期刊文献+
共找到81篇文章
< 1 2 5 >
每页显示 20 50 100
Cost Control Strategies for Hubei General Highway Greening Project
1
作者 ZHANG Qian HUANG Yaojun AN Yunhua 《Journal of Landscape Research》 2024年第4期17-20,共4页
In order to respond to the national policy of focusing on the service of building a new development pattern and promoting high-quality development,and to reduce the cost of greening projects while ensuring the effect ... In order to respond to the national policy of focusing on the service of building a new development pattern and promoting high-quality development,and to reduce the cost of greening projects while ensuring the effect of highway landscape,a process and cost control points of highway greening design,construction,and maintenance are summarized through a review of the literature.Additionally,this paper examines the attributes of highway greening and proposes cost control strategies that are aligned with these attributes.It is proposed that the implementation of cost control strategies for highway greening should commence at the project establishment phase,with the objective of establishing a comprehensive and effective cost management control system.While guaranteeing the greening landscape effect and the duration of the project,it is essential to regulate the crucial nodes in each phase of the design,construction,and maintenance process.Furthermore,it is vital to facilitate close collaboration between all parties involved,thereby reducing costs,conserving resources,and lowering energy consumption.This approach can also lead to enhanced economic and social benefits for highway greening projects. 展开更多
关键词 General highway Highway greening Greening project cost control
下载PDF
Cost Control Strategies in the Pre-Construction Period of Highway Construction
2
作者 Chunbo Chen 《Journal of Architectural Research and Development》 2024年第3期104-109,共6页
Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading ... Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading to budget overruns and project delays during later stages.To ensure the smooth execution and cost control of highway construction projects,this paper examines the significance of cost control,evaluates the current state and challenges of highway construction,and proposes strategies for cost management.These strategies aim to establish a robust foundation for cost management in highway projects. 展开更多
关键词 Highway construction Preliminary management cost control Contract management Investment estimate
下载PDF
Whole-Process Project Cost Management Based on Building Information Modeling (BIM)
3
作者 Liping Yan 《Journal of Architectural Research and Development》 2024年第4期57-62,共6页
The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the a... The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the application of BIM technology.This paper summarizes and analyzes the whole-process project cost management based on BIM,aiming to explore its application and development prospects in the construction industry.Firstly,this paper introduces the role and advantages of BIM technology in engineering cost management,including information integration,data sharing,and collaborative work.Secondly,the paper analyzes the key technologies and methods of the whole-process project cost management based on BIM,including model construction,data management,and cost control.In addition,the paper also discusses the challenges and limitations of the whole-process BIM project cost management,such as the inconsistency of technical standards,personnel training,and consciousness change.Finally,the paper summarizes the advantages and development prospects of the whole-process project cost management based on BIM and puts forward the direction and suggestions for future research.Through the research of this paper,it can provide a reference for construction cost management and promote innovation and development in the construction industry. 展开更多
关键词 Building Information Modeling(BIM) Project cost management Data integration Information sharing cost control
下载PDF
Analysis of the Current Situation of Cost Management and Control of Highway Construction Projects
4
作者 Pei Liu 《Journal of Architectural Research and Development》 2024年第5期30-35,共6页
The highway engineering process is complex,coupled with a relatively long construction period,hence requires increased coordination between participating units to prevent economic disputes and efficiency losses.The ma... The highway engineering process is complex,coupled with a relatively long construction period,hence requires increased coordination between participating units to prevent economic disputes and efficiency losses.The main body of the construction project needs to strengthen the management and control of funds.In this regard,this paper analyzes the importance of cost management in highway projects by clarifying and analyzing the current cost management status quo problems and causes.The highway engineering cost control strategy and implementation methods are summarized to provide references for improving the quality of highway engineering. 展开更多
关键词 Highway engineering cost management Management status cost control
下载PDF
Construction Cost Control Strategy of Finished House Based on BIM-5D
5
作者 Dongchun Xia Xinyue Zhou 《Journal of World Architecture》 2024年第4期15-20,共6页
Building Information Modeling(BIM)technology can not only achieve project refinement management of the construction process based on a 3D model but also form a BIM-5D model based on the fusion of progress data and cos... Building Information Modeling(BIM)technology can not only achieve project refinement management of the construction process based on a 3D model but also form a BIM-5D model based on the fusion of progress data and cost data to achieve the dynamic control of the whole process of project cost.This paper discusses the application of BIM-5D in the cost control of finished house construction,aiming to provide technical reference for China’s finished house project units,so that they can master how to realize the construction of cost control system based on BIM,the monitoring of the key coefficients of the cost,corrective action,to ensure that the project cost deviation is within the controllable range,and to make an effective guarantee for the economic benefits of the project construction. 展开更多
