The Huai River Basin is a unique area in P.R.China with the highest densities of population and water projects.It is also subject to the most serious water pollution.We proposed a distributional SWAT(Soil and Water As...The Huai River Basin is a unique area in P.R.China with the highest densities of population and water projects.It is also subject to the most serious water pollution.We proposed a distributional SWAT(Soil and Water Assessment Tool) model coupled with a water quality-quantity balance model to evaluate dam impacts on river flow regimes and water quality in the middle and upper reaches of the Huai River Basin.We calibrated and validated the SWAT model with data from 29 selected cross-sections in four typical years(1971,1981,1991 and 1999) and used scenario analysis to compensate for the unavailability of historical data regarding uninterrupted river flows before dam and floodgate construction,a problem of prediction for ungauged basins.The results indicate that dam and floodgate operations tended to reduce runoff,decrease peak value and shift peaking time.The contribution of water projects to river water quality deterioration in the concerned river system was between 0 to 40%,while pollutant discharge contributed to 60% to 100% of the water pollution.Pollution control should therefore be the key to the water quality rehabilitation in the Huai River Basin.展开更多
River cutoff works have been implemented on Lower Jingjiang section for 30 years. Engineering practices have shown that channel straightening has been the river regulation measure for the permanent control of the mean...River cutoff works have been implemented on Lower Jingjiang section for 30 years. Engineering practices have shown that channel straightening has been the river regulation measure for the permanent control of the meandering Lower Jingjiang section. River cutoff have been carried out in accordance with the evolution property of meandering rivers and these works have brought about expected benefits. It has also been noted that certain aspects in river cutoff had not been fully understood. River cutoff is a dynamic engineering. River channel evolution properties shall be fully understood so as to adroitly guide actions according to circumstances in cutoff works. In addition, river channel evolution observation and engineering effectiveness monitoring should be strengthened with a view to update the designs. The diversion canals for channel shortening are of great importance that will account for the success or failure of river cutoff works. The newly formed river channels and the river regime control works on the adjacent upper and lower reaches are guarantees for river cutoff works to be brought into play in the long run.展开更多
基金Funded by the Key Project of International Cooperation of the Natural Science Foundation of China (No. 40721140020)the Key Project of the Natural Science Foundation of China (No. 40730632)
文摘The Huai River Basin is a unique area in P.R.China with the highest densities of population and water projects.It is also subject to the most serious water pollution.We proposed a distributional SWAT(Soil and Water Assessment Tool) model coupled with a water quality-quantity balance model to evaluate dam impacts on river flow regimes and water quality in the middle and upper reaches of the Huai River Basin.We calibrated and validated the SWAT model with data from 29 selected cross-sections in four typical years(1971,1981,1991 and 1999) and used scenario analysis to compensate for the unavailability of historical data regarding uninterrupted river flows before dam and floodgate construction,a problem of prediction for ungauged basins.The results indicate that dam and floodgate operations tended to reduce runoff,decrease peak value and shift peaking time.The contribution of water projects to river water quality deterioration in the concerned river system was between 0 to 40%,while pollutant discharge contributed to 60% to 100% of the water pollution.Pollution control should therefore be the key to the water quality rehabilitation in the Huai River Basin.
文摘River cutoff works have been implemented on Lower Jingjiang section for 30 years. Engineering practices have shown that channel straightening has been the river regulation measure for the permanent control of the meandering Lower Jingjiang section. River cutoff have been carried out in accordance with the evolution property of meandering rivers and these works have brought about expected benefits. It has also been noted that certain aspects in river cutoff had not been fully understood. River cutoff is a dynamic engineering. River channel evolution properties shall be fully understood so as to adroitly guide actions according to circumstances in cutoff works. In addition, river channel evolution observation and engineering effectiveness monitoring should be strengthened with a view to update the designs. The diversion canals for channel shortening are of great importance that will account for the success or failure of river cutoff works. The newly formed river channels and the river regime control works on the adjacent upper and lower reaches are guarantees for river cutoff works to be brought into play in the long run.