Discussion on Cost Budgeting and Cost Control Strategies for Prefabricated Construction Projects
1
作者 Congzi Cheng 《Journal of Architectural Research and Development》 2024年第4期17-23,共7页
In the process of China’s national economic development,the construction industry is a very important component and has a direct impact on the level of China’s economic construction.Nowadays,the development speed of... In the process of China’s national economic development,the construction industry is a very important component and has a direct impact on the level of China’s economic construction.Nowadays,the development speed of the prefabricated construction industry is constantly accelerating.To effectively ensure the economic benefits of engineering projects,it is necessary to comprehensively strengthen cost budgeting and cost control.This article analyzes the cost budget of prefabricated construction projects,introduces the application advantages of prefabricated construction,and proposes specific cost budgeting and cost control measures,hoping to provide some reference for relevant researchers. 展开更多
关键词 Prefabricated building Engineering cost budget cost control
下载PDF
An online electricity cost budgeting algorithm for maximizing green energy usage across data centers
2
作者 Hui DOU Yong QI 《Frontiers of Computer Science》 SCIE EI CSCD 2017年第4期661-674,共14页
With the sky-rocketing development of Internet services, the power usage in data centers has been signifi- cantly increasing. This ever increasing energy consumption leads to negative environmental impact such as glob... With the sky-rocketing development of Internet services, the power usage in data centers has been signifi- cantly increasing. This ever increasing energy consumption leads to negative environmental impact such as global warming. To reduce their carbon footprints, large Internet service operators begin to utilize green energy. Since green energy is currently more expensive than the traditional brown one, it is important for the operators to maximize the green en- ergy usage subject to their desired long-term (e.g., a month) cost budget constraint. In this paper, we propose an online algorithm GreenBudget based on the Lyapunov optimization framework. We prove that our algorithm is able to achieve a delicate tradeoff between the green energy usage and the en- forcement of the cost budget constraint, and a control parameter V is the knob to arbitrarily tune such a tradeoff. We evaluate GreenBudget utilizing real-life traces of user requests, cooling efficiency, electricity price and green energy avail- ability. Experimental results demonstrate that under the same cost budget constraint, GreenBudget can increase the green energy usage by 11.55% compared with the state-of-the-art work, without incurring any performance violation of user requests. 展开更多
关键词 electricity cost budgeting green energy coolingefficiency data center Lyapunov optimization
原文传递
Integrated Control Model for Time and Cost Risk in Project Management
3
作者 程铁信 张伟波 张勇 《Transactions of Tianjin University》 EI CAS 2002年第2期99-105,共7页
Time, cost and quality are the three main targets to be controled in project management. However, the control and management of time and cost risk are usually carried out respectively, which will bring such problems a... Time, cost and quality are the three main targets to be controled in project management. However, the control and management of time and cost risk are usually carried out respectively, which will bring such problems as the delay of schedule by reason of the impracticability of cash flow, the money difficulties caused by delay of schedule and so on. In order to control and manage the time and cost risk effectively and simultaneously, a time & cost risk control model based on schedule programme was established with the use of the quantitativemodels of BCWS, BCWP and ACWP in this paper. Subsequently, the analysis of variance for the whole project and the single activity was introduced on the basis of BCWS, BCWP and ACWP so that the project can be controlled and managed effectively. Furthermore, an example given behind in detail expressly illustrated that the model set up above was practicableto project management. However, the method of optimizing the cash flow based on time and cost risk to obtain BCWS should be considered properlyand carefully with respect to the different circumstances of the project, and an efficient and adequate interval report system should be set up on the site of the project. 展开更多
关键词 project management budgeted cost of work performed (BCWP) actual cost work performed (ACWP) budget cost of workscheduled (BCWS)
下载PDF
Cost and value in medical education:the role of statistical process control 被引量:1
4
作者 Kieran Walsh 《The Journal of Biomedical Research》 CAS CSCD 2017年第4期277-278,共2页
Medical education is associated with significant costs[1].These costs have led to a growing interest in how to deliver high quality or high quantity education on a limited budget.This in turn has led to an interest in... Medical education is associated with significant costs[1].These costs have led to a growing interest in how to deliver high quality or high quantity education on a limited budget.This in turn has led to an interest in how best to measure quantity,quality and cost and how to track these variables over time.The ultimate aim of the interest in cost and value in medical education is to 展开更多
关键词 ultimate deliver budget costs chart deviation expensive curriculum likely educational
下载PDF
The Analysis and Modification of Opportunity Cost of Investment 被引量:1
5
作者 Wei Lu 《Chinese Business Review》 2005年第3期72-74,共3页
We think we should use basic return rate of industry to measure the opportunity cost of capital and use the rule of Maximum NPV (Net Present Value) to modify the wrong solution in the book.
