This study analyzes the factors of influence on 0~# continuous caster in No.1 Steelmaking Plant of Xinjiang Bayi Iron & Steel Corporation(hereinafter referred to as Basteel).Diameter of tundish upper nozzle is sma...This study analyzes the factors of influence on 0~# continuous caster in No.1 Steelmaking Plant of Xinjiang Bayi Iron & Steel Corporation(hereinafter referred to as Basteel).Diameter of tundish upper nozzle is small,and the molten steel leakage accidents have been greatly manifolded in the high casting speed.In order to increase yield of 0~# continuouse caster in No.1 Steelmaking Plant of Xinjiang Bayi Iron & Steel Corporation,and a series of amelioration measure was put forward.Through enlarging diameter of tundish upper nozzle(fromφ21 mm toφ21.5 mm ),after the water distribution of the secondary cooling was optimized.Based on stabilizing the quality,improving the average casting speed and work rate of the caster,the capacity of the billet continuous caster was improved.A better results was gained;the average casting speed had been increased from 3.04 m/min to 3.21 m/min.Production of the caster had been improved from 1 005 179.926 t in 2008 to 1 040 853.075 t in 2009.Quality of the concasting billets and production had also been stabilized.展开更多
文摘This study analyzes the factors of influence on 0~# continuous caster in No.1 Steelmaking Plant of Xinjiang Bayi Iron & Steel Corporation(hereinafter referred to as Basteel).Diameter of tundish upper nozzle is small,and the molten steel leakage accidents have been greatly manifolded in the high casting speed.In order to increase yield of 0~# continuouse caster in No.1 Steelmaking Plant of Xinjiang Bayi Iron & Steel Corporation,and a series of amelioration measure was put forward.Through enlarging diameter of tundish upper nozzle(fromφ21 mm toφ21.5 mm ),after the water distribution of the secondary cooling was optimized.Based on stabilizing the quality,improving the average casting speed and work rate of the caster,the capacity of the billet continuous caster was improved.A better results was gained;the average casting speed had been increased from 3.04 m/min to 3.21 m/min.Production of the caster had been improved from 1 005 179.926 t in 2008 to 1 040 853.075 t in 2009.Quality of the concasting billets and production had also been stabilized.