Distributed generators now is widely used in electrical power networks, in some cases it works seasonally, and some types works at special weather conditions like photo voltaic systems and wind energy, and due to this...Distributed generators now is widely used in electrical power networks, in some cases it works seasonally, and some types works at special weather conditions like photo voltaic systems and wind energy, and due to this continuous changes in generation condition, the fault current level in network will be affected, this changes in fault current level will affect in the coordination between protection relays and to keep the coordination at right way, an adaptive protection system is required that can adaptive its setting according to generation changes, the fault current level in each case is evaluated using ETAP software, and the required relay setting in each case is also evaluated using Grey Wolf Optimizer (GWO) algorithm, and to select suitable setting which required in each condition, to select the active setting group of protection relay according to generation capacity, central protection unite can be used, and to improve protection stability and minimizing relays tripping time, a proposed method for selecting suitable backup relay is used, which leads to decrease relays tripping time and increase system stability, output settings for relays in all cases achieved our constrains.展开更多
This paper introduces an applicable test plan for emergency diesel generator in nuclear power plant. It advances improvement approaches with problems found during field commissioning test and its trouble-shooting proc...This paper introduces an applicable test plan for emergency diesel generator in nuclear power plant. It advances improvement approaches with problems found during field commissioning test and its trouble-shooting processes. The method is based on the integration of complementary through, the extension theory of matter-element model and neural network theory combine to overcome a neural network to learn shelters, and other defects. The purpose of this paper is to provide the better running and commissioning experience for the similar emergency generator unit.展开更多
Given the distribution feature of resources such as coal and water, the requirements for the development of Chinese power industry, and the fact of monopoly by foreign companies, it is very necessary and significant t...Given the distribution feature of resources such as coal and water, the requirements for the development of Chinese power industry, and the fact of monopoly by foreign companies, it is very necessary and significant to independently research and develop air-cooling technologies. Through experimental research, simulative calculation, process and equipment development, field tests and a demonstration project, the design and operation technologies for air-cooling system are grasped and relevant key equipment is developed. The results of the demonstration project show that the technical indicators for the air-cooling system have met or exceeded the design requirements. Part of the research results have been incorporated into the relevant national design standards. The technologies developed have been applied to more than 23 sets of thermal power units of or above 600 MW in China.展开更多
A new approach to maintenance scheduling of generating units(MSU)in competitive electricity markets was presented,which was formulated as a noncooperative game with complete information.The payoff of each generating c...A new approach to maintenance scheduling of generating units(MSU)in competitive electricity markets was presented,which was formulated as a noncooperative game with complete information.The payoff of each generating company(Genco)was defined as the profit from the energy auction market minus maintenance cost and risk loss.The compensation fee of interruptible load was a part of the maintenance cost when the permitted maintenance capacity in the system was insufficient.Hourly energy auction was incorporated in the computation of both revenues from energy market and risk loss of maintenance strategy as a nested game.A new heuristic search algorithm for the calculation of the game equilibrium of MSU was presented,which coordinates the solutions of non-equilibrium,unique equilibrium and multiple equilibria.Numerical results for a two-Genco system and a realistic system were used to demonstrate the basic ideas and the applicability of the proposed method,as well as its computational efficiency.展开更多
This paper presents the data on operation reliability indices and relevant analyses toward China's conventional power generating units in 2009.The units brought into the statistical analysis include 100-MW or abov...This paper presents the data on operation reliability indices and relevant analyses toward China's conventional power generating units in 2009.The units brought into the statistical analysis include 100-MW or above thermal generating units,40-MW or above hydro generating units,and all nuclear generating units.The reliability indices embodied include utilization hours,times and hours of scheduled outages,times and hours of unscheduled outages,equivalent forced outage rate and equivalent availability factor.展开更多