关键词 capital budget limit opportunity cost basic return rate of industry rule of Maximum NPV (Net Present Value)
下载PDF
全成本预算绩效管理的改革实践与未来展望 被引量:4
6
作者 马蔡琛 朱雯瑛 《经济与管理研究》 CSSCI 北大核心 2024年第2期87-97,共11页
全成本预算绩效管理通过打开成本的“黑箱”,进一步增强了成本与产出之间的实质联系,是避免预算绩效管理流于形式的关键所在。本文针对预算管理实践中存在的成本核定不准确、预算投入不合理等问题,从理论机制和实践应用两个方面入手,深... 全成本预算绩效管理通过打开成本的“黑箱”,进一步增强了成本与产出之间的实质联系,是避免预算绩效管理流于形式的关键所在。本文针对预算管理实践中存在的成本核定不准确、预算投入不合理等问题,从理论机制和实践应用两个方面入手,深入剖析了全成本预算绩效管理区别于传统预算绩效管理的主要特征与关键优势。面对成本界定、成本分摊与成本效益信息运用中的诸多挑战,本文提出在考虑成本生成主体的基础之上,构建基于不同主体的成本核算机制,统一成本分摊标准,审慎考虑成本效益分析的实施项目与运用程度,实行绩效奖励与收入分成机制。本文希望为进一步深化预算绩效管理改革提供有效抓手。 展开更多
关键词 全成本预算 预算绩效管理 成本效益分析 现代预算制度
下载PDF
Inflammatory bowel disease:Efficient remission maintenance is crucial for cost containment
7
作者 Giovanni C Actis Rinaldo Pellicano 《World Journal of Gastrointestinal Pharmacology and Therapeutics》 CAS 2017年第2期114-119,共6页
The inflammatory bowel diseases(IBD) are chronicincurable inflammatory disorders of the gut. Some 10% run a downhill course, requiring emergency medical support and often surgery; another small subset are monogenic, a... The inflammatory bowel diseases(IBD) are chronicincurable inflammatory disorders of the gut. Some 10% run a downhill course, requiring emergency medical support and often surgery; another small subset are monogenic, and, threatening pediatric patients, are the challenge of these days. The majority of the IBDs, however, are polygenic low-penetrance diseases, running a lifetime waxing-and-waning course. The prevalent trend is towards a slow worsening and steady cost increase. Each and all drugs of the available arsenal exhibit strengths and weaknesses: Mesalamines are chiefly effectively for mildmoderate colitis, and do not work in Crohn's; steroids do not control some 40% of the ulcerative colitis cases, and are not indicated for Crohn's; thiopurines are effective in the maintenance of the IBDs but do not prevent relapses on withdrawal; biologics are still being used empirically(not monitored) causing further increase of their cost over that of hospitalization. Against all these caveats, two simple rules still hold true: Strict adherence maintenance and avoidance of colitogenic drugs. This matter is expanded in this minireview. 展开更多
