The production cycle of open-cast coal mines generally in eludes drilling, blasting, loading, hauling and coal preparation activities. Individual optimization of these activities does not mean that the whole system is...The production cycle of open-cast coal mines generally in eludes drilling, blasting, loading, hauling and coal preparation activities. Individual optimization of these activities does not mean that the whole system is optimized. This paper proposes a cost model considering all activities in mining cycle and system-wide approach to minimize the total mining cost of bench production. Since the fragmentation size and blast-hole diameter are linked to all activities of mining system, they are considered as decision variables in the problem form ul at io n. The operatio n costs are then minimized by using the evolutionary algorithm. Moreover, the impact of the change in the explosive price, and the hourly unit cost of equipment on total mining cost is quantified by sensitivity analysis. A case study is implemented to demonstrate the developed model.展开更多
The publication of ISO 15686-5 is significant for studies related to the life-cycle costs of buildings. Among the many economic evaluation methods, the NPV method is recommended for use by this standard. This stu...The publication of ISO 15686-5 is significant for studies related to the life-cycle costs of buildings. Among the many economic evaluation methods, the NPV method is recommended for use by this standard. This study explains the concept and method of PV, and then provides an explanation of the concept and method of NPV, and points out the limitations in the practical application of the method.展开更多
The complexity of the IH-635 Managed Lanes Project, located in Dallas County, Texas, posed several technical and constructive challenges, leading to the adoption of solutions different from the traditional. Two altern...The complexity of the IH-635 Managed Lanes Project, located in Dallas County, Texas, posed several technical and constructive challenges, leading to the adoption of solutions different from the traditional. Two alternative solutions for the pier cap on one of the bridge crossings over IH-35E in the IH-635 project were analyzed in this case study, a cast-in-place post-tensioned concrete cap and an innovative prefabricated steel-concrete com- posite cap. The approach was to use an estimation of direct costs for material and labor and consideration of con- struction time schedules. A supplementary numerical modeling confirmed that both alternatives behave elasti- cally under imposed loads. The direct cost of material and labor for the two alternatives were close. However, the composite alternative required 13 days less construction time, resulting in substantial cost savings from traffic closing in the very busy traffic corridor. Traffic closing costs were substantially higher than the direct costs, especially for the post-tensioned cap. The quantification of the benefits allows more confidence in the utilization of the composites caps, leading to faster completion of bridge projects and substantial economic savings.展开更多
The contemporary environment within which command,control,communications,computers and intelligence (C4I platforms exist, have a number of characteristics. These characteristics may be most obviously identified as int...The contemporary environment within which command,control,communications,computers and intelligence (C4I platforms exist, have a number of characteristics. These characteristics may be most obviously identified as interconnectivity, international networking, speed of data transfer, the compact nature of electronic information and rapidly changing technology. Information security professionals employ a variety of approaches in order to counter risks within this complex and fluid environment. The gamut of potential security activities ranges form access control through a variety of auditing techniques to secure data communications. This field is broad and well documented. Indeed, the discipline of network risk management and data security is both well developed and sophisticated.This paper addresses twin themes:i.The fundamental issue of the method by which specific approaches are employed. This is a precursor to the adoption of an eventual strategy.ii.The crucial issues revolving around the展开更多
Tourism is becoming a vital component for economic development in South Africa. The income generated by the tourism industry is about 6% of the GDP, which is significant but still falls short of the goal set by the Wh...Tourism is becoming a vital component for economic development in South Africa. The income generated by the tourism industry is about 6% of the GDP, which is significant but still falls short of the goal set by the White Paper on Tourism in 2000. In the light of South Africa hosting the 2010 Football World Cup, it is important to identify ways of sustainable tourism development that would continue to increase the benefits to the economy long after the event's over. The main objective of the research was to explore an idea for increasing the level of tourist income generated in the Port Elizabeth (Eastern Cape) area. The idea was researched by means of conducting a cost-benefit analysis of two tourist related projects. These projects would introduce Charter airline services between Europe and Port Elizabeth. A second objective was to identify constraints on the project or market failures which would prevent their implementation. The economic theory behind the operation of an airline showed that lease costs and aeroplane operating costs are the two most important factors determine Charter airline's profitability. In order to offset these costs, airlines must achieve high passenger load factors. Charter airlines have the advantage over scheduled airlines, in that they will only fly if a minimum level of people has pre-booked seats. Two aeroplanes were chosen for comparison purpose: an Airbus A 340-300 and a Boeing 767-300ER. The private benefits calculated were based on load factors between 80 and 95 percent for ticket prices of USD 667 and USD 773. In addition, to private costs and benefits, social benefits were also estimated in the form of additional secondary revenue generated. With the introduction of net social benefits, both projects become profitable. A 50 percent substitution of revenue generated by the Charter tourists reduces the profits for the both projects drastically. A project based on a Boeing 767-300ER is the most efficient project as it has the highest NPV and BCR values. A reduction in the lease cost of the Airbus 340-300 could make projects based on it more competitive. A few constraints on the establishment of a Charter airline operator based in Port Elizabeth are: the lack of adequate runway for the landing of the long-haul carriers and the need of a larger liberalisation of the aviation policy by eliminating protectionism. The cost benefit analysis undertaken in this research does not take into account social costs and benefits to the economy of establishing a Charter airline based in Port Elizabeth, such as an employment, infrastructure development and poverty alleviation. Nevertheless the analysis does suggest that there are strong private and social benefits warranting the establishment of an airline business between Europe and Port Elizabeth. The economic benefits of the tourism industry and its link to airline travel are outlined in section 3. It is shown that the growth of the airline industry is a major component and contributor to tourism growth.展开更多
文摘The production cycle of open-cast coal mines generally in eludes drilling, blasting, loading, hauling and coal preparation activities. Individual optimization of these activities does not mean that the whole system is optimized. This paper proposes a cost model considering all activities in mining cycle and system-wide approach to minimize the total mining cost of bench production. Since the fragmentation size and blast-hole diameter are linked to all activities of mining system, they are considered as decision variables in the problem form ul at io n. The operatio n costs are then minimized by using the evolutionary algorithm. Moreover, the impact of the change in the explosive price, and the hourly unit cost of equipment on total mining cost is quantified by sensitivity analysis. A case study is implemented to demonstrate the developed model.