关键词 BIM-5D Finished house project cost control system cost corrective deviation
下载PDF
Cost Management and Cost Control of Photovoltaic Projects
6
作者 Weimin Lv 《Journal of Architectural Research and Development》 2024年第4期63-70,共8页
With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovo... With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovoltaic projects make cost management and cost control the key to project success.The purpose of this paper is to discuss the cost management and cost control strategies of photovoltaic projects,analyze their importance and challenges in the process of project implementation,and discuss the common cost control methods and techniques in photovoltaic projects,to improve cost management and cost control in photovoltaic projects,and to provide a reference for the sustainable development of the industry. 展开更多
关键词 Photovoltaic engineering cost management cost control
下载PDF
Discussion on Cost Budgeting and Cost Control Strategies for Prefabricated Construction Projects
7
作者 Congzi Cheng 《Journal of Architectural Research and Development》 2024年第4期17-23,共7页
In the process of China’s national economic development,the construction industry is a very important component and has a direct impact on the level of China’s economic construction.Nowadays,the development speed of... In the process of China’s national economic development,the construction industry is a very important component and has a direct impact on the level of China’s economic construction.Nowadays,the development speed of the prefabricated construction industry is constantly accelerating.To effectively ensure the economic benefits of engineering projects,it is necessary to comprehensively strengthen cost budgeting and cost control.This article analyzes the cost budget of prefabricated construction projects,introduces the application advantages of prefabricated construction,and proposes specific cost budgeting and cost control measures,hoping to provide some reference for relevant researchers. 展开更多
关键词 Prefabricated building Engineering cost budget cost control
下载PDF
Utilization Management:Walking the Line Between Patient Needs and Healthcare Economics-Short Communication
8
作者 Kirubanandan Shanmugam 《Journal of Clinical and Nursing Research》 2024年第9期152-158,共7页
Utilization management plays a crucial role in healthcare by optimizing resource allocation,improving patient outcomes,and effectively controlling costs.By balancing patient needs with economic considerations,healthca... Utilization management plays a crucial role in healthcare by optimizing resource allocation,improving patient outcomes,and effectively controlling costs.By balancing patient needs with economic considerations,healthcare institutions can ensure efficient and sustainable service delivery.Utilization management encompasses various strategies,including prior authorization,concurrent review,and clinical pathways,to enhance care quality,manage expenses,and streamline resource use.The benefits of utilization management include cost containment,improved care standards,and the implementation of consistent treatment guidelines,thereby increasing the overall efficiency and effectiveness of healthcare delivery. 展开更多
关键词 Utilization management Patient outcomes cost control Clinical pathways Care standards
下载PDF
Study on Influencing Factors and Control Points of Design Estimate of Landscaping Engineering
9
作者 Dan Zhang Meng Wu +1 位作者 Jiashuo Zhao Jie Di 《Journal of Architectural Research and Development》 2024年第5期13-19,共7页
In recent years,China’s landscaping projects have developed vigorously,and the growth rate of urban garden green space areas has been maintained at about 5%.Overall,with the development of the national economy and th... In recent years,China’s landscaping projects have developed vigorously,and the growth rate of urban garden green space areas has been maintained at about 5%.Overall,with the development of the national economy and the support of macro policies,people’s demand for close to nature and beautify the environment is gradually increasing,which has brought new growth momentum for the development of the landscaping industry.Simultaneously,from the perspective of future economic development and urban development,the landscaping industry still has a lot of room for development.However,with the rapid development of landscape engineering,the problem of cost control of landscape engineering is becoming more prominent,the phenomenon of budget overestimation is common,and there are many factors affecting the cost of landscape engineering,which brings difficulties and challenges to the analysis of its influencing factors and cost management.How to scientifically analyze the influencing factors and control the cost has become an important link in the landscaping project.To solve the above problems,this paper takes the design stage of landscaping engineering as the background,takes the design estimate of landscaping engineering as the research object,through literature research and data collection,fully excavates the main influencing factors of the design estimate stage of landscaping engineering,analyzes the key points of cost control,and provides reference ideas and directions for the later cost management and control. 展开更多
关键词 Landscape engineering Design estimate Main influencing factors cost control
下载PDF
An LMI Method to Robust Iterative Learning Fault-tolerant Guaranteed Cost Control for Batch Processes 被引量:11
10