关键词 Inflammatory bowel disease THERAPY cost containment budget Treatment adherence Inflammatory bowel disease managed care
下载PDF
Cost Utility Analysis of Dapagliflozin in Egyptian Patients with CKD from the Payer Perspective
8
作者 Gamal Saadi Magdy Elsharkawy +2 位作者 Gamal Fathy El-Naggar Ahmed F. Elkeraie Emad R. Issak 《Open Journal of Nephrology》 2023年第4期435-450,共16页
Background: Chronic kidney disease is a serious public health issue in Egypt. An estimated 13% of individuals in Egypt are expected to have CKD, with a higher prevalence among older adults and in rural regions. The pr... Background: Chronic kidney disease is a serious public health issue in Egypt. An estimated 13% of individuals in Egypt are expected to have CKD, with a higher prevalence among older adults and in rural regions. The primary goal of the study was to compare the cost-utility of the standard of care alone against add-on medication, dapagliflozin, as a preventative measure against complications of CKD in cases with or without diabetes mellitus. Methods: A lifetime Markov state transition model with a 3-month cycle was employed based on the clinical evidence from the DAPA-CKD clinical trial. The model was to provide estimates of the long-term economic and health impact of managing CKD patients. Cost-effectiveness is assessed regarding the cost per quality-adjusted life year (QALY) gained. This economic evaluation study used a payer perspective. Moreover, the study evaluated the impact on the budget due to the undertaking of dapagliflozin. One-way deterministic sensitivity analyses, as well as a probabilistic sensitivity analysis, were employed. Results: During a lifetime horizon, the difference in cost between dapagliflozin and SOC was EGP -65,212 (USD 2126.89). The difference in QALY between dapagliflozin and SOC was 4.3. In CKD patients, adding dapagliflozin to ramipril generates better QALYs and lower costs than ramipril alone. Dapagliflozin improved the outcomes and generated