The theory and method of system integration for the real-time monitoring of core rock-fill dam filling con- struction quality are studied in this paper. First, the importance analysis of system integration factors is ...The theory and method of system integration for the real-time monitoring of core rock-fill dam filling con- struction quality are studied in this paper. First, the importance analysis of system integration factors is carried out with the analytic hierarchy process. Then, according to the analysis result of integration factors, the conceptual model of system integration is built based on function integration, index integration, technology integration and information integration, the index structure of core rock-fill dam filling construction quality control is constructed and the method of function integration and technology integration is studied. The mathematical model of process monitoring is built according to monitoring objective, process and indexes. Research results have been applied in Nuozhadu core rock-fill dam construction management, realizing system integration through building appropriate monitoring work flow and comprehensive information platform of digital dam.展开更多
The cut-off wall in a clay-core rockfill dam built on a thick overburden layer is subjected to a large compressive pressure under the action of the loads such as the dead weight of both the dam and the overburden laye...The cut-off wall in a clay-core rockfill dam built on a thick overburden layer is subjected to a large compressive pressure under the action of the loads such as the dead weight of both the dam and the overburden layer, the frictional force induced by the differential settlement between the cut-off wall and surrounding soils, and the water pressure. Thus, reduction of the stress of the cut-off wall has become one of the main problems for consideration in engineering design. In this paper, numerical analysis of a core rockfill dam built on a thick overburden layer was conducted and some factors influencing the stress-strain behaviors of the cut-off wall were investigated. The factors include the improvement of the overburden layer, the modeling approach for interfacial contact between the cut-off wall and surrounding soils, the modulus of the cut-off wall concrete, and the connected pattern between the cut-off wall and the clay core. The result shows that improving the overburden layer,selecting plastic concrete with a low modulus and high strength, and optimizing the connection between the cut-off wall and the clay core of the dam are effective measures of reducing the deformations and compressive stresses of the cut-off wall. In addition, both the Goodman element and the mud-layer element are suitable for simulating the interfacial contact between the cut-off wall and surrounding soils.展开更多
During the storehouse surface rolling construction of a core rockfilldam, the spreading thickness of dam face is an important factor that affects the construction quality of the dam storehouse' rolling surface and...During the storehouse surface rolling construction of a core rockfilldam, the spreading thickness of dam face is an important factor that affects the construction quality of the dam storehouse' rolling surface and the overallquality of the entire dam. Currently, the method used to monitor and controlspreading thickness during the dam construction process is artificialsampling check after spreading, which makes it difficult to monitor the entire dam storehouse surface. In this paper, we present an in-depth study based on real-time monitoring and controltheory of storehouse surface rolling construction and obtain the rolling compaction thickness by analyzing the construction track of the rolling machine. Comparatively, the traditionalmethod can only analyze the rolling thickness of the dam storehouse surface after it has been compacted and cannot determine the thickness of the dam storehouse surface in realtime. To solve these problems, our system monitors the construction progress of the leveling machine and employs a real-time spreading thickness monitoring modelbased on the K-nearest neighbor algorithm. Taking the LHK core rockfilldam in Southwest China as an example, we performed real-time monitoring for the spreading thickness and conducted real-time interactive queries regarding the spreading thickness. This approach provides a new method for controlling the spreading thickness of the core rockfilldam storehouse surface.展开更多
Aikou rockfill dam with asphalt-concrete core is situated in a karst area in Chongqing City, China. In order to study the operative conditions of the rockfill dam, especially those of the asphalt-concrete core, the Du...Aikou rockfill dam with asphalt-concrete core is situated in a karst area in Chongqing City, China. In order to study the operative conditions of the rockfill dam, especially those of the asphalt-concrete core, the Duncan model is adopted to compute the stress and strain of both the rockfill dam and the asphalt-concrete core after karst grouting and other treatments. The results indicate that the complicated stress and deformation of both the dam body and the core are within reasonable ranges. It is shown that structure design and foundation treatment of the dam are feasible and can be used as a reference for other similar projects.展开更多
The study on developing the reasonable safety monitoring indexes plays a most importantly role in the health monitoring of high core rockfill dams. However, researches on this topic are relatively scarce both at home ...The study on developing the reasonable safety monitoring indexes plays a most importantly role in the health monitoring of high core rockfill dams. However, researches on this topic are relatively scarce both at home and abroad. In this paper, the characteristics and failure modes of seepage in high core rockfill dam are analyzed firstly. Then, a safety monitoring index based on seepage quantity, which reflects the overall seepage behavior, is developed, using the real-time monitoring data and its safety monitoring model. Moreover, another safety monitoring index based on seepage gradient, reflecting the local seepage behavior, is proposed, combining the spatial layout of osmo- meters and local failure mechanisms of core wall. Additionally, one more safety monitoring index based on permeability coefficient, which considers the overall and local seepage behaviors, is developed, on the basis of establishing the finite element analysis model and real-time seepage coefficient inversion analysis model of high core rockfill dam. A case study on these indexes of Nuozhadu high core rockfill dam is developed, which improves the reliability of seepage safety evaluation of the dam.展开更多