文摘The publication of ISO 15686-5 is significant for studies related to the life-cycle costs of buildings. Among the many economic evaluation methods, the NPV method is recommended for use by this standard. This study explains the concept and method of PV, and then provides an explanation of the concept and method of NPV, and points out the limitations in the practical application of the method.
基金herein for allowing the use of various data from the LBJ Project in the development of this paper
文摘The complexity of the IH-635 Managed Lanes Project, located in Dallas County, Texas, posed several technical and constructive challenges, leading to the adoption of solutions different from the traditional. Two alternative solutions for the pier cap on one of the bridge crossings over IH-35E in the IH-635 project were analyzed in this case study, a cast-in-place post-tensioned concrete cap and an innovative prefabricated steel-concrete com- posite cap. The approach was to use an estimation of direct costs for material and labor and consideration of con- struction time schedules. A supplementary numerical modeling confirmed that both alternatives behave elasti- cally under imposed loads. The direct cost of material and labor for the two alternatives were close. However, the composite alternative required 13 days less construction time, resulting in substantial cost savings from traffic closing in the very busy traffic corridor. Traffic closing costs were substantially higher than the direct costs, especially for the post-tensioned cap. The quantification of the benefits allows more confidence in the utilization of the composites caps, leading to faster completion of bridge projects and substantial economic savings.
文摘The contemporary environment within which command,control,communications,computers and intelligence (C4I platforms exist, have a number of characteristics. These characteristics may be most obviously identified as interconnectivity, international networking, speed of data transfer, the compact nature of electronic information and rapidly changing technology. Information security professionals employ a variety of approaches in order to counter risks within this complex and fluid environment. The gamut of potential security activities ranges form access control through a variety of auditing techniques to secure data communications. This field is broad and well documented. Indeed, the discipline of network risk management and data security is both well developed and sophisticated.This paper addresses twin themes:i.The fundamental issue of the method by which specific approaches are employed. This is a precursor to the adoption of an eventual strategy.ii.The crucial issues revolving around the
文摘Tourism is becoming a vital component for economic development in South Africa. The income generated by the tourism industry is about 6% of the GDP, which is significant but still falls short of the goal set by the White Paper on Tourism in 2000. In the light of South Africa hosting the 2010 Football World Cup, it is important to identify ways of sustainable tourism development that would continue to increase the benefits to the economy long after the event's over. The main objective of the research was to explore an idea for increasing the level of tourist income generated in the Port Elizabeth (Eastern Cape) area. The idea was researched by means of conducting a cost-benefit analysis of two tourist related projects. These projects would introduce Charter airline services between Europe and Port Elizabeth. A second objective was to identify constraints on the project or market failures which would prevent their implementation. The economic theory behind the operation of an airline showed that lease costs and aeroplane operating costs are the two most important factors determine Charter airline's profitability. In order to offset these costs, airlines must achieve high passenger load factors. Charter airlines have the advantage over scheduled airlines, in that they will only fly if a minimum level of people has pre-booked seats. Two aeroplanes were chosen for comparison purpose: an Airbus A 340-300 and a Boeing 767-300ER. The private benefits calculated were based on load factors between 80 and 95 percent for ticket prices of USD 667 and USD 773. In addition, to private costs and benefits, social benefits were also estimated in the form of additional secondary revenue generated. With the introduction of net social benefits, both projects become profitable. A 50 percent substitution of revenue generated by the Charter tourists reduces the profits for the both projects drastically. A project based on a Boeing 767-300ER is the most efficient project as it has the highest NPV and BCR values. A reduction in the lease cost of the Airbus 340-300 could make projects based on it more competitive. A few constraints on the establishment of a Charter airline operator based in Port Elizabeth are: the lack of adequate runway for the landing of the long-haul carriers and the need of a larger liberalisation of the aviation policy by eliminating protectionism. The cost benefit analysis undertaken in this research does not take into account social costs and benefits to the economy of establishing a Charter airline based in Port Elizabeth, such as an employment, infrastructure development and poverty alleviation. Nevertheless the analysis does suggest that there are strong private and social benefits warranting the establishment of an airline business between Europe and Port Elizabeth. The economic benefits of the tourism industry and its link to airline travel are outlined in section 3. It is shown that the growth of the airline industry is a major component and contributor to tourism growth.