cost savings. A deterministic one was sensitivity analysis revealed that the model is robust to changes in all variables included. Probabilistic sensitivity analysis using Monte Carlo simulation with 10,000 iterations showed that in about 82.64% of trials, dapagliflozin is cost-saving. The undertaking of dapagliflozin by any percent will have a positive impact on the budget. Conclusion: During the lifetime horizon, dapagliflozin is cost-saving;it benefits the quality of life and the total cost. The addition of dapagliflozin to SOC has a saving effect of 11.9% of the budget. 展开更多
关键词 Chronic Kidney Disease Sodium-Glucose Cotransporter-2 Inhibitors DAPAGLIFLOZIN cost-UTILITY budget Impact
下载PDF
海洋石油工程项目建设成本管理思路 被引量:1
9
作者 单晓亮 《化工管理》 2024年第16期12-14,共3页
海洋石油工程项目的开展对缓解中国石油资源紧缺有重大意义及价值。这类项目建设运行具有高风险、工程周期长、海上运输工作量大、长期合作企业多、管理环节错综复杂等特点,实施过程应加强成本管理工作,有效提升企业的经济效益,降低建... 海洋石油工程项目的开展对缓解中国石油资源紧缺有重大意义及价值。这类项目建设运行具有高风险、工程周期长、海上运输工作量大、长期合作企业多、管理环节错综复杂等特点,实施过程应加强成本管理工作,有效提升企业的经济效益,降低建设风险。文章结合海洋石油工程项目管理中加强成本管理的价值意义分析出发,对当前成本管理工作开展中的现状及实施路径进行了综合探究,着重从成本管理构架、成本预算管理、成本控制要点、成本核算分析、成本考核等方面阐述,以期提升中国海上工程项目建设国际市场竞争力。 展开更多
关键词 海洋石油 工程项目 施工成本 成本控制 预算管理
下载PDF
支持热力图等级偏好的路径规划算法
10
作者 孙焕良 马晓慧 +1 位作者 王亚星 刘俊岭 《计算机与数字工程》 2024年第1期9-17,共9页
热力图以颜色直观地反映人群密度、空间质量等特征的空间分布规律。现实应用中存在避开空气质量差或人群密度大等热力图等级偏好的路线需求,文中提出了支持热力图等级偏好的路径规划问题,规划出一条从起点到终点的路径,该路径花费的成... 热力图以颜色直观地反映人群密度、空间质量等特征的空间分布规律。现实应用中存在避开空气质量差或人群密度大等热力图等级偏好的路线需求,文中提出了支持热力图等级偏好的路径规划问题,规划出一条从起点到终点的路径,该路径花费的成本代价不超过给定的路径成本预算,且满足避开热力图等级偏好的路段(命名危险路段)长度最小化。首先提出一种两阶段的危险网格替换算法,第一阶段规划出一条从起点到终点的最短路径,第二阶段对最短路径中不支持热力图等级偏好的危险网格进行替换。为简化路径搜索过程,提出一种基于危险区域规避图路径查询算法,将热力图中的危险区域近似成矩形结构,生成危险区域规避图,在图上进行路径查询。最后,在真实的数据集上进行充分的测试,验证了所提出算法的有效性。 展开更多
关键词 路径规划 热力图等级偏好 路径成本预算 危险区域
下载PDF
加氢站预算定额消耗量准确性的影响因素及提升策略研究
11
作者 孙春玲 郑晓茹 +1 位作者 柯洪 张静 《太阳能学报》 EI CAS CSCD 北大核心 2024年第10期54-60,共7页
分别从定额编制、施工安装、外部环境3个层面识别加氢站预算定额消耗量准确性的影响因素,通过因子分析法对影响因素进行公因子提取和关键因素提炼。结果表明:5个公因子对加氢站预算定额准确性皆有显著影响,其影响程度为编制方法与依据&... 分别从定额编制、施工安装、外部环境3个层面识别加氢站预算定额消耗量准确性的影响因素,通过因子分析法对影响因素进行公因子提取和关键因素提炼。结果表明:5个公因子对加氢站预算定额准确性皆有显著影响,其影响程度为编制方法与依据>施工安装技术>施工组织管理>编制组织与成员>外部环境;安装技术更新速度、编制方法与测定对象的匹配性和施工工艺规范度是影响消耗量准确性的关键因素。据此探讨消耗量准确性的提升策略:缩短定额修订时间,建立长效管理机制;提高编制方法与测定对象的匹配度;明确加氢站现场施工规范,缩小施工偏差影响。 展开更多