作者 王立敏 陈曦 高福荣 《Chinese Journal of Chemical Engineering》 SCIE EI CAS CSCD 2013年第4期401-411,共11页
Based on an equivalent two-dimensional Fornasini-Marchsini model for a batch process in industry, a closed-loop robust iterative learning fault-tolerant guaranteed cost control scheme is proposed for batch processes w... Based on an equivalent two-dimensional Fornasini-Marchsini model for a batch process in industry, a closed-loop robust iterative learning fault-tolerant guaranteed cost control scheme is proposed for batch processes with actuator failures. This paper introduces relevant concepts of the fault-tolerant guaranteed cost control and formulates the robust iterative learning reliable guaranteed cost controller (ILRGCC). A significant advantage is that the proposed ILRGCC design method can be used for on-line optimization against batch-to-batch process uncertainties to realize robust tracking of set-point trajectory in time and batch-to-batch sequences. For the convenience of implementation, only measured output errors of current and previous cycles are used to design a synthetic controller for iterative learning control, consisting of dynamic output feedback plus feed-forward control. The proposed controller can not only guarantee the closed-loop convergency along time and cycle sequences but also satisfy the H∞performance level and a cost function with upper bounds for all admissible uncertainties and any actuator failures. Sufficient conditions for the controller solution are derived in terms of linear matrix inequalities (LMIs), and design procedures, which formulate a convex optimization problem with LMI constraints, are presented. An example of injection molding is given to illustrate the effectiveness and advantages of the ILRGCC design approach. 展开更多
关键词 two-dimensional Fornasini-Marchsini model batch process iterative learning control linear matrix inequality fault-tolerant guaranteed cost control
下载PDF
Decentralized robust guaranteed cost control for a class of interconnected singular large-scale systems with time-delay and parameter uncertainty 被引量:8
11
作者 Wo Songlin Shi Guodong Zou Yun 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2007年第1期111-119,共9页
The decentralized robust guaranteed cost control problem is studied for a class of interconnected singular large-scale systems with time-delay and norm-bounded time-invariant parameter uncertainty under a given quadra... The decentralized robust guaranteed cost control problem is studied for a class of interconnected singular large-scale systems with time-delay and norm-bounded time-invariant parameter uncertainty under a given quadratic cost performance function. The problem that is addressed in this study is to design a decentralized robust guaranteed cost state feedback controller such that the closed-loop system is not only regular, impulse-free and stable, but also guarantees an adequate level of performance for all admissible uncertainties. A sufficient condition for the existence of the decentralized robust guaranteed cost state feedback controllers is proposed in terms of a linear matrix inequality (LMI) via LMI approach. When this condition is feasible, the desired state feedback decentralized robust guaranteed cost controller gain matrices can be obtained. Finally, an illustrative example is provided to demonstrate the effectiveness of the proposed approach. 展开更多
关键词 Uncertain singular large-scale systems Time-delay system Guaranteed cost control LMI
下载PDF
Robust reliable guaranteed cost control for uncertain singular systems with time-delay 被引量:4
12
作者 Qixun Lan Yuxiao Liu +1 位作者 Huawei Niu Jiarong Liang 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2010年第1期110-117,共8页
The robust reliable guaranteed cost control for uncertain singular delay systems with actuator failures and a given quadratic cost function is studied. The system under consideration involves constant time-delay and n... The robust reliable guaranteed cost control for uncertain singular delay systems with actuator failures and a given quadratic cost function is studied. The system under consideration involves constant time-delay and norm-bounded parameter uncertainties. The purpose is to design state feedback controllers which can tolerate actuator failure, such that the closed-loop system is stable, and the specified cost function has an upper bound for all admissible uncertainties. The sufficient conditions for the solvability of this problem are obtained by a linear matrix inequality (LMI) method. Furthermore, a numerical example is given to demonstrate the applicability of the proposed approach. 展开更多
关键词 singular system reliable control guaranteed cost control actuator failure linear matrix inequality time-delay.
下载PDF
Non-fragile guaranteed cost control of discrete-time fuzzy bilinear system 被引量:5
13
作者 Guo Zhang Junmin Li 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2010年第4期629-634,共6页
This paper focuses on the problem of non-fragile guaranteed cost control for a class of T-S discrete-time fuzzy bilinear systems(DFBS).Based on the parallel distributed compensation(PDC) approach,the sufficient co... This paper focuses on the problem of non-fragile guaranteed cost control for a class of T-S discrete-time fuzzy bilinear systems(DFBS).Based on the parallel distributed compensation(PDC) approach,the sufficient conditions are derived such that the closed-loop system is asymptotically stable and the cost function value is no more than a certain upper bound in the presence of the additive controller gain perturbations.The non-fragile guaranteed cost controller can be obtained by solving a set of bilinear matrix inequalities(BMIs).The Van de Vusse model is utilized to demonstrate the validity and effectiveness of the proposed approach. 展开更多
关键词 discrete-time fuzzy bilinear system(DFBS) nonfragile control guaranteed cost control bilinear matrix inequality(BMI).