Today, the most urgent problem of the existing and future nuclear power industry is to ensure the nuclear and environmental safety of the operation of nuclear power reactor units (NPPs) and nuclear power plants (NPPs)...Today, the most urgent problem of the existing and future nuclear power industry is to ensure the nuclear and environmental safety of the operation of nuclear power reactor units (NPPs) and nuclear power plants (NPPs). It is solved thanks to the application of deeply echeloned protection and an anti-accident complex of methods and means for effective control of the operation of active reactor zones (AZR). However, the danger of existing NPPs in the world from time to time manifests itself in the form of severe post-project accidents and catastrophes with the release into the environment of a significant amount of radioactive materials dangerous for all living things. The results of the analysis show that the unconditional fulfillment of the main requirements of nuclear environmental safety and biocompatibility is possible only in the so-called wave nuclear reactor of the G-V generation, which, unlike reactors of the previous generations III, II+ and IV, does not require supercritical loading of the core with nuclear fuel. In the active zone of this reactor, nuclear-physical processes governed by physical law are implemented, which exclude the operator’s participation in regulating the reactivity of the reactor’s active zone, which makes it the reactor with the highest level of nuclear and environmental safety today, which is based on the principles of so-called internal safety, free from the human factor. The possibility of burning nuclear fuel based on U238 and Th232 in it expands the reserves of energetic nuclear fuel almost to inexhaustibility. The technology of nuclear reactors of the G5 generation through the secondary use of spent irradiated nuclear fuel (SNF) for the production of energy and energy raw materials with simultaneous burning of it to an environmentally safe state is able to quickly reduce the available stocks and further production of dangerous SNF, guarantee the nuclear and environmental safety of NPPs with reactors G5 and to technologically make nuclear post-project accidents and disasters impossible at the level of physical law with the complete elimination of the human factor.展开更多
为解决综合能源生产单元(integrated energy production unit,IEPU)中燃煤机组碳捕集过程的高能耗问题,同时应对新能源不确定性对运行调度带来的挑战,该文提出一种考虑太阳能辅助碳捕集技术的IEPU随机低碳调度策略,旨在实现IEPU的多能...为解决综合能源生产单元(integrated energy production unit,IEPU)中燃煤机组碳捕集过程的高能耗问题,同时应对新能源不确定性对运行调度带来的挑战,该文提出一种考虑太阳能辅助碳捕集技术的IEPU随机低碳调度策略,旨在实现IEPU的多能协同与低碳运行。首先,对含太阳能辅助碳捕集热电联产单元(combined heat and power based on solar-assisted carbon capture,CHP-SACC)的能量流动与运行机理进行分析,并构建其运行模型;其次,考虑风电不确定性带来的影响,提出一种基于条件最小二乘生成对抗网络(conditional-least squares generative adversarial networks,C-LSGANs)的可再生能源场景生成方法来提高场景的生成质量;然后,考虑异质能流耦合约束、多元设备运行约束以及能量平衡约束等,以最大化系统运行收益期望为目标构建IEPU随机低碳调度模型;最后,在算例仿真中设置不同的运行策略验证所提低碳转型方案的有效性,并分析了能源价格、设备容量等因素对系统运行收益的影响。展开更多
文摘Distributed generators now is widely used in electrical power networks, in some cases it works seasonally, and some types works at special weather conditions like photo voltaic systems and wind energy, and due to this continuous changes in generation condition, the fault current level in network will be affected, this changes in fault current level will affect in the coordination between protection relays and to keep the coordination at right way, an adaptive protection system is required that can adaptive its setting according to generation changes, the fault current level in each case is evaluated using ETAP software, and the required relay setting in each case is also evaluated using Grey Wolf Optimizer (GWO) algorithm, and to select suitable setting which required in each condition, to select the active setting group of protection relay according to generation capacity, central protection unite can be used, and to improve protection stability and minimizing relays tripping time, a proposed method for selecting suitable backup relay is used, which leads to decrease relays tripping time and increase system stability, output settings for relays in all cases achieved our constrains.
文摘This paper introduces an applicable test plan for emergency diesel generator in nuclear power plant. It advances improvement approaches with problems found during field commissioning test and its trouble-shooting processes. The method is based on the integration of complementary through, the extension theory of matter-element model and neural network theory combine to overcome a neural network to learn shelters, and other defects. The purpose of this paper is to provide the better running and commissioning experience for the similar emergency generator unit.
文摘Given the distribution feature of resources such as coal and water, the requirements for the development of Chinese power industry, and the fact of monopoly by foreign companies, it is very necessary and significant to independently research and develop air-cooling technologies. Through experimental research, simulative calculation, process and equipment development, field tests and a demonstration project, the design and operation technologies for air-cooling system are grasped and relevant key equipment is developed. The results of the demonstration project show that the technical indicators for the air-cooling system have met or exceeded the design requirements. Part of the research results have been incorporated into the relevant national design standards. The technologies developed have been applied to more than 23 sets of thermal power units of or above 600 MW in China.