关键词 氢能 造价工程 因子分析 预算定额 消耗量准确性 影响因素分析
下载PDF
DIP支付模式下公立医院运营管理优化路径研究 被引量:2
12
作者 何慧莹 张萍 +3 位作者 汤广龄 张芷菁 费凡 钟敏华 《现代医院》 2024年第2期165-167,171,共4页
随着公立医院综合改革进入深水区,粗放的运营管理已不符合高质量发展的需要。文章探讨了DIP支付模式下医院运营管理的现状问题,探索提出了优化路径及落地实践的要点,即以病种组合及分值为基础,实施预算绩效一体化闭环的资源配置策略、... 随着公立医院综合改革进入深水区,粗放的运营管理已不符合高质量发展的需要。文章探讨了DIP支付模式下医院运营管理的现状问题,探索提出了优化路径及落地实践的要点,即以病种组合及分值为基础,实施预算绩效一体化闭环的资源配置策略、提升资源效能的成本管理机制、激发人员自生管理动力的绩效分配制度,并提出了建设管理信息系统的建议,进而为DIP支付模式下公立医院提升运营管理能力提供实践参考。 展开更多
关键词 运营管理 DIP支付 预算管理 成本管理 绩效管理
下载PDF
考虑用户出行成本预算的电力-交通耦合网络充电站定价策略 被引量:1
13
作者 谢龙韬 谢仕炜 +2 位作者 陈铠悦 张亚超 陈之栋 《电力系统自动化》 EI CSCD 北大核心 2024年第7期201-209,共9页
随着电动汽车的规模化发展,研究如何有效考虑用户的出行行为机理并制定合理的充电站充电价格,对电力-交通网络的协同优化调度具有重大意义。针对此问题,提出了考虑用户出行成本预算的电力-交通耦合网络充电站定价策略。首先,建立考虑出... 随着电动汽车的规模化发展,研究如何有效考虑用户的出行行为机理并制定合理的充电站充电价格,对电力-交通网络的协同优化调度具有重大意义。针对此问题,提出了考虑用户出行成本预算的电力-交通耦合网络充电站定价策略。首先,建立考虑出行成本预算的交通用户均衡模型,将均衡状态通过变分不等式进行等效描述,从而对电动汽车出行需求和充电行为进行刻画。其次,构建考虑功率削减的配电网二阶锥优化模型,将充电站定价问题转化为含有变分不等式约束的优化问题,并根据问题设计交替迭代算法和外梯度算法进行求解。最后,通过算例对所提模型和方法的有效性进行验证,结果表明了考虑出行成本预算对耦合网络充电定价的必要性。 展开更多
关键词 电动汽车 电力-交通耦合网络 变分不等式 出行成本预算 交通用户均衡 充电站定价
下载PDF
影响建筑工程造价超预算的因素及控制策略研究 被引量:2
14
作者 潘玉群 《建筑技术开发》 2024年第1期108-110,共3页
建筑工程造价是对建筑项目在实施过程中所需要的各种费用进行合理的规划,通过对工程造价进行合理的预算,从而提高项目的经济效益,为项目的顺利开展提供保障。但是在实际工程实施过程中,常会出现超预算现象,对项目成本造成较大影响。因此... 建筑工程造价是对建筑项目在实施过程中所需要的各种费用进行合理的规划,通过对工程造价进行合理的预算,从而提高项目的经济效益,为项目的顺利开展提供保障。但是在实际工程实施过程中,常会出现超预算现象,对项目成本造成较大影响。因此,本文就影响建筑工程造价超预算问题的因素进行分析,并提出相应控制措施,以期为建筑企业提高项目经济效益提供参考意见,从而促进建筑行业的发展。 展开更多
关键词 建筑工程造价 超预算 控制策略
下载PDF
我国中老年人助听器康复干预的经济学评价研究
15
作者 叶欣 朱大伟 +1 位作者 陈思源 何平 《中国卫生事业管理》 北大核心 2024年第7期759-764,共6页
目的:对助听器康复干预进行成本效果分析,并考虑将助听器纳入医疗保险后对医保预算的影响。方法:利用在山东省临沂市开展的助听器康复干预的随机对照试验,通过双重差分法进行增量成本效果分析,以年人均国内生产总值作为是否具有成本效... 目的:对助听器康复干预进行成本效果分析,并考虑将助听器纳入医疗保险后对医保预算的影响。方法:利用在山东省临沂市开展的助听器康复干预的随机对照试验,通过双重差分法进行增量成本效果分析,以年人均国内生产总值作为是否具有成本效果的阈值;其次进行预算影响分析,测算在不同助听器报销比例下的医保预算费用变动。结果:假设每副助听器的购买费用为10,000元,助听器的平均使用年限为n年,若n>2.20,则干预非常具有成本效果;若1.88<n<2.20,则干预增加的成本效果可以接受;若n<1.88,则干预措施不具有成本效果。若将助听器购买费用纳入医疗保险系统,最多约需3.25年医保预算即可持平。结论:助听器干预是一种具有成本效果的听力康复手段,且若将其纳入医保报销,长期来看可节约医保预算。因此,本研究建议完善与听力障碍康复相关的保障政策,如鼓励助听器技术的研发和创新、推动将助听器纳入医保报销等,从而促进听力治疗和康复干预。 展开更多