下载PDF
Guaranteed Cost Active Fault-tolerant Control of Networked Control System with Packet Dropout and Transmission Delay 被引量:5
14
作者 Xiao-Yuan Luo Mei-Jie Shang +1 位作者 Cai-Lian Chen Xin-Ping Guan 《International Journal of Automation and computing》 EI 2010年第4期509-515,共7页
The problem of guaranteed cost active fault-tolerant controller (AFTC) design for networked control systems (NCSs) with both packet dropout and transmission delay is studied in this paper. Considering the packet d... The problem of guaranteed cost active fault-tolerant controller (AFTC) design for networked control systems (NCSs) with both packet dropout and transmission delay is studied in this paper. Considering the packet dropout and transmission delay, a piecewise constant controller is adopted. With a guaranteed cost function, optimal controllers whose number is equal to the number of actuators are designed, and the design process is formulated as a convex optimal problem that can be solved by existing software. The control strategy is proposed as follows: when actuator failures appear, the fault detection and isolation unit sends out the information to the controller choosing strategy, and then the optimal stabilizing controller with the smallest guaranteed cost value is chosen. Two illustrative examples are given to demonstrate the effectiveness of the proposed approach. By comparing with the existing methods, it can be seen that our method has a better performance. 展开更多
关键词 Networked control system (NCS) packet dropout transmission delay active fault-tolerant control (AFTC) guaranteed cost controller.
下载PDF
Delay-independent robust guaranteed-cost control for uncertain linear neutral systems 被引量:4
15
作者 Li Hongfei Zhou Jun 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2007年第4期858-864,共7页
This article concerns the delay-independent guaranteed-cost control problem via memoryless state feedback for a class of neutral-type systems with structural uncertainty and a given quadratic cost function. New delay-... This article concerns the delay-independent guaranteed-cost control problem via memoryless state feedback for a class of neutral-type systems with structural uncertainty and a given quadratic cost function. New delay-independent conditions for the existence of the guaranteed-cost controller are presented in the term of LMIs. An algorithm involving optimization is proposed to design a controller achieving an optimal guaranteed-cost, such that, the system can be stabilized for all admissible uncertainties. A numerical example is provided to illustrate the feasibility of the proposed method. 展开更多
关键词 neutral system guaranteed cost control LMI method DELAY-INDEPENDENT
下载PDF
Guaranteed cost control of networked control systems under limited communication capacity and variable sampling 被引量:3
16
作者 刘英英 褚云凯 车伟伟 《Journal of Central South University》 SCIE EI CAS 2014年第3期978-986,共9页
The problem of guaranteed cost control for the networked control systems(NCSs) with time-varying delays, time-varying sampling intervals and signals quantization was investigated, wherein the physical plant was contin... The problem of guaranteed cost control for the networked control systems(NCSs) with time-varying delays, time-varying sampling intervals and signals quantization was investigated, wherein the physical plant was continuous-time one, and the control input was discrete-time one. By using an input delay approach and a sector bound method, the network induced delays, quantization parameter and sampling intervals were presented in one framework in the case of the state and the control input by quantized in a logarithmic form. A novel Lyapunov function with discontinuity, which took full advantages of the NCS characteristic information, was exploited. In addition, it was shown that Lyapunov function decreased at the jump instants. Furthermore, the Leibniz-Newton formula and free-weighting matrix methods were used to obtain the guaranteed cost controller design conditions which were dependent on the NCS characteristic information. A numerical example was used to illustrate the effectiveness of the proposed methods. 展开更多
关键词 networked control systems (NCSS) QUANTIZATION time-varying delays time-varying sampling guaranteed cost control
下载PDF
Investigation on Relationship between Cost and Software Reliability 被引量:3
17
作者 XURen-zuo HANYi-fan HUANGCan YAOJun-feng 《Wuhan University Journal of Natural Sciences》 EI CAS 2005年第1期9-12,共4页
Based on the fact that the software development cost is an important factorto control the whole project, we discuss the relationship between the software development cost andsoftware reliability according to the empir... Based on the fact that the software development cost is an important factorto control the whole project, we discuss the relationship between the software development cost andsoftware reliability according to the empirieal data collected from the development process. Byevolutionary modeling we get an empirical model of the relationship between cost and softwarereliability, and validate the estimate results with the empirical data. 展开更多