Reinforced concrete core dams can be an alternative solution to conventional dam designs either for permanent impounded reservoirs or flood protection and flood-retaining dams. Dams of this type have been constructed ...Reinforced concrete core dams can be an alternative solution to conventional dam designs either for permanent impounded reservoirs or flood protection and flood-retaining dams. Dams of this type have been constructed in Austria for various reasons and have shown good behavior during operation. For a better understanding of the load-deformation behavior of this type of dams during construction and impounding, numerical simulations were carried out. The interaction between the thin reinforced concrete core and the dam fill material as well as the influence of fill material properties and other main parameters, such as the roughness of the concrete surface and bedding conditions of the concrete core,on the deformation behavior of dams were examined. The results show that high compressive stress is mainly induced by arching effects in the dam body during construction. During the reservoir impounding, the compressive stresses in the core are reduced significantly while the bending moment in the core footing increases. The results also show that the maximum bending moments occur at the core footing and can be significantly reduced by design improvements. The findings in this study can provide general design recommendations for small dams with a central concrete core as a sealing blanket.展开更多
This paper presents a database of glacial till gradations that are compiled from laboratory internal stability tests from the literature and from core soils of existing dams, some of which have experienced internal er...This paper presents a database of glacial till gradations that are compiled from laboratory internal stability tests from the literature and from core soils of existing dams, some of which have experienced internal erosion. The potential internal instability of these gradations is assessed using empirical methods. Two approaches of evaluation are used: the Kenney-Lau method, which analyzes the shape of the gradation curve;and the Burenkova method, which uses factors of uniformity of the slope of the gradation. Although they include some uncertainties in terms of soils with fines, these methods, which are primarily developed from laboratory studies of sand and gravels, are used in engineering practice to evaluate widely graded soils that include fines, such as glacial tills. This study evaluates the glacial till gradations of the database using these approaches and discusses their applicability and relative predictive success. This study indicates that both the Kenney-Lau method and the Burenkova method have merit, but a closer analysis indicates that the Kenney-Lau approach has relatively better predictive ability based on the glacial till gradations analyzed in this study.展开更多
基金National Key Technology R&D Program in the 12th Five Year Plan of China (No. 2011BAB10B06)Independent Innovation Foundation of Tianjin University (No. 1102119)
文摘The theory and method of system integration for the real-time monitoring of core rock-fill dam filling con- struction quality are studied in this paper. First, the importance analysis of system integration factors is carried out with the analytic hierarchy process. Then, according to the analysis result of integration factors, the conceptual model of system integration is built based on function integration, index integration, technology integration and information integration, the index structure of core rock-fill dam filling construction quality control is constructed and the method of function integration and technology integration is studied. The mathematical model of process monitoring is built according to monitoring objective, process and indexes. Research results have been applied in Nuozhadu core rock-fill dam construction management, realizing system integration through building appropriate monitoring work flow and comprehensive information platform of digital dam.
基金the National Natural Science Foundation of China (Grant No.51379066)the Fundamental Research Funds for the Central Universities (Grant No.2016B03514)+1 种基金the National Key Technology Support Program (Grant No.2015BAB07B05)the Key Laboratory of Earth-Rock Dam Failure Mechanism and Safety Control Techniques (Grant No.YK913007).
文摘The cut-off wall in a clay-core rockfill dam built on a thick overburden layer is subjected to a large compressive pressure under the action of the loads such as the dead weight of both the dam and the overburden layer, the frictional force induced by the differential settlement between the cut-off wall and surrounding soils, and the water pressure. Thus, reduction of the stress of the cut-off wall has become one of the main problems for consideration in engineering design. In this paper, numerical analysis of a core rockfill dam built on a thick overburden layer was conducted and some factors influencing the stress-strain behaviors of the cut-off wall were investigated. The factors include the improvement of the overburden layer, the modeling approach for interfacial contact between the cut-off wall and surrounding soils, the modulus of the cut-off wall concrete, and the connected pattern between the cut-off wall and the clay core. The result shows that improving the overburden layer,selecting plastic concrete with a low modulus and high strength, and optimizing the connection between the cut-off wall and the clay core of the dam are effective measures of reducing the deformations and compressive stresses of the cut-off wall. In addition, both the Goodman element and the mud-layer element are suitable for simulating the interfacial contact between the cut-off wall and surrounding soils.