基金The National High Technology Research and Development Program of China(863Program)(No.2005AA505101-621)Important Science and Technology Research Project of Shanghai(No.041612012)
文摘A new approach to maintenance scheduling of generating units(MSU)in competitive electricity markets was presented,which was formulated as a noncooperative game with complete information.The payoff of each generating company(Genco)was defined as the profit from the energy auction market minus maintenance cost and risk loss.The compensation fee of interruptible load was a part of the maintenance cost when the permitted maintenance capacity in the system was insufficient.Hourly energy auction was incorporated in the computation of both revenues from energy market and risk loss of maintenance strategy as a nested game.A new heuristic search algorithm for the calculation of the game equilibrium of MSU was presented,which coordinates the solutions of non-equilibrium,unique equilibrium and multiple equilibria.Numerical results for a two-Genco system and a realistic system were used to demonstrate the basic ideas and the applicability of the proposed method,as well as its computational efficiency.
文摘This paper presents the data on operation reliability indices and relevant analyses toward China's conventional power generating units in 2009.The units brought into the statistical analysis include 100-MW or above thermal generating units,40-MW or above hydro generating units,and all nuclear generating units.The reliability indices embodied include utilization hours,times and hours of scheduled outages,times and hours of unscheduled outages,equivalent forced outage rate and equivalent availability factor.
文摘Today, the most urgent problem of the existing and future nuclear power industry is to ensure the nuclear and environmental safety of the operation of nuclear power reactor units (NPPs) and nuclear power plants (NPPs). It is solved thanks to the application of deeply echeloned protection and an anti-accident complex of methods and means for effective control of the operation of active reactor zones (AZR). However, the danger of existing NPPs in the world from time to time manifests itself in the form of severe post-project accidents and catastrophes with the release into the environment of a significant amount of radioactive materials dangerous for all living things. The results of the analysis show that the unconditional fulfillment of the main requirements of nuclear environmental safety and biocompatibility is possible only in the so-called wave nuclear reactor of the G-V generation, which, unlike reactors of the previous generations III, II+ and IV, does not require supercritical loading of the core with nuclear fuel. In the active zone of this reactor, nuclear-physical processes governed by physical law are implemented, which exclude the operator’s participation in regulating the reactivity of the reactor’s active zone, which makes it the reactor with the highest level of nuclear and environmental safety today, which is based on the principles of so-called internal safety, free from the human factor. The possibility of burning nuclear fuel based on U238 and Th232 in it expands the reserves of energetic nuclear fuel almost to inexhaustibility. The technology of nuclear reactors of the G5 generation through the secondary use of spent irradiated nuclear fuel (SNF) for the production of energy and energy raw materials with simultaneous burning of it to an environmentally safe state is able to quickly reduce the available stocks and further production of dangerous SNF, guarantee the nuclear and environmental safety of NPPs with reactors G5 and to technologically make nuclear post-project accidents and disasters impossible at the level of physical law with the complete elimination of the human factor.
文摘为解决综合能源生产单元(integrated energy production unit,IEPU)中燃煤机组碳捕集过程的高能耗问题,同时应对新能源不确定性对运行调度带来的挑战,该文提出一种考虑太阳能辅助碳捕集技术的IEPU随机低碳调度策略,旨在实现IEPU的多能协同与低碳运行。首先,对含太阳能辅助碳捕集热电联产单元(combined heat and power based on solar-assisted carbon capture,CHP-SACC)的能量流动与运行机理进行分析,并构建其运行模型;其次,考虑风电不确定性带来的影响,提出一种基于条件最小二乘生成对抗网络(conditional-least squares generative adversarial networks,C-LSGANs)的可再生能源场景生成方法来提高场景的生成质量;然后,考虑异质能流耦合约束、多元设备运行约束以及能量平衡约束等,以最大化系统运行收益期望为目标构建IEPU随机低碳调度模型;最后,在算例仿真中设置不同的运行策略验证所提低碳转型方案的有效性,并分析了能源价格、设备容量等因素对系统运行收益的影响。