribution(RTD) curves were investigated by mathematical simulation in a one-strand tundish for continuous casting. It was known from the investigation that a big "spring uprush" formed on surface around the long shroud when molten steel flowed into a turbulence inhibitor(TI) with extending lips and rushed up reversely out of the TI, while four small "spring uprushes" existed on surface when a TI without extending lips because the liquid steel flowed mainly out of the 4 corners of the TI. The flow of liquid steel in the former tundish configuration was not reasonable and the height of an area where temperature was less than 1819 K was about half of liquid surface height on the right side of the stopper, which meant that big dead zone existed in the former tundish configuration. In the optimal one, the height of such area was only seventh of the liquid surface height. The RTD curves obtained from the mathematical simulation basically agreed with those from the physical modeling and the flow characteristics obtained from these two methods agreed with each other. 展开更多
关键词 slab continuous-casting one-strand tundish flow control device molten steel flow mathematical simulation