基金supported by the Innovative Research Groups of National Natural Science Foundation of China(No. 51621092)National Basic Research Program of China ("973" Program, No. 2013CB035904)National Natural Science Foundation of China (No. 51439005)
文摘During the storehouse surface rolling construction of a core rockfilldam, the spreading thickness of dam face is an important factor that affects the construction quality of the dam storehouse' rolling surface and the overallquality of the entire dam. Currently, the method used to monitor and controlspreading thickness during the dam construction process is artificialsampling check after spreading, which makes it difficult to monitor the entire dam storehouse surface. In this paper, we present an in-depth study based on real-time monitoring and controltheory of storehouse surface rolling construction and obtain the rolling compaction thickness by analyzing the construction track of the rolling machine. Comparatively, the traditionalmethod can only analyze the rolling thickness of the dam storehouse surface after it has been compacted and cannot determine the thickness of the dam storehouse surface in realtime. To solve these problems, our system monitors the construction progress of the leveling machine and employs a real-time spreading thickness monitoring modelbased on the K-nearest neighbor algorithm. Taking the LHK core rockfilldam in Southwest China as an example, we performed real-time monitoring for the spreading thickness and conducted real-time interactive queries regarding the spreading thickness. This approach provides a new method for controlling the spreading thickness of the core rockfilldam storehouse surface.
文摘Aikou rockfill dam with asphalt-concrete core is situated in a karst area in Chongqing City, China. In order to study the operative conditions of the rockfill dam, especially those of the asphalt-concrete core, the Duncan model is adopted to compute the stress and strain of both the rockfill dam and the asphalt-concrete core after karst grouting and other treatments. The results indicate that the complicated stress and deformation of both the dam body and the core are within reasonable ranges. It is shown that structure design and foundation treatment of the dam are feasible and can be used as a reference for other similar projects.
文摘The study on developing the reasonable safety monitoring indexes plays a most importantly role in the health monitoring of high core rockfill dams. However, researches on this topic are relatively scarce both at home and abroad. In this paper, the characteristics and failure modes of seepage in high core rockfill dam are analyzed firstly. Then, a safety monitoring index based on seepage quantity, which reflects the overall seepage behavior, is developed, using the real-time monitoring data and its safety monitoring model. Moreover, another safety monitoring index based on seepage gradient, reflecting the local seepage behavior, is proposed, combining the spatial layout of osmo- meters and local failure mechanisms of core wall. Additionally, one more safety monitoring index based on permeability coefficient, which considers the overall and local seepage behaviors, is developed, on the basis of establishing the finite element analysis model and real-time seepage coefficient inversion analysis model of high core rockfill dam. A case study on these indexes of Nuozhadu high core rockfill dam is developed, which improves the reliability of seepage safety evaluation of the dam.
文摘Reinforced concrete core dams can be an alternative solution to conventional dam designs either for permanent impounded reservoirs or flood protection and flood-retaining dams. Dams of this type have been constructed in Austria for various reasons and have shown good behavior during operation. For a better understanding of the load-deformation behavior of this type of dams during construction and impounding, numerical simulations were carried out. The interaction between the thin reinforced concrete core and the dam fill material as well as the influence of fill material properties and other main parameters, such as the roughness of the concrete surface and bedding conditions of the concrete core,on the deformation behavior of dams were examined. The results show that high compressive stress is mainly induced by arching effects in the dam body during construction. During the reservoir impounding, the compressive stresses in the core are reduced significantly while the bending moment in the core footing increases. The results also show that the maximum bending moments occur at the core footing and can be significantly reduced by design improvements. The findings in this study can provide general design recommendations for small dams with a central concrete core as a sealing blanket.
基金part of the“Swedish Hydropower Centre-SVC”the financial support received from WSP Sweden
文摘This paper presents a database of glacial till gradations that are compiled from laboratory internal stability tests from the literature and from core soils of existing dams, some of which have experienced internal erosion. The potential internal instability of these gradations is assessed using empirical methods. Two approaches of evaluation are used: the Kenney-Lau method, which analyzes the shape of the gradation curve;and the Burenkova method, which uses factors of uniformity of the slope of the gradation. Although they include some uncertainties in terms of soils with fines, these methods, which are primarily developed from laboratory studies of sand and gravels, are used in engineering practice to evaluate widely graded soils that include fines, such as glacial tills. This study evaluates the glacial till gradations of the database using these approaches and discusses their applicability and relative predictive success. This study indicates that both the Kenney-Lau method and the Burenkova method have merit, but a closer analysis indicates that the Kenney-Lau approach has relatively better predictive ability based on the glacial till gradations analyzed in this study.