关键词 cost controlling softwaie reliability: software development cost empiricaldata evolutionary modeling
下载PDF
Guaranteed cost control with constructing switching law of uncertain discrete-time switched systems 被引量:3
18
作者 Zhang Ying Duan Guangren 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2007年第4期846-851,共6页
A guaranteed cost control problem for a class of linear discrete-time switched systems with norm-bounded uncertainties is considered in this article. The purpose is to construct a switching rule and design a state fee... A guaranteed cost control problem for a class of linear discrete-time switched systems with norm-bounded uncertainties is considered in this article. The purpose is to construct a switching rule and design a state feedback control law, such that, the closed-loop system is asymptotically stable and the closed-loop cost function value is not more than a specified upper bound for all admissible uncertainties under the constructed switching rule. A sufficient condition for the existence of guaranteed cost controllers and switching rules is derived based on the Lyapunov theory together with the linear matrix inequality (LMI) approach. Furthermore, a convex optimization problem with LMI constraints is formulated to select the suboptimal guaranteed cost controller. A numerical example demonstrates the validity of the proposed design approach. 展开更多
关键词 switched systems guaranteed cost control LMI
下载PDF
Nonfragile guaranteed cost control for Delta operator-formulated uncertain time-delay systems 被引量:2
19
作者 Ruiquan LIN, Silian CHEN, Xuwei DING (College of Electrical Engineering and Automation, Fuzhou University, Fuzhou Fujian 350108, China) 《控制理论与应用(英文版)》 EI 2010年第2期233-238,共6页
With consideration that the controller parameters may vary from the designed value when the controller is realized, based on Lyapunov stability theory, a design method of nonfragile guaranteed cost control for a class... With consideration that the controller parameters may vary from the designed value when the controller is realized, based on Lyapunov stability theory, a design method of nonfragile guaranteed cost control for a class of Delta operator-formulated uncertain time-delay systems is studied. A sufficient condition for the existence of the nonfragile guaranteed cost controller is given. A numeric example is then given to illustrate the effectiveness and the feasibility of the designed method. The results show that even if the parameters of the designed controller are of variations, the closed-loop system is still asymptotically stable and the super value of the cost function can also be obtained, while the closed-loop system will be unstable if the variations of the controller parameters are not considered when the controller is designed. The nonfragile guaranteed cost controller derived from the traditional shift operator method may cause the closed-loop system to be unstable, while the nonfragile guaranteed cost controller based on Delta operator method can avoid the unstable problem of the closed-loop system. 展开更多
关键词 Delta operator Time-delay system Nonfragile control Guaranteed cost control LMI
下载PDF
Optimal guaranteed cost control for fuzzy descriptor systems with time-varying delay 被引量:2
20
作者 Tian Weihua1,2 & Zhang Huaguang3 1. School of Information Science and Engineering, Northeastern Univ., Shenyang 110004, P. R. China 2. Dept. of Automatic Control, Shenyang Inst. of Engineering, Shenyang 110136, P. R. China 3. School of Information Science and Engineering, Northeastern Univ., Shenyang 110004, P. R. China. (Received December 27, 2006) 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2008年第3期584-591,共8页
Based on the delay-independent rule, the problem of optimal guaranteed cost control for a class of Takagi-Sugeno (T-S) fuzzy descriptor systems with time-varying delay is studied. A linear quadratic cost function is... Based on the delay-independent rule, the problem of optimal guaranteed cost control for a class of Takagi-Sugeno (T-S) fuzzy descriptor systems with time-varying delay is studied. A linear quadratic cost function is considered as the performance index of the closed-loop system. Sufficient conditions for the existence of guaranteed cost controllers via state feedback are given in terms of linear matrix inequalities (LMIs), and the design of an optimal guaranteed cost controller can be reduced to a convex optimization problem. It is shown that the designed controller not only guarantees the asymptotic stability of the closed-loop fuzzy descriptor delay system, but also provides an optimized upper bound of the guaranteed cost. At last, a numerical example is given to illustrate the effectiveness of the proposed method and the perfect performance of the optimal guaranteed cost controller. 展开更多
关键词 fuzzy descriptor systems optimal guaranteed cost control time-varying delay linear matrix inequalities (LMIs).
下载PDF
上一页 1 2 5 下一页 到第
使用帮助 返回顶部