关键词 助听器 干预 成本效果分析 预算影响评价
下载PDF
政府购买服务项目成本预算绩效分析
16
作者 钟秋 曹堂哲 张喆 《经济研究参考》 2024年第8期128-142,共15页
随着各地各部门政府购买服务改革的持续深化,对政府购买服务类项目开展成本预算绩效分析成为提升公共服务绩效、优化财政资金投入的重要管理方式之一。国内预算绩效管理改革逐渐向成本预算绩效方向持续深入,北京、上海、山东、江苏等地... 随着各地各部门政府购买服务改革的持续深化,对政府购买服务类项目开展成本预算绩效分析成为提升公共服务绩效、优化财政资金投入的重要管理方式之一。国内预算绩效管理改革逐渐向成本预算绩效方向持续深入,北京、上海、山东、江苏等地开展了政府购买服务成本预算绩效管理的探索实践,取得了一定成效。近年来,全国各地对城市餐厨垃圾无害化、资源化处理的财政资金投入不断加大,以城市餐厨垃圾处置费为案例开展成本预算绩效分析具有重要现实意义。本文借鉴“工作分解结构”(WBS)、作业成本法、成本效益分析等方法,基于“活动—成本”二维框架,建构了成本预算绩效分析“九步法”,然后以A市“城市餐厨垃圾处置项目”为实例,检验了该方法的有效性,为丰富其他类型项目的成本预算绩效分析提供了借鉴和参考。 展开更多
关键词 政府购买服务绩效 成本预算绩效分析 预算绩效管理
下载PDF
地方党政机关过紧日子面临的现实难题与解决思路 被引量:1
17
作者 林雅琪 《财政科学》 CSSCI 2024年第3期125-131,共7页
过紧日子是中国共产党治国理政的重要理念和优良传统。本文通过溯源我们党在财政上过紧日子的历史,分析当前地方党政机关存在的过紧日子理念贯通难、结构性制约、手段不完备、治理机制不完善等问题,提出习惯过紧日子并把紧日子过得更紧... 过紧日子是中国共产党治国理政的重要理念和优良传统。本文通过溯源我们党在财政上过紧日子的历史,分析当前地方党政机关存在的过紧日子理念贯通难、结构性制约、手段不完备、治理机制不完善等问题,提出习惯过紧日子并把紧日子过得更紧更实的应对之策。 展开更多
关键词 过紧日子 零基预算 成本效益 治理机制
下载PDF
投入产出绩效管理模式:天津市预算绩效管理提质增效的创新探索
18
作者 于兵 韩国英 +1 位作者 曹堂哲 罗旭东 《财政科学》 CSSCI 2024年第4期46-54,共9页
近年来,天津市财政局面对突出的收支矛盾,针对绩效管理投入端“重花钱、轻成本”,产出端“重完成、轻效益”,投入和产出两端“欠融合、轻衔接”等问题,进行了“投入产出绩效管理”新模式的预算改革,旨在构建投入端“讲成本”、支出端“... 近年来,天津市财政局面对突出的收支矛盾,针对绩效管理投入端“重花钱、轻成本”,产出端“重完成、轻效益”,投入和产出两端“欠融合、轻衔接”等问题,进行了“投入产出绩效管理”新模式的预算改革,旨在构建投入端“讲成本”、支出端“讲效益”、过程监督“重衔接”的财政预算管理机制;在预算绩效管理各环节中引入成本核算,运用投入产出分析等方法完善绩效预算,实现业务和财务融合、成本和效益对应、政策目标和公共资源匹配。同时,对如何进一步深入推进改革提出了具体思路,以期为实现预算绩效管理提质增效探索创新路径。 展开更多
关键词 预算绩效管理 投入产出 成本效益 业财融合
下载PDF
概预算编制对工程造价的影响及应对策略 被引量:1
19
作者 巩燃燃 《化工管理》 2024年第1期23-26,共4页
概预算编制是工程项目实施过程中不可或缺的重要环节,是工程造价管理的核心内容,因此概预算编制工作对工程项目顺利实施具有重要意义。文章首先对概预算编制概念及方法进行了阐述,其次从三个方面分析了概预算编制对工程造价的影响,最后... 概预算编制是工程项目实施过程中不可或缺的重要环节,是工程造价管理的核心内容,因此概预算编制工作对工程项目顺利实施具有重要意义。文章首先对概预算编制概念及方法进行了阐述,其次从三个方面分析了概预算编制对工程造价的影响,最后重点探讨了提升概预算编制质量策略。 展开更多
关键词 概预算编制 工程造价 质量策略
下载PDF
建筑工程造价预算有效控制研究
20
作者 郝瑞荣 《工程建设与设计》 2024年第21期269-271,共3页
阐明建筑工程造价预算有效控制所遵循的原则,如全面性原则、目标管理原则等;深度剖析其存在的主要问题,如预算编制不准确、施工时变更与索赔管理不佳等;提出一系列行之有效的造价预算控制方法,涵盖提升预算编制的准确性、加强施工过程... 阐明建筑工程造价预算有效控制所遵循的原则,如全面性原则、目标管理原则等;深度剖析其存在的主要问题,如预算编制不准确、施工时变更与索赔管理不佳等;提出一系列行之有效的造价预算控制方法,涵盖提升预算编制的准确性、加强施工过程中的成本控制、强化变更管理以及构建科学的风险管理机制等。 展开更多
关键词 建筑工程 工程造价 预算 造价控制
下载PDF